PROJ is a standard SAP HANA table in SAP ERP (or) S/4HANA system which stores Project definition data. There are total 109 fields in the table. The PROJ table can be found in the Operative Work Breakdown Structure (CN_PSP_OPR) package and is part of the Operative Structures (PS-ST-OPR) module.

SAP HANA Table Type Column Store
Buffering Permission Buffering not allowed
Buffering Type No buffering

PROJ Table Fields

The following is the list of fields that are available in SAP PROJ table. The key fields of the table are highlighted in color.

Field Description Data Element Domain Check Table Data Type Length
MANDT Client MANDT MANDT T000 CLNT 3
PSPNR Project (internal) PS_INTNR PS_PSPNR NUMC 8
PSPID Project definition PS_PSPID PS_PSPID CHAR 24
POST1 PS: Short description (1st text line) PS_POST1 TEXT40 CHAR 40
OBJNR Object number J_OBJNR J_OBJNR ONR00 CHAR 22
ERNAM Name of Person who Created the Object ERNAM USNAM CHAR 12
ERDAT Date on which the record was created ERDAT DATUM DATS 8
AENAM Name of person who changed object AENAM USNAM CHAR 12
AEDAT Date on which object was last changed UPDAT DATUM DATS 8
KIMSK Selection mask for WBS element short IDs PS_KIMSK PS_PROID CHAR 24
AUTOD Automatic value transfer from WBS element to project def. PS_AUTOD XFELD CHAR 1
STSPD Status profile for project definition PS_STSPD J_STSMA TJ20 CHAR 8
STSPR Status profile for WBS element PS_STSPR J_STSMA TJ20 CHAR 8
VERNR Number of the Responsible Person (Project Manager) PS_VERNR PS_VERNR TCJ04 NUMC 8
VERNA Name of responsible person (Project manager) PS_VERNA PS_VERNA CHAR 25
ASTNR Applicant number PS_ASTNR PS_ASTNR TCJ05 NUMC 8
ASTNA Applicant PS_ASTNA PS_ASTNA CHAR 25
VBUKR Company code for the project PS_VBUKR BUKRS T001 CHAR 4
VGSBR Business area for the project PS_VGSBR GSBER TGSB CHAR 4
VKOKR Controlling area for the project PS_VKOKR CACCD TKA01 CHAR 4
PRCTR Profit Center PRCTR PRCTR CEPC CHAR 10
PWHIE WBS currency (project definition) PS_PWHIE WAERS TCURC CUKY 5
ZUORD Network assignment PS_ZUORD PS_ZUORD NUMC 1
TRMEQ Indicator: WBS dates detailed by activity dates PS_TRMEQ X CHAR 1
PLFAZ Project planned start date PS_PLFAZ_CHG DATUM DATS 8
PLSEZ Project planned finish date PS_PLSEZ_CHG DATUM DATS 8
WERKS Plant WERKS_D WERKS T001W CHAR 4
KALID Factory calendar key FABKL WFCID TFACD CHAR 2
VGPLF Planning method for project basic dates PS_VGPLF PSPLFRM NUMC 1
EWPLF Planning method for project forecast dates PS_EWPLF PSPLFRM NUMC 1
ZTEHT Time unit in time scheduling PS_ZTEHT MEINS T006 UNIT 3
NZANZ Indicator: Network header visible to end user NETZOBERFL X CHAR 1
PLNAW Application of the task list PLNAW PLNAW TCA09 CHAR 1
VPROF Network Profile PROFIDNZPL PROFILID TCN41 CHAR 7
PROFL Project Profile PROFIDPROJ PROFIDPROJ TCJ41 CHAR 7
BPROF Budget Profile BP_BPROFIL BP_PROFIL TBP1C CHAR 6
TXTSP Language Key SPRAS SPRAS T002 LANG 1
KOSTL Cost Center KOSTL KOSTL CSKS CHAR 10
KTRG Cost Object KSTRG KSTRG CKPH CHAR 12
AEDTE Date of last scheduling of the overall network (basic dates) PS_AEDTE DATUM DATS 8
AEDTP Date of last scheduling of the overall network (forecast) PS_AEDTP DATUM DATS 8
BERST Authorization key for project master data PS_BERST CHAR16 CHAR 16
BERTR Authorization key for project dates (WBS) PS_BERTR CHAR16 CHAR 16
BERKO Authorization key for costs and revenues PS_BERKO CHAR16 CHAR 16
BERBU Authorization key for project budget PS_BERBU CHAR16 CHAR 16
SPSNR Current number for standard project PS_ISPSP PS_ISPSP PROJS NUMC 8
BESTA Project stock PS_BESTAND XFELD CHAR 1
SCOPE Object Class SCOPE_CV SCOPE_CV CHAR 2
XSTAT Statistical WBS element PS_XSTAT XFELD CHAR 1
TXJCD Tax Jurisdiction TXJCD TXJCD TTXJ CHAR 15
ZSCHM Interest Profile for Project/Order Interest Calculation PS_ZSCHM PS_ZSCHM TPI01 CHAR 7
SCPRF Profile for WBS scheduling PS_SCHDPRF PS_SCHDPRF TCXPS CHAR 12
IMPRF Investment Measure Profile IM_PROFIL IM_PROFIL TAPRF CHAR 6
FMPRF Payment plan profile PSFM_PRF BP_PROFIL TBP1C CHAR 6
ABGSL Results Analysis Key ABGR_SCHL ABGR_SCHL TKKAA CHAR 6
POSTU PS: Short description (1st text line) in all caps PS_POSTU CHAR40 CHAR 40
PPROF Planning Profile BP_PPROFIL BP_PROFIL TBP1C CHAR 6
PLINT Indicator for Integrated Planning PLINT XFELD CHAR 1
LOEVM Deletion Indicator LOEVM XFELD CHAR 1
INACT Indicator: Project definition inactive PS_INACT XFELD CHAR 1
KZBWS Valuation of Special Stock KZBWS KZBWS CHAR 1
SMPRF Simulation profile SIM_PROFIL SIM_PROFIL TCN54 CHAR 7
FLGVRG Indicator: Bottom-up calculation with activity dates PS_FLGVRG PS_FLGVRG CHAR 1
GRTOP Indicator: Automatic requirements grouping GRONTOP XFELD CHAR 1
PGPRF Distribution profile PGPROFID PGPROFID TPGPRF CHAR 6
STORT Location PS_STORT AP_STAND T499S CHAR 10
LOGSYSTEM Logical System LOGSYSTEM LOGSYS * CHAR 10
KZERB Indicator: Project summarization via master data charact. PS_KZERB XFELD CHAR 1
PARGR Partner Determination Procedure PARGR PARGR V_TVPG_S CHAR 4
FUNC_AREA Functional Area FKBER FKBER TFKB CHAR 16
VKORG Sales Organization VKORG VKORG TVKO CHAR 4
VTWEG Distribution Channel VTWEG VTWEG TVKOV CHAR 2
SPART Division SPART SPART TVTA CHAR 2
DPPPROF Dynamic Item Processor Profile AD01PROFNR AD01PROFNR AD01C_PROF CHAR 8
VPKSTU Node level SEU_LEVEL SEU_LEVEL NUMC 2
PSPID_EDIT Project Number (External) Edited PS_PSPID_EDIT PS_PSPID_EDIT CHAR 24
VNAME Joint venture JV_NAME JV_NAME T8JV CHAR 6
RECID Recovery Indicator JV_RECIND JV_RECIND T8JJ CHAR 2
ETYPE Equity type JV_ETYPE JV_ETYPE T8JE CHAR 3
OTYPE Joint Venture Object Type JV_OTYPE JV_OTYPE CHAR 4
JIBCL JIB/JIBE Class JV_JIBCL JV_JIBCL T8J6A CHAR 3
JIBSA JIB/JIBE Subclass A JV_JIBSA JV_JIBSA T8J6C CHAR 5
EEW_PROJ_PS_DUMMY Dummy function in length 1 DUMMY DUMMY CHAR 1
SCHTYP Scheduling scenario PS_SCHED_TYPE PS_SCHED_TYPE CHAR 1
SPROG Forecast start date of project definition PS_SPROG DATE DATS 8
EPROG Forecast finish date for project definition PS_EPROG DATE DATS 8
SLWID Key word ID for user-defined fields SLWID SLWID TCN00 CHAR 7
USR00 User field with 20 characters USRCHAR20 USRCHAR20 CHAR 20
USR01 User field with 20 characters USRCHAR20 USRCHAR20 CHAR 20
USR02 User field with 10 characters USRCHAR10 USRCHAR10 CHAR 10
USR03 User field with 10 characters USRCHAR10 USRCHAR10 CHAR 10
USR04 User field for quantity (length 10.3) USRQUAN13 USRQUAN13 QUAN 13
USE04 User field: Unit for quantity fields USRUNIT MEINS * UNIT 3
USR05 User field for quantity (length 10.3) USRQUAN13 USRQUAN13 QUAN 13
USE05 User field: Unit for quantity fields USRUNIT MEINS * UNIT 3
USR06 User-defined field for values (length 10,3) USRCURR13 USRCURR13 CURR 13
USE06 User field: Unit for value fields USRCUKY WAERS TCURC CUKY 5
USR07 User-defined field for values (length 10,3) USRCURR13 USRCURR13 CURR 13
USE07 User field: Unit for value fields USRCUKY WAERS TCURC CUKY 5
USR08 User field for date USRDATE USRDATE DATS 8
USR09 User field for date USRDATE USRDATE DATS 8
USR10 User-defined field: Indicator for reports USRFLAG FLAG CHAR 1
USR11 User-defined field: Indicator for reports USRFLAG FLAG CHAR 1
CPD_UPDAT Time Stamp /CPD/PFP_SC_TSTMP /CPD/PFP_SC_TSTMP DEC 15
FERC_IND Regulatory indicator FE_IND FE_IND FERC_C7 CHAR 4
AVC_PROFILE Budget Availability Control: Profile FCO_AVC_PROFILE FCO_AVC_PROFILE FINSC_AVC_PROF CHAR 6
AVC_ACTIVE Availability control indicator(AVC) PS_S4_AVC_IND XFELD CHAR 1
CPCURR Custom Project Currency PS_S4_WAERS WAERS * CUKY 5
PROJ_STATUS Status Combination ACTCMB_DELE ACTCMB_DOM ACTCMB_TAB INT1 3

Availability

The SAP HANA table PROJ is available within SAP S/4HANA On-premise and SAP S/4HANA Cloud systems depending on the version and release level.

SAP S/4HANA Version Released
1909 Yes
2020 Yes
2021 Yes
2022 Yes
2023 Yes

CDS Views for PROJ table