AUFK is a standard SAP table in SAP ERP (or) S/4HANA which stores Order master data data. There are total 131 fields in AUFK table.This blog post provides key technical details of SAP table AUFK, including its availability across SAP S/4HANA versions and the list of CDS views for AUFK table in SAP.
SAP HANA Table Type | Column Store |
---|---|
Buffering Permission | Buffering not allowed |
Buffering Type | No buffering |
Package | Cost Accounting, Orders (KAUF) |
Technical Component | Overhead Cost Orders (CO-OM-OPA) |
SAP AUFK Table Fields
The following is the list of fields that are available in SAP AUFK table. The key fields of the table are highlighted in color.
Field | Description | Data Element | Domain | Check Table | Data Type |
---|---|---|---|---|---|
MANDT | Client | MANDT | MANDT | T000 | CLNT (3) |
AUFNR | Order Number | AUFNR | AUFNR | CHAR (12) | |
AUART | Order Type | AUFART | AUFART | T003O | CHAR (4) |
AUTYP | Order category | AUFTYP | AUFTYP | NUMC (2) | |
REFNR | Reference Order Number | AUFREFNR | AUFNR | AUFK | CHAR (12) |
ERNAM | Entered By | AUFERFNAM | USNAM | CHAR (12) | |
ERDAT | Created On | AUFERFDAT | DATUM | DATS (8) | |
AENAM | Last Changed By | AUFAENAM | USNAM | CHAR (12) | |
AEDAT | Change Date for Order Master | AUFAEDAT | DATUM | DATS (8) | |
KTEXT | Description | AUFTEXT | TEXT40 | CHAR (40) | |
LTEXT | Long Text Exists | AUFLTEXT | XFELD | CHAR (1) | |
BUKRS | Company Code | BUKRS | BUKRS | T001 | CHAR (4) |
WERKS | Plant | WERKS_D | WERKS | T001W | CHAR (4) |
GSBER | Business Area | GSBER | GSBER | TGSB | CHAR (4) |
KOKRS | Controlling Area | KOKRS | CACCD | TKA01 | CHAR (4) |
CCKEY | Cost Collector Key | CCKEY | CCKEY | CHAR (23) | |
KOSTV | Responsible cost center | AUFKOSTV | KOSTL | CSKS | CHAR (10) |
STORT | Location | AUFSTORT | AP_STAND | T499S | CHAR (10) |
SOWRK | Location Plant | AUFSOWRK | WERKS | T001W | CHAR (4) |
ASTKZ | Identifier for Statistical Order | AUFSTKZ | XFELD | CHAR (1) | |
WAERS | Order Currency | AUFWAERS | WAERS | TCURC | CUKY (5) |
ASTNR | Order Status | AUFASTNR | AUFSTNR | NUMC (2) | |
STDAT | Date of Last Status Change | AUFSTDAT | DATUM | DATS (8) | |
ESTNR | Status Reached so Far | AUFESTNR | AUFSTNR | TKO03 | NUMC (2) |
PHAS0 | Phase “Order Created” | AUFPHAS0 | XFELD | CHAR (1) | |
PHAS1 | Phase “Order Released” | AUFPHAS1 | XFELD | CHAR (1) | |
PHAS2 | Phase “Order Completed” | AUFPHAS2 | XFELD | CHAR (1) | |
PHAS3 | Phase “Order Closed” | AUFPHAS3 | XFELD | CHAR (1) | |
PDAT1 | Planned release date | AUFPDAT1 | DATUM | DATS (8) | |
PDAT2 | Planned completion date | AUFPDAT2 | DATUM | DATS (8) | |
PDAT3 | Planned closing date | AUFPDAT3 | DATUM | DATS (8) | |
IDAT1 | Release Date | AUFIDAT1 | DATUM | DATS (8) | |
IDAT2 | Technical Completion Date | AUFIDAT2 | DATUM | DATS (8) | |
IDAT3 | Close Date | AUFIDAT3 | DATUM | DATS (8) | |
OBJID | Object ID | CCOBJID | CHAR1 | CHAR (1) | |
VOGRP | Group of Disallowed Transactions | AUFSPSET | VOGRP | TKAVG | CHAR (4) |
LOEKZ | Deletion Flag | AUFLOEKZ | XFELD | CHAR (1) | |
PLGKZ | Identifier for Planning with Line Items | PLGKZ | XFELD | CHAR (1) | |
KVEWE | Usage of the condition table | KVEWE | KVEWE | T681V | CHAR (1) |
KAPPL | Application | KAPPL | KAPPL | T681A | CHAR (2) |
KALSM | Costing Sheet | AUFKALSM | KALSM | T683 | CHAR (6) |
ZSCHL | Overhead key | AUFZSCHL | CHAR6 | CHAR (6) | |
ABKRS | Processing group | AUFABKRS | AKREIS | TKO08 | NUMC (2) |
KSTAR | Settlement Cost Element | AUFKSTAR | KSTAR | CSKB | CHAR (10) |
KOSTL | Cost Center for Basic Settlement | AUFKOSTL | KOSTL | CSKS | CHAR (10) |
SAKNR | G/L Account for Basic Settlement | AUFSAKNR | SAKNR | SKB1 | CHAR (10) |
SETNM | Allocation Set | AUFSETNM | SETNR | CHAR (12) | |
CYCLE | Cost center to which costs are actually posted | ST_KOSTL | KOSTL | CSKS | CHAR (10) |
SDATE | Start Date | SDATE | SDATE | DATS (8) | |
SEQNR | Sequence Number | AUFSEQNR | SQNR | NUMC (4) | |
USER0 | Applicant | AUFUSER0 | AUFUSER0 | CHAR (20) | |
USER1 | Applicant’s telephone number | AUFUSER1 | AUFUSER1 | CHAR (20) | |
USER2 | Person Responsible | AUFUSER2 | AUFUSER2 | CHAR (20) | |
USER3 | Telephone number of person in charge | AUFUSER3 | AUFUSER3 | CHAR (20) | |
USER4 | Estimated total costs of order | AUFUSER4 | AUFUSER4 | CURR (11) | |
USER5 | Application date | AUFUSER5 | AUFUSER5 | DATS (8) | |
USER6 | Department | AUFUSER6 | AUFUSER6 | CHAR (15) | |
USER7 | Work Start | AUFUSER7 | AUFUSER7 | DATS (8) | |
USER8 | End of Work | AUFUSER8 | AUFUSER8 | DATS (8) | |
USER9 | Identifier for work permit issued | AUFUSER9 | AUFUSER9 | CHAR (1) | |
OBJNR | Object number | J_OBJNR | J_OBJNR | ONR00 | CHAR (22) |
PRCTR | Profit Center | PRCTR | PRCTR | CEPC | CHAR (10) |
PSPEL | Work breakdown structure element (WBS element) | PS_PSP_ELE | PS_POSNR | PRPS | NUMC (8) |
AWSLS | Variance Key | AWSLS | AWSLS | TKV01 | CHAR (6) |
ABGSL | Results Analysis Key | ABGR_SCHL | ABGR_SCHL | TKKAA | CHAR (6) |
EB_POST | Event-Based Posting | FCO_EB_POST | KKA_YES_NO | CHAR (1) | |
TXJCD | Tax Jurisdiction | TXJCD | TXJCD | TTXJ | CHAR (15) |
FUNC_AREA | Functional Area | FKBER | FKBER | TFKB | CHAR (16) |
SCOPE | Object Class | SCOPE_CV | SCOPE_CV | CHAR (2) | |
PLINT | Indicator for Integrated Planning | PLINT | XFELD | CHAR (1) | |
KDAUF | Sales Order Number | KDAUF | VBELN | CHAR (10) | |
KDPOS | Item number in Sales Order | KDPOS | NUM06 | NUMC (6) | |
AUFEX | External order number | AUFEX | AUFEX | CHAR (20) | |
IVPRO | Investment Measure Profile | IM_PROFIL | IM_PROFIL | TAPRF | CHAR (6) |
LOGSYSTEM | Logical System | LOGSYSTEM | LOGSYS | TBDLS | CHAR (10) |
FLG_MLTPS | Order Has Multiple Items | CO_MLTPS | KREUZ | CHAR (1) | |
ABUKR | Requesting company code | IM_ABUKRS | BUKRS | T001 | CHAR (4) |
AKSTL | Requesting cost center | PS_AKSTL | KOSTL | CSKS | CHAR (10) |
SIZECL | Scale of investment objects | IM_SIZECL | SIZECL | TAIF5 | CHAR (2) |
IZWEK | Reason for Investment | IZWEK | IZWEK | T087I | CHAR (2) |
UMWKZ | Reason for Environmental Investment | AM_UMWKZ | AM_UMWKZ | T087K | CHAR (5) |
KSTEMPF | Indicator: Direct cost collector | CO_KSTEMPF | CO_KSTEMPF | CHAR (1) | |
ZSCHM | Interest Profile for Project/Order Interest Calculation | PS_ZSCHM | PS_ZSCHM | TPI01 | CHAR (7) |
PKOSA | Cost Collector for Production Process | PKOSA_D | AUFNR | CHAR (12) | |
ANFAUFNR | Requesting order | AUFANFNR | AUFNR | AUFK | CHAR (12) |
PROCNR | Production Process | CKML_F_PROCNR | CK_KALNR | NUMC (12) | |
PROTY | Process Category (Procurement/Consumption) | CKML_PROZESS_TYP | CKML_PROZESS_TYP | CHAR (4) | |
RSORD | Refurbishment order indicator (PM) | RSORD | XFELD | CHAR (1) | |
BEMOT | Accounting Indicator | BEMOT | BEMOT | TBMOT | CHAR (2) |
ADRNRA | Address Number | AD_ADDRNUM | AD_ADDRNUM | CHAR (10) | |
ERFZEIT | Time created | CO_INS_TIME | UZEIT | TIMS (6) | |
AEZEIT | Changed At | CO_CHG_TIME | UZEIT | TIMS (6) | |
CSTG_VRNT | Costing Variant | CK_KLVAR | KLVAR | CHAR (4) | |
COSTESTNR | Cost Estimate Number for Cost Est. w/o Qty Structure | CK_KALNR | CK_KALNR | NUMC (12) | |
VERAA_USER | Person Responsible for CO Internal Order | VERAA_USER | XUBNAME | USR02 | CHAR (12) |
EEW_AUFK_PS_DUMMY | Dummy function in length 1 | DUMMY | DUMMY | CHAR (1) | |
VNAME | Joint venture | JV_NAME | JV_NAME | T8JV | CHAR (6) |
RECID | Recovery Indicator | JV_RECIND | JV_RECIND | T8JJ | CHAR (2) |
ETYPE | Equity type | JV_ETYPE | JV_ETYPE | T8JG | CHAR (3) |
OTYPE | Joint Venture Object Type | JV_OTYPE | JV_OTYPE | CHAR (4) | |
JV_JIBCL | JIB/JIBE Class | JV_JIBCL | JV_JIBCL | T8J6A | CHAR (3) |
JV_JIBSA | JIB/JIBE Subclass A | JV_JIBSA | JV_JIBSA | T8J6C | CHAR (5) |
JV_OCO | JV original cost object | JV_OR_CO | JV_OR_COB | CHAR (1) | |
CPD_UPDAT | Time Stamp | /CPD/PFP_SC_TSTMP | /CPD/PFP_SC_TSTMP | DEC (15) | |
/CUM/INDCU | CU: Order is Used for Compatible Units | /CUM/INDCU | FLAG | CHAR (1) | |
/CUM/CMNUM | CU: Construction Measure Number | /CUM/CMNUM | /CUM/CMNUM | CHAR (12) | |
/CUM/AUEST | CU: Automatic Copy of Estimated Costs | /CUM/AUEST | FLAG | CHAR (1) | |
/CUM/DESNUM | CU: Design Number | /CUM/DESNUM | /CUM/DESNUM | * | CHAR (12) |
AD01PROFNR | Dynamic Item Processor Profile | AD01PROFNR | AD01PROFNR | AD01C_PROF | CHAR (8) |
VAPLZ | Main work center for maintenance tasks | GEWRK | ARBPL | CHAR (8) | |
WAWRK | Plant associated with main work center | WERGW | WERKS | * | CHAR (4) |
FERC_IND | Regulatory indicator | FE_IND | FE_IND | FERC_C7 | CHAR (4) |
AUFK_STATUS | Status Combination | ACTCMB_DELE | ACTCMB_DOM | ACTCMB_TAB | INT1 (3) |
CLAIM_CONTROL | Claim creation control indicator | WTYSC_CLAIM_CONTROL | WTYSC_CLAIM_CONTROL | WTYSCC_CLM_CONT | CHAR (1) |
UPDATE_NEEDED | Claim inconsistency with order indicator | WTYSC_UPDATE_NEEDED | WTYSC_UPDATE_NEEDED | CHAR (1) | |
UPDATE_CONTROL | Claim update trigger point from service order | WTYSC_UPDATE_CONTROL | WTYSC_UPDATE_CONTROL | WTYSCC_UPDT_CONT | CHAR (1) |
CUSTOMERFLD1 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD2 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD3 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD4 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD5 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD6 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD7 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD8 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD9 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD10 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD11 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD12 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD13 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD14 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) | |
CUSTOMERFLD15 | Character Field with Length 10 | CHAR10 | CHAR10 | CHAR (10) |
Availability
The SAP table AUFK is available within SAP S/4HANA On-premise and SAP S/4HANA Cloud systems depending on the version and release level.
SAP S/4HANA Version | Available? |
---|---|
1909 | Yes |
2020 | Yes |
2021 | Yes |
2022 | Yes |
2023 | Yes |
CDS Views for AUFK table
The following is the list of AUFK CDS views, which can also be used instead of AUFK table based on your business requirements.
CDS View | CDS View Type | Description |
---|---|---|
A_CNSLDTNINTERNALORDER | BASIC | Combined Internal Order |
A_CNSLDTNINTERNALORDERT | BASIC | Combined Internal Order Text |
A_INTERNALORDER | BASIC | API Internal Order |
I_ACTUALPLANJOURNALENTRYITEM | BASIC | Actual Plan for Journal Entry Item |
I_BR_ORDERTEXT | BASIC | Order Text |
I_CNSLDTNINTERNALORDER | BASIC | Consolidation – Combined Internal Order |
I_CNSLDTNINTERNALORDERENHCD | BASIC | Consolidation Combined Internal Order |
I_CNSLDTNINTERNALORDERT | BASIC | Consolidation – Combined Internal Order Text |
I_CNSLDTNINTERNALORDTEXTENHCD | BASIC | Consolidation Combined Order Text |
I_EVENTBASEDWIPLOGHEADER | BASIC | Event-Based WIP Order Application Log Header |
I_FLDLOGSMAINTENANCEORDER | BASIC | Get Field Logistics Maintenance Orders |
I_FLDLOGSWORKORDERVH | BASIC | Work Order Value Help Non Teco Orders |
I_INTERNALORDER | BASIC | Internal Order |
I_INTERNALORDERSYSTEMSTATUS | BASIC | Internal Order System Status |
I_JOINTVENTUREORDERDATA | BASIC | Joint Venture Order Data |
I_LOGISTICSORDER | BASIC | Logistics Order |
I_MAINTENANCEORDER | BASIC | Maintenance Order |
I_MAINTENANCEORDERCOMPONENT | BASIC | Maintenance Order Component |
I_MAINTENANCEORDEROPERATION | BASIC | Maintenance Order Operation |
I_MAINTORDERQUERYNODE | BASIC | Cloud Printing – Query Node Maintenance Order |
I_MANUFACTURINGORDER | BASIC | Manufacturing Order |
I_MATLDOCLOGISTICSORDITMVH | BASIC | Invtry Management Logistics Order Items |
I_MFGORDER | BASIC | Manufacturing Order |
I_MFGORDERBASIC | BASIC | Manufacturing Order Basic |
I_MFGORDERCONFIRMATION | BASIC | Manufacturing Order Confirmation |
I_MFGORDERHEADERCONFIRMATION | BASIC | Manufacturing Order Header Confirmation |
I_MFGORDERMFGEXECDISTRINFO | BASIC | Distribution Information on Production Order |
I_MFGORDEROPERATIONBASIC | BASIC | Manufacturing Order Operation Basic |
I_MFGORDEROPERATIONBYSEMANKEY | BASIC | Manufacturing Order Operation By Semantic Key |
I_MFGORDEROPERATIONCOMPONENT | BASIC | Manufacturing Order Operation Component |
I_MFGORDEROPERATIONCONF | BASIC | Manufacturing Order Operation Confirmation |
I_MFGORDERSEQUENCEBASIC | BASIC | Manufacturing Order Sequence Basic View |
I_MM_LOGISTICSORDERVH | BASIC | MM Purchasing Logistics Order Value Help |
I_NETWORKACTIVITY | BASIC | Network Activity Details |
I_NETWORKACTIVITYBYINTERNALKEY | BASIC | Network Activity Information By Internal Key |
I_OPERATIONACTIVITYPLNDMATLRET | BASIC | Operation Activity Planned Material Return |
I_ORDER | BASIC | Order Header |
I_ORDERCOMPONENT | BASIC | Order Component |
I_ORDERCONFIRMATION | BASIC | Order Confirmation |
I_ORDERMASTERDATAWITHCRCY | BASIC | Order Master Data |
I_ORDERPRODNRESOURCETOOL | BASIC | Order Production Resource Tool |
I_ORDERSEQUENCE | BASIC | Order Sequence |
I_ORDERSEQUENCEBYSEMKEY | BASIC | Order Sequence by Semantic Key |
I_ORDMSTRDATA | BASIC | Order Master Data |
I_PROCESSORDEROPERATION | BASIC | Interface View for Process Order Operation |
I_PROCORDMGMTOPBASIC | BASIC | Process order operation afvg |
I_PRODUCTCOSTCTRLGORDER | BASIC | Product Cost Controlling Order |
I_PRODUCTIONORDEROPERATION | BASIC | Interface View for Production Order Operation |
I_PROJECTMATERIALCOMPONENT | BASIC | Project Material Component Details |
I_PROJECTNETWORK | BASIC | Project Network Details |
I_PROJECTNETWORKBASICDATA | BASIC | Project Network Basic Data |
I_PROJMATCOMPONENTVERSION | BASIC | Project Material Component Version |
I_REALTIMEMFGORDERLOG | BASIC | Analyze Event-Based WIP and Variance Exceptions Log |
I_REALTMEWRKINPROCCHGDBYUSER | BASIC | Real-Time WIP Distinct Changed By of WIP relevant PP orders |
I_REALTMEWRKINPROCCRTEDBYUSER | BASIC | Real-Time WIP Distinct Created By of WIP relevant PP orders |
I_SRVCDOCFUPINTERNALORDER | BASIC | Follow-Up Internal Order of Srvc Transac |
I_SUPDMNDALLDOCPRODNORDBSC | BASIC | Basic View for Production Order |
I_TRIPORDERNUMBERVH | BASIC | Order Number Value Help |
P_ACTUALPLANJRNLENTRYITM | BASIC | P_ActualPlanJrnlEntryITm |
P_CNSLDTNINTERNALORDER | BASIC | Consolidation Combined Internal Order |
P_CNSLDTNINTERNALORDERT | BASIC | Consolidation Combined Order Text |
P_CNSLDTNORDER | BASIC | Consolidation Combined Order |
P_CNSLDTNORDERT | BASIC | Consolidation Combined Order Text |
P_EBWOBJECTMAXSTATUS | BASIC | CO PCC Object Max Status |
P_EVENTBASEDORDER | BASIC | Event-based Order |
P_MAINTORDERDURATION | BASIC | used for AMDP method (Table function) for durations |
P_MAINTORDERSEARCH | BASIC | Maintenance Order anchor view for CDS search model |
P_MFGORDER | BASIC | Manufacturing Order Header |
P_MFGORDEREWMSYNCHRONOUSPOSTG | BASIC | Mfg Order EWM Synchronous Posting |
P_MFGORDEROPERATION | BASIC | Manufacturing Order Operation |
P_MFGORDEROPRESERVATIONITEM | BASIC | Manufacturing Order Operation Reservation Item |
P_ONROR | BASIC | View for ONROR |
P_PROCORDMGMTOPBASIC | BASIC | Process order operation basic (afvc) |
P_PROJMATCOMPVERSION | BASIC | View to fetch Purchase Requisition & Purchase Order version |
P_PROJMATCOMPVERSION01 | BASIC | View to fetch PR and PO version uniquely |
P_RA_FOLD_LINE_ITEM_POST_RULES | BASIC | Fold “posting rules applied to RA line items” |
P_RA_LINE_ITEMS_POSTING_RULES | BASIC | Apply posting rules to line items |
P_RA_OBJECTS | BASIC | Objects of results analysis |
P_RA_SUM_FOLD_LINEITM_POSTRULE | BASIC | Sum folded “posting rules applies to RA line items” |
P_SCHEDPRODNOPERRELN | BASIC | Relations between phases and operations |
R_ORDERCONTROLLINGOBJECT | BASIC | Controlling Object for Order |
A_EXCISETAXMATLDOCITEM | COMPOSITE | MatlDocItem for Industry Extensions |
A_PROCESSORDER | COMPOSITE | API Process Order |
A_PROCESSORDERCOMPONENT | COMPOSITE | API for Process Order Components |
A_PROCESSORDERCOMPONENT_2 | COMPOSITE | Process Order Components |
A_PROCESSORDEROPERATION | COMPOSITE | API for Process Order Operations |
A_PROCESSORDEROPERATION_2 | COMPOSITE | Process Order Operations |
A_PROCESSORDERPRODNRSCETOOLS_2 | COMPOSITE | Process Order Production Resources Tools |
A_PROCESSORDERSTATUS | COMPOSITE | API Process Order Status |
A_PROCESSORDERSTATUS_2 | COMPOSITE | Process Order Status |
A_PROCESSORDER_2 | COMPOSITE | Process Order |
A_PROCORDCONFIRMATION | COMPOSITE | API Process Order Confirmations |
A_PROCORDCONFIRMATION_2 | COMPOSITE | Process Order Confirmation |
A_PROCORDCONFMATLDOCITEM | COMPOSITE | Material Movements for Confirmation |
A_PRODNORDCONFMATLDOCITEM | COMPOSITE | Material Movements for Confirmation |
A_PRODUCTIONORDER | COMPOSITE | API Production Order |
A_PRODUCTIONORDERCOMPONENT | COMPOSITE | API Production Order Components |
A_PRODUCTIONORDERCOMPONENT_2 | COMPOSITE | Production Order Components |
A_PRODUCTIONORDERCONF | COMPOSITE | API Production Order Confirmation |
A_PRODUCTIONORDERCONF_2 | COMPOSITE | Production Order Confirmation |
A_PRODUCTIONORDEROPERATION | COMPOSITE | API Production Order Operations |
A_PRODUCTIONORDEROPERATION_2 | COMPOSITE | Production Order Operations |
A_PRODUCTIONORDERSTATUS | COMPOSITE | API Production Order Status |
A_PRODUCTIONORDERSTATUS_2 | COMPOSITE | Production Order Status |
A_PRODUCTIONORDER_2 | COMPOSITE | Production Order |
A_PRODUCTIONRSCETOOLS | COMPOSITE | API Production Resource/Tools |
A_PRODUCTIONRSCETOOLS_2 | COMPOSITE | Production Resources Tools |
A_SCHAGRMTACCNT | COMPOSITE | Account Assignment |
A_WORKCENTERCAPDAYOP | COMPOSITE | Daily Operations Capacity |
A_WORKCENTERCAPORDERPERBUCKET | COMPOSITE | Operation Load Distribution |
A_WORKCENTERCAPPERBUCKET | COMPOSITE | Capacity Evaluation |
A_WORKCENTERCAPPPLINEOP | COMPOSITE | Queued Operations Capacity |
A_WORKCENTERDAYOPERATION | COMPOSITE | Daily Operations |
A_WORKCENTERPIPELINEOPERATION | COMPOSITE | Queued Operations |
I_ACTUALPLANJRNLENTRYITEMCUBE | COMPOSITE | Actual Plan of Journal Entry Item – Cube |
I_ALERTOUTSTANDINGCUSTPAYMT | COMPOSITE | Outstanding Customer Payment |
I_ALERTOVERDUECUSTOMERPAYMENT | COMPOSITE | Overdue Customer Payment |
I_ALERTOVERDUEVENDORINVOICE | COMPOSITE | Overdue Vendor Invoice |
I_ALERTOVERDUEVENDORPAYMENT | COMPOSITE | Overdue Vendor Payment |
I_ALERTOVERGOODRCPT | COMPOSITE | Overdue Goods receipt: Alert |
I_ALERTREJECTEDSERVICESHEET | COMPOSITE | Rejected Service Sheet |
I_ARUNANLYTSSUPDMNDOVWCUBE | COMPOSITE | Overview of Supply and Demand |
I_ARUNANLYTSTOTSUPCUBE | COMPOSITE | Total Supply of all Document Types |
I_BR_NFITEMCOSTINFORMATION_C | COMPOSITE | Costing Nota Fiscal Line Information |
I_BR_NFITEM_C | COMPOSITE | Nota fiscal item data |
I_CACHEMRPMFGORDER | COMPOSITE | Cache MRP Manufacturing Orders |
I_CALDUECUSTPYMT | COMPOSITE | Calculate Duedays for Customer Payment |
I_CHANGERECORDMFGORDER | COMPOSITE | Change Record Production Order |
I_CHFIEXPRODNORDCONFIGN | COMPOSITE | Production Order Config |
I_CHGIMPACTMBOMPRODNORD | COMPOSITE | Mfg BOMs Linked with Prodn order |
I_CHGIMPACTORDERDETS | COMPOSITE | Production Order Details |
I_CHGIMPACTORDERSTATUS | COMPOSITE | Change Impact Order Status |
I_CHGIMPACTORDSPCFCRTG | COMPOSITE | Order Specific Routings for POs |
I_CHGIMPACTROUTINGPRODNORD | COMPOSITE | Production Orders for Routings |
I_CNSLDTNMASTERDATA | COMPOSITE | Consolidation – Combined Master Data |
I_CONTROLLINGOBJECTENHANCED | COMPOSITE | Controlling Object |
I_COPCCORDERANDITEMCOSTSCUBE | COMPOSITE | CO PCC Order and Item Costs Cube |
I_COPRODUCTCOSTBYORDER | COMPOSITE | CO Product Cost By Order |
I_COPRODUCTCOSTBYORDERANDITEM | COMPOSITE | CO Product Cost By Order and Item |
I_COSTCENTERBUDGET | COMPOSITE | Cost Center Budget Report |
I_DEPDNTRESVNQUICKVIEW | COMPOSITE | Dependent Requirement and Order Reservation Details |
I_DFS_MAINTENANCEORDERTECHSTS | COMPOSITE | Interface view for Tech Status of Order |
I_DFS_MAINTEQUIPMENTDATA | COMPOSITE | Equipment Data |
I_DFS_MAINTEQUIPNOTIFORDERDATA | COMPOSITE | Equipment data |
I_DFS_MAINTFLGHTFUNCNLLOCSTRUC | COMPOSITE | Flight Functional Location Data |
I_DFS_MAINTFLGHTORDSTRUCTURE | COMPOSITE | Equipment Structure Flight Order Data |
I_DFS_MAINTFUNCNLLOCDATA | COMPOSITE | Functional Location Data |
I_DFS_MAINTNOTIFFUNCNLLOCSTRUC | COMPOSITE | Notification Functional Location Data |
I_DFS_MAINTNOTIFICATIONDATA | COMPOSITE | Interface view for Notification Data |
I_DFS_MAINTNOTIFICATIONSTRUC | COMPOSITE | Interface view for Notification Struc |
I_DFS_MAINTORDANDOPTECHSTS | COMPOSITE | Interface view for TStat of Ord and Op |
I_DFS_MAINTORDERDATA | COMPOSITE | Interface view for order data |
I_DFS_MAINTORDERFUNCNLLOCSTRUC | COMPOSITE | Order Functional Location data |
I_DFS_MAINTORDERSTRUCTURE | COMPOSITE | Interface view for Order Struc |
I_DFS_MAINTSTSBRDFLGHTORDDATA | COMPOSITE | Interface View of Flight Order |
I_DSPDOCFLWANCHORDOCVH | COMPOSITE | Anchor Document VH for DDF |
I_EARMARKEDFUNDSITEM | COMPOSITE | DEPRECATED -> use I_EarmarkedFundsDocumentItem |
I_EARNEDVALUEDATA | COMPOSITE | Requirement Earned Value Calculations |
I_ENTERPRISEPROJECTRANKINGCOST | COMPOSITE | Costs of projects assigned to Ranking |
I_EVENTBASEDORDERKPI | COMPOSITE | Event-based Order KPI |
I_EXCISETAXMATLDOCITEM | COMPOSITE | MatlDocItem for Industry Extensions |
I_FLXMTPLOBJVARIANTNTWKACTYVH | COMPOSITE | Value help for Network Activities |
I_HIERCOSTERP | COMPOSITE | Hierarchical Cost status: ERP scenario |
I_HIERCOSTSTATUSACTUAL | COMPOSITE | Fetch Actuals for Hierarchical Cost stauts report |
I_INTERNALORDERSTDVH | COMPOSITE | Internal Order |
I_INTERNALORDERVH | COMPOSITE | Internal Order Value Help |
I_JITMATLRCPNTDOCUMENTS | COMPOSITE | Just-In-Time Material Combined Recipient Documents |
I_JVAACTLBDGTFOROPLEXPENSESOVW | COMPOSITE | Actual Cost & JV Budget for Opex Expense |
I_JVAACTUALBUDGETLINEITEM | COMPOSITE | Actual Cost and JV Budget |
I_JVAACTUALBUDGETOVERVIEW | COMPOSITE | Actual Cost and JV Budget Overview |
I_JVAACTUALCAPITALEXPNDTROVW | COMPOSITE | Actual Cost & Capital Expenditure Ovw |
I_KPIEARNEDVALUE | COMPOSITE | KPI: Earned Value |
I_LOGISTICSORDERSTDVH | COMPOSITE | Logistics Order |
I_MAINTENANCEJOBANDWORKITEM | COMPOSITE | Maintenance Job and Work Items |
I_MAINTENANCEJOBOVERALLSTATUS | COMPOSITE | Overall Status of Maintenance Job |
I_MAINTENANCEORDERSTDVH | COMPOSITE | Maintenance Order |
I_MAINTJOBANDWORKITEMFORUSER | COMPOSITE | Current Users Maintenance Jobs and Work Items |
I_MAINTNOTIFASSIGNORDERINPUT | COMPOSITE | Maint Notification Assign Order Input |
I_MAINTNOTIFFORSCREENINGC | COMPOSITE | Maintenance Notifications for Screening |
I_MAINTOBJBREAKDOWNCUBE | COMPOSITE | Maintenance Object Breakdown Cube |
I_MAINTORDACTLPLNDCOSTCUBE | COMPOSITE | Maint. Order Actual Planned Cost Cube |
I_MAINTORDCOMPPURORDERC | COMPOSITE | Purchase Orders for Maintenance Orders |
I_MAINTORDCOMPPURREQUISITIONC | COMPOSITE | Purchase Requisitions for Maintenance Order Components |
I_MAINTORDERACTUALCOSTCUBE | COMPOSITE | Maintenance Order Actual Cost Cube |
I_MAINTORDERACTUALCOSTDATACUBE | COMPOSITE | Maintenance Order Actual Cost Data |
I_MAINTORDERHASOPENMAINWORK | COMPOSITE | I_MaintOrderHasOpenMainWork |
I_MAINTORDEROPERATIONDATA | COMPOSITE | Maintenance Order Operation Data |
I_MAINTORDEROPERATION_DEX | COMPOSITE | Maintenance Order Operation Data |
I_MAINTORDEROPERCOMP | COMPOSITE | Maintenance Order Operation Component |
I_MAINTORDEROPERTECHOBJ | COMPOSITE | MaintOrder Operation w/ Technical Object |
I_MAINTORDERSFORPLANNINGC | COMPOSITE | Maintenance Orders for Planning |
I_MAINTORDERSUBOPERTECHOBJ | COMPOSITE | MaintOrder Sub-Operation w/ Tech. Object |
I_MAINTORDERTECHOBJ | COMPOSITE | Maintenance Order w/ Technical Object |
I_MAINTORDERTECHOBJCUBE | COMPOSITE | Maintenance Order Cube w/ Tech. Object |
I_MAINTORDOPSTDVH | COMPOSITE | Maintenance Order Operation |
I_MAINTWORKITEMINTERRUPTION | COMPOSITE | Maintenance Work Item Interruption |
I_MANUFACTURINGORDEROPERATION | COMPOSITE | Manufacturing Order Operation |
I_MASTERPROJECTACTUALSKPI | COMPOSITE | Get Actuals KPI for master project |
I_MASTERPROJECTACTUALTILLMONTH | COMPOSITE | Get actuals till month |
I_MAXDUECUSTPAY | COMPOSITE | Maximum Overdue Customer Payment |
I_MFGCONTROLLINGOBJECTSTATUS | COMPOSITE | Manufacturing Controlling Object Status |
I_MFGEXECEVENTHISTORY | COMPOSITE | Manufacturing Execution Event History |
I_MFGORDASSLDDGTLMOCKUPINSTCE | COMPOSITE | Digital Mock Up Instance assembled into an Order |
I_MFGORDERACTLPLANTGTCOST | COMPOSITE | Manufacturing Order Plan Actual – Cube |
I_MFGORDERCONFMATLDOCITEM | COMPOSITE | Material Document Items of Mfg Order Confirmation |
I_MFGORDERCONFOBJPGQTSUM | COMPOSITE | Manufacturing order confirmation Quantity Sum |
I_MFGORDERCUBE | COMPOSITE | Manufacturing Order Header Cube |
I_MFGORDERDATALIST | COMPOSITE | Mfg Order Header (Data List) |
I_MFGORDERDEFECTFORSITUATIONS | COMPOSITE | Defect list to trigger situation |
I_MFGORDERDOCINFORECDOBJLINK | COMPOSITE | Mfg Order Document Info Record Object Link |
I_MFGORDERDOCINFORECDORIGL | COMPOSITE | Mfg Order Header Document Info Record Original |
I_MFGORDERDOCUMENTDATALIST | COMPOSITE | Mfg Order Document (Data List) |
I_MFGORDERDURATION | COMPOSITE | Manufacturing Order Duration |
I_MFGORDERITEMDURATION | COMPOSITE | Manufacturing Order Item with Durations |
I_MFGORDERMATERIALDOCUMENTITEM | COMPOSITE | Manufacturing Order Material Document Item |
I_MFGORDEROBJPGCONFALL | COMPOSITE | Manufacturing order confirmations |
I_MFGORDEROBJPGOPCONFQTY | COMPOSITE | Today Operation Confirmed Quantity |
I_MFGORDEROBJPGSTATUS | COMPOSITE | Manufacturing Order Operations Status |
I_MFGORDEROPACTYINSPCHARCS | COMPOSITE | Interface view for Insp. Char. for Oper. Acty. in MfgOrder |
I_MFGORDEROPCOMPONENTDATALIST | COMPOSITE | Mfg Order Component (Data List) |
I_MFGORDEROPCOMPONENTPICKLIST | COMPOSITE | Mfg Order Component (Pick List) |
I_MFGORDEROPDOCINFORECDOBJLINK | COMPOSITE | Mfg Order Operation Document Info Record Object Link |
I_MFGORDEROPERATION | COMPOSITE | Manufacturing Order Operation |
I_MFGORDEROPERATIONBASICSTDVH | COMPOSITE | Manufacturing Order Operation Basic |
I_MFGORDEROPERATIONCOMPCUBE | COMPOSITE | Manufacturing Order Operation Component Cube |
I_MFGORDEROPERATIONCOMPWITHSTS | COMPOSITE | Manufacturing Order Operation Component With Status |
I_MFGORDEROPERATIONCONFCUBE | COMPOSITE | Manufacturing Order Operation Confirmation Cube |
I_MFGORDEROPERATIONCONFOPER | COMPOSITE | Mfg Order Operation Confirmation with Operation Details |
I_MFGORDEROPERATIONCUBE | COMPOSITE | Manufacturing Order Operation Cube |
I_MFGORDEROPERATIONDATALIST | COMPOSITE | Mfg Order Sub-/Operation (Data List) |
I_MFGORDEROPERATIONDELAY | COMPOSITE | Manufacturing Order Operation Delay Information |
I_MFGORDEROPERATIONDELAYBASIC | COMPOSITE | Manufacturing Order Operation Delay Basic Data |
I_MFGORDEROPERATIONDURN | COMPOSITE | Manufacturing Order Operation Duration |
I_MFGORDEROPERATIONDURNCUBE | COMPOSITE | Manufacturing Order Operation Duration Cube |
I_MFGORDEROPERATIONFORCONF | COMPOSITE | Mfg Order Operation for Confirmation |
I_MFGORDEROPERATIONPICKLIST | COMPOSITE | Mfg Order Operation (Pick List) |
I_MFGORDEROPERATIONPRT | COMPOSITE | Mfg Order Operation Production Resource Tool |
I_MFGORDEROPERATIONSTATUS | COMPOSITE | Manufacturing Order Operation Status |
I_MFGORDEROPERATIONSTDVH | COMPOSITE | Manufacturing Order Operation |
I_MFGORDEROPERATIONTRGGRPOINT | COMPOSITE | Mfg Order Operation Trigger Point |
I_MFGORDEROPERATIONWITHSTATUS | COMPOSITE | Manufacturing Order Operation With Status |
I_MFGORDEROPPRTDATALIST | COMPOSITE | MfgOrder ProductionResourceTool DataList |
I_MFGORDEROUTPUTCONTROL | COMPOSITE | Output Control of Manufacturing Order |
I_MFGORDERPICKLIST | COMPOSITE | Mfg Order Header (Pick List) |
I_MFGORDERSEQUENCE | COMPOSITE | Manufacturing Order Sequence |
I_MFGORDERSEQUENCEDATALIST | COMPOSITE | ManufacturingOrderSequence Data List |
I_MFGORDERSEQUENCESTDVH | COMPOSITE | Manufacturing Order Sequence |
I_MFGORDERSFILEADTIMECUBE | COMPOSITE | Mfg Order SFI Lead Time Cube |
I_MFGORDERSTATUS | COMPOSITE | Manufacturing Order Header Status |
I_MFGORDERSTDVH | COMPOSITE | Manufacturing Order |
I_MFGORDERSUBOPBYSEMKEYSTDVH | COMPOSITE | Manufacturing Order SubOperation By Semantic Key |
I_MFGORDERSUBOPERATIONBYSEMKEY | COMPOSITE | Manufacturing Order SubOperation By Semantic Key |
I_MFGORDERVH | COMPOSITE | Manufacturing Order Value Help |
I_MFGORDERWIPVARIANCE | COMPOSITE | WIP and Variance of Manufacturing Order |
I_MFGORDERWITHSTATUS | COMPOSITE | Manufacturing Order Header with Status |
I_MFGORDERWORKCENTER | COMPOSITE | WorkCenters for Manufacturing Orders |
I_MFGORDERWRKCNTROPER | COMPOSITE | Workcenter Manufactoring Order Operations |
I_MFGORDOPBYSEMANTICKEYSTDVH | COMPOSITE | Manufacturing Order Operation By Semantic Key |
I_MFGORDOPDATESBYSEMKEYSTDVH | COMPOSITE | Manufacturing Order Operation Dates By Semantic Key |
I_MFGORDOPDOCINFORECDORIGL | COMPOSITE | Mfg Order Operation Document Info Record Original |
I_MFGPROCGEXECORDERMAINSTATUS | COMPOSITE | Order Main Status in Manufacturing Processing Execution |
I_MILESTONEWITHVERSION | COMPOSITE | Project Milestone with Version |
I_MM_INTERNALORDERVH | COMPOSITE | Purchasing Internal Order Value Help |
I_MM_NETWORKACTIVITYVH | COMPOSITE | Purchasing Network Activity Value Help |
I_MM_PROJECTNETWORKVH | COMPOSITE | Purchasing Project Network Value Help |
I_MNTRWRKCTRORDEROPERATIONS | COMPOSITE | Monitor Work Centers – Order Operations |
I_MPFILTERPROCUREMENT | COMPOSITE | Master Project Filter Fields for Procurement |
I_MPMAXODUEGR | COMPOSITE | Maximum Overdue GoodsReceipt |
I_MPMAXODUESS | COMPOSITE | Maximum days for Unapproved Sheet |
I_MPMAXODUEVI | COMPOSITE | maximum Overdue Vendor Invoice |
I_MPMAXODUEVP | COMPOSITE | Overdue Vendor Payment |
I_MPNETWORK | COMPOSITE | Get Master Project Network |
I_MPNETWORKACTIVITY | COMPOSITE | Get Master Project Network Activity |
I_MPPRCHSORDRVH | COMPOSITE | Master Project Purchase Order Value Help |
I_MPPRCHSRQSTNVH | COMPOSITE | Master Project Purchase Requisition Value Help |
I_MPPRMATERIALVH | COMPOSITE | Master Project Procurement Material Value Help |
I_MPPROCUREMENT | COMPOSITE | Procurement Data |
I_MPPROCUREMENTCUBE | COMPOSITE | Procurement Cube |
I_MPPROCUREMENTSTRELMVH | COMPOSITE | Master Project Structure Element for Procurement |
I_MPPROCUREMENTSTRUCTURE | COMPOSITE | View to get Master Project with Structure Elements |
I_MPPRRELEASECODEVH | COMPOSITE | Master Project Procurement Release Code Value Help |
I_MPPRSUPPLIERVH | COMPOSITE | Master Project Procurement Supplier Value Help |
I_MRPMANUFACTURINGCOMPONENT | COMPOSITE | MRP Manufacturing Components |
I_MRPMFGORDER | COMPOSITE | MRP Manufacturing Order |
I_MRPORDERCOMPONENT | COMPOSITE | Mfg Component and Maint Component |
I_MSTRPROJACTIVITYDETAIL | COMPOSITE | Master Project Activity Detail |
I_MSTRPROJACTLCALMNTHCOSTQTY | COMPOSITE | Commercial Proj Actual Cost Qty by Month |
I_MSTRPROJACTLCOSTQTY | COMPOSITE | Commercial Project Actual Input Cost Qty |
I_MSTRPROJACTLSTATISTICKEYFIG | COMPOSITE | Commercial Project Output SKF Actuals |
I_MSTRPROJACTUALS | COMPOSITE | view for planned cost integration |
I_MSTRPROJACTYREFVH | COMPOSITE | Master Project Activity Reference Value Help |
I_MSTRPROJACTYVH | COMPOSITE | Master Project Activity Value Help |
I_MSTRPROJCHKLSTACTY | COMPOSITE | Master Project Checklist Activity |
I_MSTRPROJCOSTQTY | COMPOSITE | Commercial Project Actual Cost and Qty |
I_MSTRPROJCOSTQTYWTHTOTCOST | COMPOSITE | Commercial Project Actual Cost Status |
I_MSTRPROJDEBT | COMPOSITE | Master Project Debt |
I_MSTRPROJHIERARCHY | COMPOSITE | Master Project Hierarchy List |
I_MSTRPROJHIERLIST | COMPOSITE | Master Project Hierarchy List |
I_MSTRPROJISSCHGACTY | COMPOSITE | Master Project Issue Change Activity |
I_MSTRPROJITMPROJSTRUCNODE | COMPOSITE | Project Structure Node Master Project |
I_MSTRPROJKPIERP | COMPOSITE | KPI for ERP scenario |
I_MSTRPROJMYACTIVITIES | COMPOSITE | Master Project My Activities |
I_MSTRPROJNMBROFOVRDPURORDS | COMPOSITE | Number of Overdue POs for Master Project |
I_MSTRPROJNMBROFPURREQNS | COMPOSITE | Number of PRs Items for Master Project |
I_MSTRPROJPOOVERDUE | COMPOSITE | Master Project Purchase Order Overdue |
I_MSTRPROJPROCMTMATLSTDVH | COMPOSITE | Master Project Procurement Material Value Help |
I_MSTRPROJPROCMTSTRUCSTDVH | COMPOSITE | Master Project Procurement Structure Element |
I_MSTRPROJPROCMTSUPLRSTDVH | COMPOSITE | Master Project Procurement Supplier Value Help |
I_MSTRPROJPROCUREMENTSTRELM | COMPOSITE | Master Project Procurement Structure Element |
I_MSTRPROJPURCHASEORDERSTDVH | COMPOSITE | Master Project Purchase Order Value Help |
I_MSTRPROJPURORDITEM | COMPOSITE | View for Master Project Purchase Order Item |
I_MSTRPROJPURORDITEMSIMPLE | COMPOSITE | Simplified PO Items for Master Project |
I_MSTRPROJPURREQITEM | COMPOSITE | Master Project Purchase Requisition Item |
I_MSTRPROJPURREQITEMSIMPLE | COMPOSITE | Simplified PR Items for Master Project |
I_MSTRPROJPURREQNSTDVH | COMPOSITE | Master Project Purchase Requisition Value Help |
I_MSTRPROJRISKACTY | COMPOSITE | Master Project Risk Activity |
I_MSTRPROJSTRUCTURE | COMPOSITE | Master Project Structure Element |
I_MSTRPROJSTRUCTUREELEMENT | COMPOSITE | Master Project Structure Element |
I_NETWORKACTIVITYSIMPLE | COMPOSITE | Simplified Network Activity for Project |
I_NETWORKACTIVITYVALUEHELP | COMPOSITE | Network Activity Value Help |
I_NETWORKACTIVITYWITHVERSION | COMPOSITE | Network Activity With Version |
I_NMBROFOPNMAINTORDERBYTECHOBJ | COMPOSITE | Number of Open Maintainence Order by Technical Object |
I_OPACTYDOCINFORECDOBJLINK | COMPOSITE | Operation Activity Document Info Record Object Link |
I_OPACTYMAINWRKCTRMFGUSER | COMPOSITE | Mfg user with assgd main work center of an OA |
I_OPENMAINTORDERFORTECHOBJECT | COMPOSITE | Open Maintainance Orders for Technical Object |
I_ORDERREALTIMEPRODUCTIONCOST | COMPOSITE | Order Real Time Production Cost |
I_ORDHDRITMREALTIMEPRODNCOST | COMPOSITE | Order Header and Item Real Time Production Cost |
I_OUTSTANDINGCUSTPYMTAMT | COMPOSITE | Calculate Outstand Customer Payment |
I_OVERDUEMAINTENANCEORDERC | COMPOSITE | Overdue Maintenance Orders |
I_PCCORDERGENERALINFORMATION | COMPOSITE | PCC Order General Information |
I_PPM_PROJCOSTBYFISCALPERIOD | COMPOSITE | Project Costs by Fiscal Period |
I_PPM_PROJECTCOSTFORECASTDATA | COMPOSITE | Project Cost Forecast: ML Training Input |
I_PPM_PROJECTCOSTFORECASTTRNG | COMPOSITE | Project Cost Forecast: ML Training Input |
I_PPM_PROJECTCOSTSUMCURRENT | COMPOSITE | Project Cost To Current Date |
I_PPM_PROJECTCOSTSUMOVRL | COMPOSITE | Project Cost To Date |
I_PPM_PROJECTCOSTSUMTODATE | COMPOSITE | Project Cost To Date |
I_PPM_PRSTCMRACTVPROJCOSTCOMP | COMPOSITE | Active Projects – Projects Cost Chart by Components (OVP) |
I_PPM_PRSTCMRPROJBYKEYFIGURES | COMPOSITE | Projects By Key Figures |
I_PROCESSORDERMGMTWORKLIST | COMPOSITE | Process Order Management Worklist |
I_PROCESSORDERMGMTWRKLISTCALC | COMPOSITE | Process Order Management Worklist Calc |
I_PROCESSORDERSTDVH | COMPOSITE | Process Order |
I_PROCGEXECOPACTYINSTCETP | COMPOSITE | Open Processing Execution Operation Activity Instance |
I_PROCGEXECOPERATIONACTIVITY | COMPOSITE | Operation Activity |
I_PROCORDMGMTCOMPAVAILYSTS | COMPOSITE | Process Order Comp Availability Status |
I_PROCORDMGMTCONFIRMATION | COMPOSITE | Process Order Confirmation |
I_PROCORDMGMTDELAYISSUE | COMPOSITE | Process Order Delay Issue |
I_PROCORDMGMTGOODSMOVEMENT | COMPOSITE | Process Order Goods Movement |
I_PROCORDMGMTINSPLOT | COMPOSITE | Inspection Lot of Process Order |
I_PROCORDMGMTISSUES | COMPOSITE | Process Order Management Issues |
I_PROCORDMGMTOPCOMPONENTS | COMPOSITE | Process Order Operation Components |
I_PROCORDMGMTOPERATION | COMPOSITE | Process Order Operations |
I_PROCORDMGMTOPERATIONCALC | COMPOSITE | Process Order Operation Calculations |
I_PROCORDMGMTOPPHASE | COMPOSITE | Process Order Operation Phase |
I_PROCORDMGMTOPSOVW | COMPOSITE | Process order current and next ops ovw |
I_PROCORDMGMTQUALITYISSUE | COMPOSITE | Process Order Quality Issue |
I_PROCORDMGMTQUANTITYISSUE | COMPOSITE | Process Order Quantity Issue |
I_PROCORDMGMTWITHSTATUS | COMPOSITE | Process order with status |
I_PRODNORDERSUBOPBYSEMKEYSTDVH | COMPOSITE | Production Order SubOperation By Semantic Key |
I_PRODNORDOPBYSEMKEYSTDVH | COMPOSITE | Production Order Operation By Semantic Key |
I_PRODUCTCOSTBYORDERCUBE | COMPOSITE | Production Cost By Order |
I_PRODUCTCOSTCTRLGORDERSTDVH | COMPOSITE | Product Cost Controlling Order |
I_PRODUCTIONORDERQUICKVIEW | COMPOSITE | Quick view data for Production Order |
I_PRODUCTIONORDERSTDVH | COMPOSITE | Production Order |
I_PROJECTBDGTITEMSBYPOSTGPERD | COMPOSITE | Project Budget Items by Posting Period |
I_PROJECTBUDGETCONSUMPTION | COMPOSITE | Project Budget Consumption |
I_PROJECTBUDGETITEMS | COMPOSITE | Project Budget Items |
I_PROJECTBUDGETITEMSCUBE | COMPOSITE | Project Budget Items Cube View |
I_PROJECTCOSTDATES | COMPOSITE | Dates based on Project Plan/Actual Costs |
I_PROJECTCOSTLINEITEMS | COMPOSITE | Project Cost Line Items |
I_PROJECTCOSTLINEITEMSBYPERIOD | COMPOSITE | Project Cost Line Items by Period |
I_PROJECTCOSTLINEITEMSCUBE | COMPOSITE | Project Cost Line Items Cube |
I_PROJECTCOSTLINEITEMSOVW | COMPOSITE | Project Cost Line Items Overview |
I_PROJECTCOSTOBJECT | COMPOSITE | Project Cost Object |
I_PROJECTFINANCIALSUMMARY | COMPOSITE | Monitor Project Financials |
I_PROJECTMILESTONEVALUEHELP | COMPOSITE | Project Milestone Value Help |
I_PROJECTNETWORKSTDVH | COMPOSITE | Project Network Details |
I_PROJECTNTWKVALUEHELP | COMPOSITE | Project Network Value Help |
I_PROJECTOVERALLCOST | COMPOSITE | Project Overall Cost |
I_PROJMATCOMPONENTWITHVERSION | COMPOSITE | Project Material Component with Version |
I_PROJNETWORKWITHVERSION | COMPOSITE | Project Network and Version Details |
I_PROJPURDOCITEMS | COMPOSITE | Basic view for tab PurDoc on WBSElement app |
I_PUBSECBDGTACTLITEMBASIC | COMPOSITE | Budget Cmtmt and Actual Items Basic |
I_PUBSECBDGTACTLITEMCUBE | COMPOSITE | Budget Cmtmt and Actual Items – Cube |
I_QUEUINGOPERATIONS | COMPOSITE | Queuing Operations |
I_REACCOUNTINGOBJECT | COMPOSITE | Real Estate Accounting Object |
I_REALTIMEMFGORDERPOSTEDKPI | COMPOSITE | Posted Event-Based WIP and Variance Exceptions |
I_REALTIMEMFGORDERTOBEPOSTDKPI | COMPOSITE | To be posted Event-Based WIP and Variance Exceptions |
I_REALTIMEPRODNCOSTCOMPGROUP | COMPOSITE | Real Time Production Cost Component Groups |
I_REALTIMEWORKINPROCESS | COMPOSITE | Real Time WIP Reporting |
I_RSHMAINTSCHEDEXISTINGOP | COMPOSITE | Existing Operations not part of Schedule |
I_RSHMAINTSCHEDSMLTDOP | COMPOSITE | Maint Scheduling Simulation Operations |
I_RSHMAINTSCHEDSMLTDWRKCTR | COMPOSITE | List of Workcenters in the Schedule |
I_RSHOPERATIONANDSUBOPERATION | COMPOSITE | Maintenance Order Operation and Suboperation |
I_RSHORDER | COMPOSITE | Maintenance Orders |
I_SALESORDERFLFMTISSUEBASIC | COMPOSITE | SOFM Issue Without Details |
I_SALESORDERFULFILLMENTISSUE | COMPOSITE | SOFM Issue |
I_SALESORDERINSUPPLYMFGISSUE | COMPOSITE | SOFM Manufacturing Issue |
I_SCHEDAGRMTACCT | COMPOSITE | Scheduling Agreement Account Assignment |
I_SCHEDPRODNOPERATIONS | COMPOSITE | All scheduled operations |
I_SCHEDPRODNWRKCTRSQNCVH | COMPOSITE | Work Ctr Filter for dispatch by sequence |
I_SCHEDWORKLISTOPERATION | COMPOSITE | Operations worklist for Sched Prodn |
I_SFIDOCINFORECDOBJLINK | COMPOSITE | Shop Floor Item Document Info Record Object Link |
I_SFIOPACTYINSPCHARCSAGGRG | COMPOSITE | Interface view for Insp. Char. for Oper. Acty. in MfgOrder |
I_SLSDOCFLFLLMNTPROCFLOW | COMPOSITE | SlsDoc Fulfillment Analyzer Process Flow |
I_SLSORDFLFMTINSUPMFGCONTACT | COMPOSITE | SOFM Sales Order Fulfillment In Supply Manufact. Contact |
I_SLSORDFLFMTINSUPPLYCONTACT | COMPOSITE | SOFM Sales Order Fulfillment In Supply Contact |
I_SLSORDFLFMTMFGORDER | COMPOSITE | SOFM Manufacturing Order |
I_SLSORDFLFMTPROCESSFLOW | COMPOSITE | SOFM Process Flow |
I_SOFULFILLMENTMONITOR_F2200 | COMPOSITE | Categorize Sales Orders |
I_SRVCCONTRFINANCIALCUBE | COMPOSITE | Service Contract Financial – Cube |
I_SRVCCONTRINTORDERCUBE | COMPOSITE | Internal Order of Srvc Contract – Cube |
I_STATISTICALKEYFIGUREITEM | COMPOSITE | Statistical Key Figure Items |
I_SUMCUSTPYMTAMOUNT | COMPOSITE | Outstanding Customer Payment |
I_SUPDMNDALLDOCOVWCUBE | COMPOSITE | Cube View for Overview of Supply and Demand |
I_SUPDMNDALLDOCPRODNORD | COMPOSITE | View for Production Order |
I_SUPDMNDALLDOCPRODNORDASSGC | COMPOSITE | Cube View for Production Order Assignment Details |
I_SUPDMNDALLDOCPRODNORDC | COMPOSITE | Cube View for Production Order Details |
I_SUPDMNDALLDOCSUPPLY | COMPOSITE | View for Supply of All Documents |
I_SUPDMNDALLDOCTOTSUP | COMPOSITE | View for Total Supply of All Document Types |
I_SUPDMNDALLDOCTOTSUPCUBE | COMPOSITE | Cube View for Total Supply of All Document Types |
I_SUPDMNDOVWPGTOTSUPC | COMPOSITE | Cube View for Total Supply of all Sources |
I_TODAYSOPERATIONS | COMPOSITE | Todays Operations |
I_TRACKTOOLUSAGEOPACTYEQUIP | COMPOSITE | List of OAs for Equipment |
I_USERDEFAULTSETTINGITEMWD | COMPOSITE | User Defaults BO Item view |
I_WBSORDERS | COMPOSITE | WBS Element Order Details |
I_WORKCENTERCAPORDERPERBUCKET | COMPOSITE | Load Distribution at shift level for operations |
I_WORKCENTERCAPPERBUCKET | COMPOSITE | WorkCenter capacity evaluation |
I_WORKCENTERCAPPPLINEOP | COMPOSITE | Load all opr for manufacturing and planned order for Cap |
I_WORKCENTERPRODCOSTCUBE | COMPOSITE | Production Cost By Work Center |
I_WORKCENTERPRODUCTCOST | COMPOSITE | Interface View for Product Cost by Work Center |
I_WORKCTROPLOADDISTRAGGRGD | COMPOSITE | Load Distribution at shift level for operations |
P_ACTUALSCONV | COMPOSITE | Actuals in Used currency |
P_BUDGETPOSTINGSBYCURRENTYEAR | COMPOSITE | Get Projects which has budget postings for current year |
P_BUDGETPOSTINGSBYFISCALYEAR | COMPOSITE | Budget Postings by Fiscal Year |
P_CAPACITYSCHEDOPERSCOUNT | COMPOSITE | Count of operations on the same capacity |
P_CAPEVALCAPACITYDETSINDCMLS | COMPOSITE | Capacity Details in Decimals in Time Period |
P_CAPOPMAXMINDTE | COMPOSITE | Maximum and Minimum Date for Operations of Workcenter |
P_CHGIMPACTNTWKORDERSTATUS | COMPOSITE | Network Order Status |
P_CHGIMPACTORDERSTATUS | COMPOSITE | Production Order Status |
P_CHGIMPACTSTATUSCODES | COMPOSITE | Change Impact Order ID for Status |
P_COACTLPLNTGTVARCRAUNION | COMPOSITE | Private view for CO Costs Union |
P_COEVTBSDORDERACTUALCOSTGRP1 | COMPOSITE | Event Based Order Actual Cost Groups |
P_COEVTBSDORDERACTUALCOSTGRP2 | COMPOSITE | Event Based Order Actual Cost Groups |
P_COEVTBSDORDERACTUALCOSTGRP3 | COMPOSITE | Event Based Order Actual Cost Groups |
P_COEVTBSDORDERACTUALCOSTGRP4 | COMPOSITE | Event Based Order Actual Cost Groups |
P_COEVTBSDORDERACTUALCOSTSUM | COMPOSITE | Event Based Order Actual Costs Sum |
P_COEVTBSDORDERTARGETCOST2 | COMPOSITE | Event Based Order Target Costs by Crcy Role |
P_COEVTBSDORDERTARGETCOST3 | COMPOSITE | Event Based Order Target Costs by PlnCat |
P_COMFGORDERTARGETBYOBJECT | COMPOSITE | Target Costs by Object for Manufacturing Orders |
P_COMFGORDERTARGETCUBE | COMPOSITE | Target Costs Cube for Manufacturing Orders |
P_COMFGORDERTARGETCUBE1 | COMPOSITE | Target Costs Cube for Manufacturing Orders |
P_COMFGORDERTGTCOSTBYOBJECT | COMPOSITE | Target Costs Cube for Manufacturing Orders |
P_CONTROLLINGOBJECTENHANCED | COMPOSITE | P_ControllingObjectEnhanced |
P_COORDEROUTPUTQUANTITIES | COMPOSITE | CO Order Output Quantities |
P_COORDEROUTPUTQUANTITIES2 | COMPOSITE | CO Order Output Quantities 2 |
P_COORDERPLANTARGETBYOBJECT | COMPOSITE | Plan and Target Costs by Object |
P_COORDERPLANTARGETCUBE | COMPOSITE | Order Plan Target Cube |
P_COOUTPUTQUANTITIESBYOBJECT2 | COMPOSITE | CO Output Quantity By Object 2 |
P_COPCCORDERACTUALBALANCE | COMPOSITE | CO PCC ORDER ACTUAL BALANCE |
P_COPCCORDERANDITEMACTUALCUBE | COMPOSITE | CO PCC Order And Item Actual Cube |
P_COPCCORDERANDITEMCOSTS1 | COMPOSITE | CO PCC Order and Item Costs Layer 1 |
P_COPCCORDERANDITEMCOSTS2 | COMPOSITE | CO PCC Order and Item Costs Layer 2 |
P_COPCCORDERANDITEMCOSTS3 | COMPOSITE | CO PCC Order and Item Costs Layer 3 |
P_COPCCORDERANDITEMCOSTS4 | COMPOSITE | CO PCC Order and Item Costs Layer 4 |
P_COPCCORDERANDITEMCOSTSCUBE | COMPOSITE | CO PCC Order Costs Cube |
P_COPCCORDPLNTGTWIPBYOBJECT | COMPOSITE | Plan and Target Costs and WIP by Object for PCC Orders |
P_COPRODUCTCOSTBYORDER | COMPOSITE | CO Production Costs By Object |
P_COPRODUCTCOSTBYORDERANDITEM | COMPOSITE | CO Production Costs By Object |
P_COSTCENTERBUDGET | COMPOSITE | Cost Center Budget Report |
P_COSTCENTERBUDGETBAL | COMPOSITE | Cost Center Budget Report Balances |
P_CTRLGSETTLEMENTOBJECT | COMPOSITE | Controlling Settlement Object |
P_DEMANDDRIVENORDERS | COMPOSITE | Demand Driven Relevant Orders |
P_ENTERPRISEPROJECTRANKINGCOST | COMPOSITE | Costs of projects assigned to Ranking |
P_ENTPROJCOSTDATES | COMPOSITE | Project Cost Start and End Dates |
P_ENTPROJCOSTDATESAGG | COMPOSITE | Enterprise Project Cost Dates Aggregated |
P_ENTPROJCOSTLINEITEMS | COMPOSITE | Enterprise Project Cost Line Items |
P_ERPACTUALWIP | COMPOSITE | ERP acenario Actuals and WIP |
P_EVENTBASEDORDERKPI | COMPOSITE | Event-based Order KPI |
P_GR_DUEDAYS | COMPOSITE | Calculate GoodsReceipt OverDueDays |
P_JITMATLRCPNTDOCUMENTS | COMPOSITE | Just-In-Time Material Combined Recipient Documents |
P_JVAACTLBDGTFOROPLEXPENSESOVW | COMPOSITE | Actual Cost & JV Budget for Opex Expense |
P_JVAACTUALBUDGETOVERVIEW | COMPOSITE | Actual Cost and JV Budget |
P_JVAACTUALCAPITALEXPNDTROVW | COMPOSITE | Actual Cost & Capital Expenditure Ovw |
P_MAINTENANCEJOBANDWORKITEM | COMPOSITE | Maintenance Job and Work Item |
P_MAINTENANCEJOBOVERALLSTATUS | COMPOSITE | EAM Object Phase for Leading Job Document |
P_MAINTNOTIFFORSCREENINGC | COMPOSITE | Maintenance Notifications for Screening Cube |
P_MAINTOBJBREAKDOWNCUBE | COMPOSITE | Maintenance Object Breakdown Private Cube |
P_MAINTORDDIRECTPROCMTVIAPO | COMPOSITE | Purchase Orders for Direct Procurement |
P_MAINTORDDIRECTPROCMTVIAPR | COMPOSITE | Purchase Requisitions for Direct Procurement |
P_MAINTORDERBASICDATA | COMPOSITE | Maintenance order basic data |
P_MAINTORDERSFORPLANNINGC | COMPOSITE | Maintenance Orders for Planning |
P_MAINTORDRESPONSIBLEPARTNER | COMPOSITE | Responsible Partner for Maintenance Order Header |
P_MASTERPROJECTACTUALS | COMPOSITE | Union of total actuals and actuals till month |
P_MASTERPROJECTACTUALSCALC1 | COMPOSITE | Get Actulas time stamp |
P_MASTERPROJECTACTUALSCALC2 | COMPOSITE | Get Actulas Cur month |
P_MASTERPROJECTACTUALTILLMONTH | COMPOSITE | Get master Project actuals Till month |
P_MFGEXECEVENTHISTORDER | COMPOSITE | Order Execution Event History |
P_MFGORDACTLPLNSTDTGTUNION | COMPOSITE | Manufacturing Orders Actual/Plan/Standard/Target Costs Union |
P_MFGORDACTLPLNTGTUNION | COMPOSITE | Private view for actual/plan/target union |
P_MFGORDCOMPNOINSTCEASSYBYDGTL | COMPOSITE | DMU Instance whose component is assembled into an Order |
P_MFGORDERACTLPLANTGTCOST | COMPOSITE | Private view for actual/plan/target cost |
P_MFGORDERACTLPLANTGTCOSTCUBE | COMPOSITE | Private view actual/pln/target cost cube |
P_MFGORDERACTLPLANTGTCOSTDET | COMPOSITE | Private view for actual/plan/target cost details |
P_MFGORDERDOCINFORECDOBJLINK | COMPOSITE | Mfg Order Document Info Record Object Link |
P_MFGORDEROPERATIONAGGR | COMPOSITE | Manufacturing Order Operation |
P_MFGORDEROPERATIONDELAY | COMPOSITE | Manufacturing Order Operation Delay |
P_MFGORDEROPERATIONDELAYBASIC | COMPOSITE | Manufacturing Order Operation Delay Basic Data |
P_MFGORDEROPERATIONSTATUS | COMPOSITE | Manufacturing Order Operation Status |
P_MFGORDERPICKABLECOMPCOUNT | COMPOSITE | Manufacturing Order Pickable Component Count |
P_MFGORDERSTATUS | COMPOSITE | Manufacturing Order Status |
P_MFGORDERWIPVARCCUBE | COMPOSITE | Private view for Manufacturing Order WIP / Variance Cube |
P_MFGORDERWIPVARIANCE | COMPOSITE | Private view for Manufacturing Order WIP / Variance |
P_MFGORDLINKEDSAPOBJKEYRNGE | COMPOSITE | Range for selection of Order Linked SAP Object Key |
P_MFGORDTARGETCOST1 | COMPOSITE | Private view for target cost product costing |
P_MFGPROCGEXECORDMAINSTATUS | COMPOSITE | Manufacturing Order Main Execution Status |
P_MFGPROCGEXECORDMAINSTATUS2 | COMPOSITE | Manufacturing Order Main Execution Status |
P_MILESTONEWITHVERSION | COMPOSITE | Private basic view for Milestone app |
P_MNTRWRKCTRORDEROPERATIONS | COMPOSITE | Work Center Order Operations |
P_MPACTIVITIES | COMPOSITE | Master Project Activities |
P_MPACTIVITYDETAIL | COMPOSITE | Master Project Activity Detail |
P_MPACTUALREVCOST | COMPOSITE | Master Project Actual and Revenue cost sum |
P_MPAPPSERVSHEET | COMPOSITE | Get Approved ServiceSheets |
P_MPEKBETYPE2 | COMPOSITE | Get all Vendor Invoice |
P_MPEKBETYPE5 | COMPOSITE | Get all Vendor Payment |
P_MPEKBETYPE9 | COMPOSITE | Get all unapprovedServiceSheet |
P_MPNWE | COMPOSITE | NetworkElement Details for Master Project List |
P_MPNWEPURDOC | COMPOSITE | PurchaseDocuments in NetworkActivity Level |
P_MPODUEVENINV | COMPOSITE | Calculate Overdue Vendor Invoice Days |
P_MPODUEVENPAY | COMPOSITE | Calculate Overdue Vendor Payment |
P_MPPROCUREMENT | COMPOSITE | Master Project Procurement |
P_MPPROCUREMENTSTRUCTURE | COMPOSITE | Union to get Master Project Elements |
P_MPPURREQPURORD | COMPOSITE | Procurement Data |
P_MPSCHEDULE | COMPOSITE | ScheduleAgreements for MP |
P_MPSERVSHEETDETAILS | COMPOSITE | Master Project Service Sheet Details |
P_MSTRPROJACTLCOSTQTY | COMPOSITE | Actuals for Master Project |
P_MSTRPROJACTUALREVCOST | COMPOSITE | Master Project Actual |
P_MSTRPROJACTUALSHCS | COMPOSITE | Actual Cost revenue for HCS |
P_MSTRPROJACTUALSINPROJCRCY | COMPOSITE | Master Project Actual cost & revenue in project currency |
P_MSTRPROJACTUALWIP | COMPOSITE | Master Project Actuals with WIP |
P_MSTRPROJACTUALWIPCOST | COMPOSITE | Actual cost with work in progress |
P_MSTRPROJAGGRGDACTLCOST | COMPOSITE | Aggregated Actual Cost for Master Project Structure Elements |
P_MSTRPROJCHKLSTREFERENCEDOC | COMPOSITE | Master Project Checklist Reference Document |
P_MSTRPROJCTRLGOBJACTLREVCOST | COMPOSITE | Actuals for all the controlling objects |
P_MSTRPROJDEBT | COMPOSITE | Master Project Debt |
P_MSTRPROJEXCLDSTSTCLKEYFIG | COMPOSITE | Master Project Excluded SKF List |
P_MSTRPROJFINPLANSTSTCLKEYFIG | COMPOSITE | Master Project Financial Plan with SKF |
P_MSTRPROJHIERACTLCOSTREV | COMPOSITE | Master Project Actual Cost and revenue |
P_MSTRPROJHIERARCHY | COMPOSITE | Master Project Hierarchy |
P_MSTRPROJHIERCOMMITMENT | COMPOSITE | Master Project Hierarchy Commitment |
P_MSTRPROJHIERSALES | COMPOSITE | Master Project |
P_MSTRPROJHIERWITHSTSTCLKEYFIG | COMPOSITE | Master Project Hierarchy with SKF |
P_MSTRPROJKPIERP | COMPOSITE | Plan and actual cost: ERP scenario |
P_MSTRPROJPLANACTUAL | COMPOSITE | Master Project Plan Actual |
P_MSTRPROJPLANCOST | COMPOSITE | Plan Cost |
P_MSTRPROJSALESORDACTUALS | COMPOSITE | Provides Master Project Sales Order only actuals |
P_MSTRPROJSTRUCTELMNTACTUALS | COMPOSITE | Master Project actuals for no SKF posting |
P_MSTRPROJSTRUCTURE | COMPOSITE | Master Project Structure Elements |
P_MSTRPROJWTHFINPLAN | COMPOSITE | Master Project Hierarchy With Financial Plan |
P_MSTRPROJWTHSTSTCLKEYFIG | COMPOSITE | Master Project Structure Elements with SKF |
P_NETWORKACTIVITYWITHVERSION | COMPOSITE | View for Union Network Activity(OperVer) |
P_NMBROFINSPLOTWTHRJCTDCHAR | COMPOSITE | Process Order Inspection Lots with rejected characteristics |
P_NMBROFPROCORDOPPHASES | COMPOSITE | Number of Phases of a Process Order Operation |
P_NMBROFPROCORDOPSWITHDELAY | COMPOSITE | Number of Process order operations with delay |
P_NMBROFPROCORDOPSWITHQLTYISS | COMPOSITE | Nmbr of Proc Ord Ops with quality issues |
P_NMBROFPROCORDOPSWITHQTYISS | COMPOSITE | Number of Process order ops with qty issue |
P_ODUE_GRECPT | COMPOSITE | Calculate Overdue Goods |
P_OPACTYASSYBYORIGLCOMPUNION | COMPOSITE | SFI@OA Assembly by original component (manual & backflushed) |
P_OPACTYCOMPONENTASSIGNMENTDMU | COMPOSITE | Operation Activity Instance Component Assignment for DMU |
P_OPACTYMAINWRKCTRMFGUSER | COMPOSITE | Mfg user with assgd main work center of an OA |
P_OPACTYNUMBEROFINSPCHARCS | COMPOSITE | To determine if IC are present for OA |
P_OPERATIONACTIVITYWORKLIST | COMPOSITE | Operation Activity Worklist |
P_ORDERCATEGORYOBJECT | COMPOSITE | Project Cost Object Order Category |
P_ORDERDURATIONCALCFIELDS | COMPOSITE | Calculation of order duration |
P_ORDERITEMCATEGORYOBJ | COMPOSITE | Project Cost Object Order Item Category |
P_ORDERREALTIMEPRODUCTIONCOST1 | COMPOSITE | Event Based Order Real Time Production Costs Details |
P_ORDERREALTIMEPRODUCTIONCOST2 | COMPOSITE | Order Real Time Production Cost |
P_ORDHDRITMREALTIMEPRODNCOST1 | COMPOSITE | Event Based Order Header and Items RT Prodn Costs Details |
P_ORDHDRITMREALTIMEPRODNCOST2 | COMPOSITE | Order Header and Items Real Time Production Cost |
P_OVERDUEMAINTENANCEORDERC | COMPOSITE | Overdue Maintenance Orders |
P_PCCORDERGENERALINFORMATION | COMPOSITE | PCC Order General Information |
P_PLANCOSTTILLMONTH | COMPOSITE | Plan Cost till month from ERP |
P_PPM_PROJCOSTSUMPERD | COMPOSITE | Project Cost – Sum by Period |
P_PPM_PROJECTCOSTLINEITEM | COMPOSITE | togetCostLineItems |
P_PPM_PROJECTCOSTLINEITEMS | COMPOSITE | PPM Project Cost Line Items |
P_PPM_PRSTCMRPROJBYKEYFIGURES | COMPOSITE | Projects By Key Figures |
P_PROCESSORDERMGMTWRKLISTCALC | COMPOSITE | Process Order calculations |
P_PROCGEXECOPERATIONACTIVITY | COMPOSITE | Operation Activity |
P_PROCORDCUROP | COMPOSITE | Process order current operation details |
P_PROCORDCUROPPHSEAGGRGN | COMPOSITE | Process Order Operation Phases Aggregation |
P_PROCORDEROPERATIONDURN | COMPOSITE | Process Order Operation Durations |
P_PROCORDFIRSTOP | COMPOSITE | Process order first operation details |
P_PROCORDFIRSTOPAGGR | COMPOSITE | Process order first operation |
P_PROCORDFIRSTOPERATION | COMPOSITE | Process Order First Operation |
P_PROCORDINSPLOTUSGEDCSNCODER | COMPOSITE | Process Order Inspection Lots with Usage Decision Code R |
P_PROCORDINSPLOTWTHRJCTDCHAR | COMPOSITE | process order inspection lot with rejected characteristics |
P_PROCORDINSPRJCTDCHAR | COMPOSITE | process order inspection lot characteristics |
P_PROCORDLATESTOP | COMPOSITE | Process order latest operation details |
P_PROCORDLATESTOPAGGR | COMPOSITE | Process order latest operation aggregation |
P_PROCORDMGMTBASIC | COMPOSITE | Process order |
P_PROCORDMGMTBATCHAGGR | COMPOSITE | Calculate Batch from GR |
P_PROCORDMGMTBATCHCALC | COMPOSITE | Calculate Batch from GR |
P_PROCORDMGMTCOMPAVAILYSTS | COMPOSITE | Process Order Comp Availability Status |
P_PROCORDMGMTCOMPLTSTAGGR | COMPOSITE | Process Order Component Latest Aggregation |
P_PROCORDMGMTCOMPLTSTBATCH | COMPOSITE | Process Order Component Latest Batch |
P_PROCORDMGMTDELAYISSUE | COMPOSITE | Process Order Delay Issue |
P_PROCORDMGMTOPCOMPONENTS | COMPOSITE | Process Order Operation Components |
P_PROCORDMGMTOPCOMPWITHSTS | COMPOSITE | Process Order Op Components with status |
P_PROCORDMGMTOPERATION | COMPOSITE | Process order operation basic view |
P_PROCORDMGMTOPERATIONBASIC | COMPOSITE | Process Order operations basic view |
P_PROCORDMGMTOPERATIONCALC | COMPOSITE | Process Order Operation Calculations |
P_PROCORDMGMTQUALITYISSUE | COMPOSITE | Process Order Quality Issue |
P_PROCORDMGMTQUANTITYISSUE | COMPOSITE | Process Order Quantity Issue |
P_PROCORDMISGCOMPAGGRGN | COMPOSITE | Process Order Missing Components Aggregation |
P_PROCORDNEXTOP | COMPOSITE | Process order next operation details |
P_PROCORDNXTOPAGGR | COMPOSITE | Process order next operation |
P_PROCORDNXTOPCALC | COMPOSITE | Process Order Next Operation Calc |
P_PROCORDOPDELAYAGGRGN | COMPOSITE | Process order operation delay aggregation |
P_PROCORDOPERATIONQTYISSUE | COMPOSITE | Process order operations quantity issue |
P_PROCORDOPERATIONWITHSTATUS | COMPOSITE | Process Order operations with status |
P_PROCORDOPINCONFDSTSAGGRGN | COMPOSITE | Process order operations in confirmed status |
P_PROCORDOPQUALITYISSAGGRGN | COMPOSITE | Process order quality issue aggregation |
P_PROCORDOPSTATUS | COMPOSITE | Process Order operations with status basic |
P_PROCORDOPSUCCSSRPHASECALC | COMPOSITE | Process order operation successor phase calculcation |
P_PRODUCTCOSTCTRLGORDERANDITEM | COMPOSITE | Production Order |
P_PROJACTLPLNJRNLENTRITM | COMPOSITE | Project Actual Plan Journal Entry Items |
P_PROJACTUALCOSTLINEITEMS | COMPOSITE | Project Cost Line Items with Actual Costs |
P_PROJCMTMTCOSTLINEITMS | COMPOSITE | Project Cost Line Items with Commitment Costs |
P_PROJCOSTACCTGLINEITMS | COMPOSITE | Projects with Accounting Cost Line Items |
P_PROJCOSTITEMS_OVW | COMPOSITE | Project Cost Line Items |
P_PROJCOSTLINEITEMUNION | COMPOSITE | Project Cost Line Items Union |
P_PROJCOSTSPCLPERDTMERNGE | COMPOSITE | Project Cost Line Items Cube |
P_PROJECTACTUALCOSTDATES | COMPOSITE | Dates based on Project Actual Costs |
P_PROJECTBUDGETCONSUMPTION | COMPOSITE | Project Budget Consumption |
P_PROJECTBUDGETITEMS | COMPOSITE | Project Budget Items |
P_PROJECTCOSTLINEITEMS | COMPOSITE | Project Cost Line Items |
P_PROJECTCOSTOBJECT | COMPOSITE | Project Cost Object |
P_PROJECTCOSTSUM | COMPOSITE | Project Total Actual Costs |
P_PROJECTFINANCIALSUMMARY | COMPOSITE | Project Financial Summary |
P_PROJECTFINBDGTSUMMARY | COMPOSITE | Project Financial Budget Summary |
P_PROJECTFINBUDGETSMMRY | COMPOSITE | Project Financial Budget Summary |
P_PROJECTOVERALLCOST | COMPOSITE | Project Overall Cost |
P_PROJECTPLANCOSTDATES | COMPOSITE | Dates based on Project Actual Costs |
P_PROJECTPREDICTIONSUMMARY | COMPOSITE | Project Costs with predictions and missing months |
P_PROJFINSMMRYLNITEMS | COMPOSITE | Project Financial Summary Line Items |
P_PROJMATCOMPONENTWITHVERS | COMPOSITE | Mat Component Union (Operative + Ver.) |
P_PROJNETWORKWITHVERSION | COMPOSITE | Network Union View (Operative + Ver.) |
P_PROJPLNCOSTLINEITMS | COMPOSITE | Project Cost Line Items with Planning Category Costs |
P_PROJPMOCOSTLINEITMS | COMPOSITE | Project Cost Line Items with PMO Costs |
P_PROJPREDTWTHMISGMNTHSMMRY | COMPOSITE | Project Prediction With Missing Month |
P_PROJSUMOFOVRLCOSTS | COMPOSITE | Project Sum Of Overall Costs |
P_PURDOCMP | COMPOSITE | PurchaseDoc for MasterProject |
P_REALTIMEMFGORDER | COMPOSITE | Event-based Order |
P_REALTIMEMFGORDERPOSTEDKPI | COMPOSITE | Event-based Order KPI |
P_REALTIMEMFGORDERTOBEPOSTDKPI | COMPOSITE | Event-based Order KPI |
P_REALTIMEORDERCOST | COMPOSITE | Real-Time Order Cost |
P_REALTIMEORDERCOSTINFO | COMPOSITE | Order Cost Info |
P_REALTIMEORDERCOSTINFO1 | COMPOSITE | Order Cost Info Layer 1 |
P_REALTIMEWORKINPROCESS4 | COMPOSITE | Real Time WIP Reporting – Order Data with Costing |
P_REALTIMEWORKINPROCESS5 | COMPOSITE | Real Time WIP Reporting – Order Data calculations |
P_REALTMEWRKINPROCORDHDANDITEM | COMPOSITE | Real Time Work in Process Order Header and Items |
P_RTOCD_ACTWIPPLNTGTVARCUNION | COMPOSITE | Real-Time Order Cost Details – Actl/WIP/Plan/Tgt/Varc Union |
P_RTOCD_EXCEPTIONSTATUS | COMPOSITE | Real-Time Order Cost Exception Status |
P_RTOCD_EXCEPTIONSTATUS1 | COMPOSITE | Real-Time Order Cost Exception Status |
P_RTOCD_EXCEPTIONSTATUS2 | COMPOSITE | Real-Time Order Cost Exception Status |
P_RTOCD_ORDERANDITEMCOSTS | COMPOSITE | Real-Time Order Cost Details – Order And Item Costs |
P_RTOCD_ORDERANDITEMCOSTS1 | COMPOSITE | Real-Time Order Cost Details – Order And Item Costs |
P_RTOCD_ORDERANDITEMCOSTS2 | COMPOSITE | Real-Time Order Cost Details – Order And Item Costs |
P_RTOCD_ORDERANDITEMCOSTS3 | COMPOSITE | Real-Time Order Cost Details – Order And Item Costs |
P_RTOCD_ORDERANDITEMCOSTS4 | COMPOSITE | Real-Time Order Cost Details – Order And Item Costs |
P_RTOCD_ORDERANDITEMCOSTS5 | COMPOSITE | Real-Time Order Cost Details – Order And Item Costs |
P_RTOCD_ORDERITEMACTUAL | COMPOSITE | Order and Item Actual Costs |
P_RTOCD_ORDERITEMACTUAL1 | COMPOSITE | Order and Item Actual Costs Layer 1 |
P_RTOCD_ORDEROUTPUTQTY | COMPOSITE | Real-Time Order Output Quantity |
P_RTOCD_ORDEROUTPUTQTY1 | COMPOSITE | Real-Time Order Output Quantity |
P_RTOCD_ORDERTARGET | COMPOSITE | Real-Time Order Cost Details – Target Costs |
P_RTOCD_PLANTARGET | COMPOSITE | Real-Time Order Cost Details – Plan Target |
P_RTWIP_FINALPRODUCTCOST1 | COMPOSITE | Real-Time Work In Process Final Product Cost |
P_RTWIP_FINALPRODUCTCOST2 | COMPOSITE | Real-Time Work In Process Final Product Cost |
P_RTWIP_FINALPRODUCTCOST3 | COMPOSITE | Real-Time Work In Process Final Product Cost |
P_RTWIP_FINALPRODUCTCOST4 | COMPOSITE | Real-Time Work In Process – Final Product Cost |
P_RTWIP_ORDERHEADERANDITEM | COMPOSITE | Real-Time Work in Process Order Header and Item |
P_RTWIP_PRODUCTIONORDER | COMPOSITE | WIP: Production Order |
P_SALESORDERFLFMTISSUEUNION | COMPOSITE | SOFM Issue Union |
P_SALESORDERINSUPPLYMFGISSUE1 | COMPOSITE | SOFM Manufacturing Issue 1 |
P_SALESORDERINSUPPLYMFGISSUE2 | COMPOSITE | SOFM Manufacturing Issue 2 |
P_SCHEDCHNGOPERSLIVECACHEMAP | COMPOSITE | Map changed operation detail to LC format |
P_SCHEDOPERATIONS | COMPOSITE | Scheduled Operation details |
P_SCHEDOPERATIONS_VERSION_2 | COMPOSITE | Schedule Production Operations |
P_SCHEDOPERSLIVECACHEMAP | COMPOSITE | Map operations to liveCache form |
P_SCHEDORDEXTDDETS | COMPOSITE | Schedule Production Orders Extended Details |
P_SCHEDPRODNDISPATCHORDERDETS | COMPOSITE | Schedule Production Orders Extended Details |
P_SCHEDPRODNOPERATIONBASIC | COMPOSITE | Operation Basic Data |
P_SCHEDPRODNOPERATIONDURN | COMPOSITE | Operation Duration |
P_SCHORDERDETS | COMPOSITE | Schedule production order details |
P_SFICONFIRMATION | COMPOSITE | SFI Confirmations in Detail |
P_SFICONFTIMETOTALS | COMPOSITE | SFI Confirmation Time Totals |
P_SFILEADTIMEPERSTATUSAGG | COMPOSITE | SFI Lead Time per Status – aggregated |
P_SLSORDFLFMTPROCESSFLOW11 | COMPOSITE | SOFM Process Flow 1.1 |
P_SOFAPROCFLOW11 | COMPOSITE | SOFA Process Flow:: Level +1 Manufacturing Order |
P_SRVCCONTRGLACCTSUMCARD | COMPOSITE | Service Contract Finance Cube |
P_SRVCDOCINTORDFINCNVRSNDATA | COMPOSITE | Service Document Internal Order Finance Conversion Data |
P_SRVCDOCINTORDFINDATA | COMPOSITE | Service Document Internal Order Finance Data |
P_SS_DUEDAYS | COMPOSITE | ServiceSheet Overdue for Approval |
P_STATISTICALKEYFIGUREITEM | COMPOSITE | Statistical Key Figure Items |
P_STSTCLKEYFIGVALUEACTIVEITEM | COMPOSITE | P View for SKFV Active Item |
P_SUPDMNDALLDOCOVW | COMPOSITE | Overview of Demand and Supply |
P_TOTRQDCAPACITYBKWDWRKCTR | COMPOSITE | Total Required Capacity for Work Center |
P_TOTRQDCAPACITYFORWRKCTR | COMPOSITE | Total Required Capacity for Work Center |
P_TRACKTOOLUSAGEOAPRT | COMPOSITE | PRT NAMES ASSIGNED TO OA |
P_TRACKTOOLUSAGEOAPRTASSIGNED | COMPOSITE | PRT IDs Assigned To OA |
P_TRACKTOOLUSAGEOATTUCLAIMED | COMPOSITE | GET CLAIMED OA EQUIPENTS |
P_VI_DUEDAYS | COMPOSITE | Vendor Invoice DueDays |
P_VP_DUEDAYS | COMPOSITE | Vendor Payment Duedays |
P_WBSORDERS | COMPOSITE | Private basic view for tabNetwork\Orders in WBSElement app |
P_WORKCENTERCAPACITYEVAL | COMPOSITE | WorkCenter – Capacity Evaluation |
P_WORKCENTERCAPEVALSHIFT | COMPOSITE | WorkCenter Capacity Evaluation |
P_WORKCENTERCAPMAXMINDTE | COMPOSITE | Get the Minimum and Maximum date for orders of a capacity |
P_WORKCENTERCAPPPLINEOP | COMPOSITE | Load day opr for manufacturing and planned order for Cap |
P_WORKCENTERCAPREQS | COMPOSITE | Load day opr for manufacturing and planned order for Cap |
P_WORKCENTERCAPSHIFTOP | COMPOSITE | Loaded Orders per shift for capacity |
P_WORKCENTEROPDISTRPCT | COMPOSITE | WorkCenter- Operation Total capactiy |
P_WORKCENTERPRODUCTCOST | COMPOSITE | Private View for Product Cost By Work Center |
P_WORKCENTERTARGETCOSTS | COMPOSITE | Target Costs by Work Center |
P_WORKREQUESTORDERUNION | COMPOSITE | Private view for Order and Notification |
P_WPMO_PROJCOSTLINEITEMS | COMPOSITE | PPM Project Cost Line Items |
P_WRKCTRCAPCITYEVALAGGRGD | COMPOSITE | WorkCenter Capacity Evaluation |
P_WRKCTRCAPEVALWRKDAYS | COMPOSITE | Capacity Load Distribution with working days |
P_WRKCTRCAPNIGHTSAGGRGD | COMPOSITE | WorkCenter Capacity Evaluation |
P_WRKCTRCAPOPDATERANGE | COMPOSITE | Work Center operations in given date range |
P_WRKCTRCAPOPWITHNIGHTS | COMPOSITE | Load all opr for manuf and planned order for Cap with shifts |
P_WRKCTRCAPOPWRKDAYS | COMPOSITE | Capacity Load Distribution with working days |
P_WRKCTRCAPREQSINSECS | COMPOSITE | Work Center operations in given date range |
P_WRKCTRMNTRMINORDEROPERATION | COMPOSITE | P View For Min Order Operation |
P_WRKCTRMNTRORDERCALCFIELDS | COMPOSITE | Calculate Order Operation Days and Seconds Fields |
P_WRKCTRMNTRPACEMAKERORDERS | COMPOSITE | Pacemaker Orders |
P_WRKCTROPSHIFTLOADAGGRGD | COMPOSITE | Load Distribution at shift level for operations |
P_WRKCTROPSHIFTLOADDISTR | COMPOSITE | Load Distribution at shift level for operations |
P_WRKCTRSHIFTWITHREQ | COMPOSITE | WorkCenter available Capacity with operations |
R_MAINTENANCEORDEROPERATIONTP | COMPOSITE | Maintenance Order Operation TP |
R_MAINTENANCEORDERTP | COMPOSITE | Maintenance Order TP |
C_ACCRSUBOBJITMWTHACCTASGT | CONSUMPTION | Accrual Subobject Item with Account Assignment |
C_ACCRSUBOBJITMWTHPERDCAMOUNTS | CONSUMPTION | Accrual Subobject Item with Periodic Amounts |
C_ACTIVEPROJECTCOSTSBYMONTHOVW | CONSUMPTION | Active Project Costs By Months |
C_ACTYTYPERCVGORDITM | CONSUMPTION | Receiving Orders Line Items |
C_APPROCESSFLOWJOURNALENTRYITM | CONSUMPTION | Journal Entry Document Item details for AP process flow |
C_ARPROCESSFLOWJOURNALENTRYDOC | CONSUMPTION | Journal Entry Document details for AR process flow |
C_ARUNANLYTSSUPDMNDOVWQRY | CONSUMPTION | Overview of Supply and Demand Query |
C_ARUNANLYTSTOTSUPQRY | CONSUMPTION | Total Supply of all Document Types Query |
C_ASSETASSIGNMENTTP | CONSUMPTION | Asset Assignment |
C_CACHEMRPMFGORDER | CONSUMPTION | MRP Manufacturing Orders |
C_CAPEVALPOOLEDCAPACITYOPS | CONSUMPTION | Workcenter Pooled Capacity Operations |
C_CAPEVALPPLINEOP | CONSUMPTION | Load all order operations for a capacity |
C_CHANGERECORDOBJPGPRODNORD | CONSUMPTION | Change Record Reference Object Page Prodn Ord |
C_CHFIEXPRODNORDCONFIGN | CONSUMPTION | Production Order Config |
C_CHGIMPACTNTWKDETS | CONSUMPTION | Network Order Details |
C_CHGIMPACTPRODNORDDETS | CONSUMPTION | Mfg BOM linked with Production orders |
C_CNSLDTNACCTGMASTERDATA | CONSUMPTION | Consolidation – Accounting Master Data |
C_CNSLDTNMASTERDATA | CONSUMPTION | Consolidation – Combined Master Data |
C_CNSLDTNORDERVH | CONSUMPTION | Order Value Help |
C_CONTRACTITEMACCTMNTR | CONSUMPTION | Purchase Contract Items by Account Assignment |
C_CONTROLLINGSETTLEMENTRULE | CONSUMPTION | Controlling Settlement Rule |
C_COPCCORDERANDITEMCOSTSCUBE | CONSUMPTION | CO PCC Order and Item Costs Cube |
C_COPRODUCTCOSTBYORDER1 | CONSUMPTION | CO Product Cost By Order |
C_COPRODUCTCOSTBYORDER2 | CONSUMPTION | CO Product Cost By Order |
C_COPRODUCTCOSTBYORDERANDITEM | CONSUMPTION | CO Product Cost By Orders and Items |
C_COSTATUSOBJECTACTIVESTATUS | CONSUMPTION | Status Object Active Status |
C_COSTCENTERBUDGET | CONSUMPTION | Cost Center Budget Report |
C_COSTCENTERPLANACTQ2001 | CONSUMPTION | Cost Center – Plan/Actual |
C_CTRLGSETTLEMENTDOCUMENT | CONSUMPTION | Display Settlement Documents |
C_CUSTOMER360_ISSUES | CONSUMPTION | Customer 360 Issues |
C_DEFECTRECORD | CONSUMPTION | Record Defect |
C_DEFECTRECORDAFFECTEDOBJECT | CONSUMPTION | Object Affected by Defect |
C_DSPDOCFLWANCHORDOCVH | CONSUMPTION | Anchor Document VH for DDF |
C_DSPDOCFLWMFGORDERVH | CONSUMPTION | Manufacturing Order VH for DDF |
C_DSPDOCFLWPRODNCONFATTRIB | CONSUMPTION | Prodn/Proc Ord Conf Attributes for DDF |
C_DSPDOCFLWPRODUCTIONATTRIB | CONSUMPTION | Production/Proc Order Attributes for DDF |
C_EARMARKEDFUNDSDOCITEMAPPRVL | CONSUMPTION | Earmarked Funds Approval, Line Items |
C_EARMARKEDFUNDSITEMA_APPRVL | CONSUMPTION | Earmarked Funds Item Approval, Account Assignments |
C_EARMARKEDFUNDSITEMD_APPRVL | CONSUMPTION | Earmarked Funds Item Approval, other items |
C_EARMARKEDFUNDSITEM_APPROVAL | CONSUMPTION | Earmarked Funds Item Approval, to be approved |
C_EARMARKEDFUNDS_OBJP | CONSUMPTION | Additional Selection – Earmarked Funds |
C_EMRKDFNDSITMFOROBJPWST | CONSUMPTION | Auxiliary Cosumption view for EF with Session Languate texts |
C_EVENTBASEDORDERKPI | CONSUMPTION | Consumption view of Event Bsed WIP Inspector |
C_EVENTBASEDWIPLOGHEADER | CONSUMPTION | Event-Based WIP Order Application Log Header |
C_FIXEDASSETASSGMTMAINTAIN | CONSUMPTION | Consumption View of Fixed Asset Maintain – Assignment Data |
C_FLDLOGSWORKORDERVH | CONSUMPTION | Work Order Value Help Non-Teco Orders |
C_FLXMTPLOBJVARPROJNTWKACTYTP | CONSUMPTION | Network Activity for Variant |
C_FUNCTIONALAREAPLANACTQ2801 | CONSUMPTION | Functional Area – Plan/Actual |
C_FXDASTASSGMTCURRENTMNTN | CONSUMPTION | Cons. View of Fixed Asset Edit – Assignment by Current Date |
C_GENERICPLANQ3001 | CONSUMPTION | Financial Plan Data |
C_INSPCHARCMLTPLRSLTREC | CONSUMPTION | Insp Charac for Mltpl Rslt Recording |
C_INSPLOTMLTPLRSLTREC | CONSUMPTION | Inspection Lots for Mltpl Rslt Recording |
C_INSPRESULTMLTPLRSLTREC | CONSUMPTION | Recorded Results for Mltpl Rslt Rec |
C_INSPRSLTVALUEMLTPLRSLTREC | CONSUMPTION | Single Results for Mltpl Rslt Recording |
C_INTERNALORDERPLANACTQ2101 | CONSUMPTION | Internal Order – Plan/Actual |
C_INTERNALORDERQ0001 | CONSUMPTION | Internal Order |
C_JOINTVENTUREORDERDATA | CONSUMPTION | Joint Venture Order Data |
C_JVAACTLBDGTFOROPLEXPENSESOVW | CONSUMPTION | Actual Cost & JV Budget for Opex Expense |
C_JVAACTUALBUDGETOVERVIEW | CONSUMPTION | Actual Cost and JV Budget Overview |
C_JVAACTUALCAPITALEXPNDTROVW | CONSUMPTION | Actual Cost & Capital Expenditure Ovw |
C_MAINTENANCEORDERWRKFLWINBOX | CONSUMPTION | Maintenance Order Workflow for My Inbox |
C_MAINTNOTIFFORSCREENINGQ | CONSUMPTION | Maintenance Notifications for Screening |
C_MAINTOBJBREAKDOWNQUERY | CONSUMPTION | Maintenance Object Breakdown Query |
C_MAINTOBJBREAKDOWNSIMPLQ | CONSUMPTION | Technical Object Breakdown (Simple) |
C_MAINTORDACTLPLNDCOSTQUERY | CONSUMPTION | Maint. Order Actual Planned Cost Query |
C_MAINTORDACTUALCOSTDATAQ | CONSUMPTION | Maintenance Order Actual Cost Data Query |
C_MAINTORDCOMPPURORDERITEM | CONSUMPTION | Purchase Orders for Plant Maintenance |
C_MAINTORDCOMPPURORDERQ | CONSUMPTION | Purchase Orders for Maintenance Orders |
C_MAINTORDCOMPPURREQITEM | CONSUMPTION | Purchase Requisitions for Plant Maintenance |
C_MAINTORDCOMPPURREQUISITIONQ | CONSUMPTION | Purchase Requisitions for Maintenance Orders |
C_MAINTORDCONFFORCREATETP | CONSUMPTION | Consumption View for Maintenance Order Confirmation Create |
C_MAINTORDCONFMESSAGETP | CONSUMPTION | Consumption View for Maintenance Order Confirmation Messages |
C_MAINTORDERACTLPLNDCOSTITEM | CONSUMPTION | Detailed Cost Analysis in Maint. Order |
C_MAINTORDERACTUALCOSTQ | CONSUMPTION | Maintenance Order Actual Cost Query |
C_MAINTORDERCOMPONENTTP | CONSUMPTION | Maintenance Order Component with Draft |
C_MAINTORDERCONFIRMATIONTP | CONSUMPTION | Maintenance Order Confirmation |
C_MAINTORDERFORACTION | CONSUMPTION | Maintenance Order Operation for Action |
C_MAINTORDERFORCOMPLETIONQ | CONSUMPTION | Orders for Completion |
C_MAINTORDERFORSAFETYINSIGHTS | CONSUMPTION | Maintenance Orders for Safety Insights |
C_MAINTORDEROPERATIONTP | CONSUMPTION | Maintenance Order Operation with Draft |
C_MAINTORDEROPFORACTION | CONSUMPTION | Maintenance Order Operation for Action |
C_MAINTORDEROUTPUTPARAMDETN | CONSUMPTION | Maintenance Order Output Management Parameter Determination |
C_MAINTORDERQUICKVW | CONSUMPTION | Maintenance Order Operation Quick View |
C_MAINTORDERSFORPLANNINGQ | CONSUMPTION | Maintenance Orders for Planning |
C_MAINTORDERSUBOPFORACTION | CONSUMPTION | Maintenance Order Operation for Action |
C_MAINTORDERTECHOBJQUERY | CONSUMPTION | Maint. Order Analysis Query w. Techn.Obj |
C_MAINTORDERTP | CONSUMPTION | Maintenance Order with Draft |
C_MAINTORDFORTECHOBJQUICKVW | CONSUMPTION | Maintenance Order based on Technical Object |
C_MAINTPLANOBJPGCALLOBJECT | CONSUMPTION | Call Objects in Maintenance Plan Object Page |
C_MALFUNCTIONREPORT | CONSUMPTION | Repair Malfunction Job List |
C_MALFUNCTIONREPORTINVLMNTS | CONSUMPTION | Malfunction Report User Involvements |
C_MALFUNCTIONREPORTWORKITEM | CONSUMPTION | Malfunction Report Work Items |
C_MANAGEOPERATIONS | CONSUMPTION | Production Operations |
C_MANAGEPRODUCTIONORDER | CONSUMPTION | Production Orders |
C_MARKETSEGMENTPLANACTQ2501 | CONSUMPTION | Market Segment – Plan/Actual |
C_MASTERPROJECTACTIVITY | CONSUMPTION | Commercial Project Activity Detail |
C_MASTERPROJECTBASICDATA | CONSUMPTION | Basic Data – Single Project Overview Screen |
C_MFGBUYOFFLIST | CONSUMPTION | Buy Off Cycle Inbox |
C_MFGBUYOFFMATERIALVH | CONSUMPTION | Buy Off Material Value Help |
C_MFGBUYOFFMATLSRLNMBRVH | CONSUMPTION | BuyOff Material Serial Number Value Help |
C_MFGBUYOFFVH | CONSUMPTION | Buyoff Value Help |
C_MFGEXECDEFECTRECORD | CONSUMPTION | View with UI attributes for defect |
C_MFGEXECEVENTHISTORY | CONSUMPTION | Manufacturing Execution Event History |
C_MFGORDACTLPLANTGTCOSTQRY | CONSUMPTION | Query view for MfgOrder PlanActTgt cost |
C_MFGORDCOMPEXCSCONSMPTQRY | CONSUMPTION | Mfg Order Operation Component Excess Consumption Query |
C_MFGORDERCONFIRMATION | CONSUMPTION | Manufacturing Order Confirmation |
C_MFGORDERDEFECTRECORD | CONSUMPTION | Consumption view for defect |
C_MFGORDEROBJPG | CONSUMPTION | Manufacturing Order Object Page |
C_MFGORDEROBJPGCOMP | CONSUMPTION | Manufacturing Order Object Page Com |
C_MFGORDEROBJPGCONTACTS | CONSUMPTION | Mfg Order Object Page Contacts |
C_MFGORDEROBJPGOPR | CONSUMPTION | Manufacturing Order Opr : Object Page |
C_MFGORDEROBJPGPRT | CONSUMPTION | PRT for Orders |
C_MFGORDEROBJPGSTATUS | CONSUMPTION | Manufacturing Order Operations Status |
C_MFGORDEROPERATIONFORCONF | CONSUMPTION | Mfg Order Operation for Confirmation |
C_MFGORDEROPERATIONHOLD | CONSUMPTION | Active Production Holds of a Production Order Operation |
C_MFGORDEROPERATIONMISSINGCOMP | CONSUMPTION | Mfg Order Operation Missing Component |
C_MFGORDEROPEXECDURNQRY | CONSUMPTION | Mfg Order Operation Execution Duration Query |
C_MFGORDEROPROBJPG | CONSUMPTION | Production Order Operations Object Page |
C_MFGORDEROPROBJPGCNF | CONSUMPTION | Mfg Order Operations Confirmation |
C_MFGORDERSFILEADTIMEQRY | CONSUMPTION | Mfg Order SFI Lead Time Query |
C_MFGORDERSHOPFLOORITEM | CONSUMPTION | Manufacturing Order Shop Floor Item |
C_MFGORDERWIPVARIANCEQUERY | CONSUMPTION | Query view for manufacturing order WIP / Variance |
C_MFGORDINSPCHARRESULTREC | CONSUMPTION | Order Result Record Details |
C_MFGORDOPCONFSCRAPREASONQ | CONSUMPTION | Mfg Order Operation Confirmation Scrap Reason Query |
C_MFGORDOPDETSFOROPACTYEXEC | CONSUMPTION | Manufacturing order operation details for OA execution |
C_MFGORDOPERATIONSCRAPQRY | CONSUMPTION | Manufacturing Order Operation Scrap Query |
C_MFGORDOPFORREWORKINSERTION | CONSUMPTION | Order operation for rework insertion |
C_MFGORDPLANINSPCHARINFO | CONSUMPTION | Order PIC Info |
C_MFGPROCGEXECOPERATION | CONSUMPTION | Manufacturing Order Operation |
C_MFGQUALIFNOPACTYASSGMT | CONSUMPTION | Qualification Assignment to OA |
C_MFGWORKINSTRUCTIONVERSION | CONSUMPTION | Work Instruction Consumption View |
C_MILESTONEBASICINFO | CONSUMPTION | Project Milestone Basic Information |
C_MILESTONEWITHVERSION | CONSUMPTION | Additional Selection – Milestone |
C_MNGPRODNORDERMFGORDER | CONSUMPTION | Manufacturing Order |
C_MNTRWRKCTROPERATIONPHASES | CONSUMPTION | CDS for phases in Process/Planned Orders |
C_MPEPRODNORDEROPERATIONPOVER | CONSUMPTION | Production Order Operations Popover |
C_MPEPRODNORDERPOVER | CONSUMPTION | Production Order Popover |
C_MPEWORKCENTERPOVER | CONSUMPTION | Work Center Popover |
C_MRPMAINTENANCEORDERCOMPONENT | CONSUMPTION | MRP Maintenance Order Component |
C_MRPMANUFACTURINGCOMPONENT | CONSUMPTION | MRP Manufacturing Component |
C_MRPMFGORDER | CONSUMPTION | MRP Manufacturing Order |
C_MRPORDERCOMPONENT | CONSUMPTION | Mfg Component and Maint Component |
C_MSTRPROJACTLCALMNTHCOSTQTY | CONSUMPTION | Commercial Proj Actual Cost Qty by Month |
C_MSTRPROJMYACTIVITIES | CONSUMPTION | Master Project My Activities |
C_MSTRPROJPRCOUNT | CONSUMPTION | Count of PRs or Master Project |
C_MSTRPROJPURORDITEM | CONSUMPTION | Consumption View for Master Project Purchase Order Item |
C_MSTRPROJPURREQITEM | CONSUMPTION | Master Project Purchase Requisition Item |
C_NETWORKACTIVITYBASICINFO | CONSUMPTION | Network Activity Basic Information |
C_NETWORKACTIVITYVALUEHELP | CONSUMPTION | Network Activity Value help |
C_NETWORKACTIVITYWITHVERSION | CONSUMPTION | Additional Selection – Network Activity |
C_NONREALTIMEPRODNCOSTORDERVH | CONSUMPTION | Non Real Time PCC Order Value Help |
C_NTWKACTIVITYGRAPHBASICDATA | CONSUMPTION | Basic Data of Network Activity for Graph |
C_NTWKACTIVITYGRAPHOVERVIEW | CONSUMPTION | Network Activity Graph Overview |
C_OBJPGMAINTNOTIFICATION | CONSUMPTION | Maintenance Notification |
C_OBJPGMAINTORDER | CONSUMPTION | Maintenance Order |
C_OBJPGMAINTORDERANDOPERATION | CONSUMPTION | Maintenance Order and Operation |
C_OBJPGMAINTORDERCONFIRMATION | CONSUMPTION | Maintenance Order Confirmation |
C_OBJPGMAINTORDEROPAGGRGDATA | CONSUMPTION | Maintenance Order Operation Aggregate Data |
C_OBJPGMAINTORDEROPERATION | CONSUMPTION | Maintenance Order Operation |
C_OBJPGMAINTORDEROPMATERIAL | CONSUMPTION | Maintenance Order Operation Material |
C_OBJPGMAINTORDERWTHDESC | CONSUMPTION | Maintenance Order with Description |
C_OBJPGMAINTORDOPPRODNRSCETOOL | CONSUMPTION | Maintenance Order Operation Production Resources/Tools |
C_OBJPGTECHNICALOBJECT | CONSUMPTION | Technical Object |
C_OPERATIONACTIVITYCOMPONENT | CONSUMPTION | Operation Activity Component |
C_OPERATIONACTIVITYPLNDMATLRET | CONSUMPTION | Operation Activity Component |
C_OPERATIONACTIVITYWORKLISTTP | CONSUMPTION | Personal Work Queue |
C_OPERATIONACTYCOMPONENTLIST | CONSUMPTION | Component assigned to Operation Activity |
C_OPERATIONACTYPRTASSIGNMENT | CONSUMPTION | Shop Floor Item At Operation Activity |
C_OPERATIONCOMPONENTS | CONSUMPTION | Components |
C_OPERATIONCONFIRMATIONS | CONSUMPTION | Operation Confirmations |
C_ORDERMASTERVH | CONSUMPTION | Order Master Value Help |
C_ORDEROPERATIONSCHEDULE | CONSUMPTION | Order Operation Schedule |
C_ORDERREALTIMEPRODUCTIONCOST | CONSUMPTION | Event-Based Production Costs |
C_ORDERWORKCENTERSCHEDULE | CONSUMPTION | Order Operation Work Center Schedule |
C_ORDHDRITMREALTIMEPRODNCOST | CONSUMPTION | Order Header and Item Real Time Production Cost |
C_OVERDUEMAINTENANCEORDERQ | CONSUMPTION | Overdue Maintenance Orders |
C_PCCORDERGENERALINFORMATION | CONSUMPTION | PCC Order General Information |
C_PPM_PRSTCMRPROJBYKEYFIGURES | CONSUMPTION | Projects By Key Figures |
C_PROCESSORDEROBJPG | CONSUMPTION | Process Order Object Page |
C_PROCESSORDEROBJPGOPR | CONSUMPTION | Manufacturing Order Opr : Object Page |
C_PROCGEXECOPACTYINSTCETP | CONSUMPTION | Processing Execution Operation Activity Instance |
C_PROCGEXECOPERATIONACTIVITY | CONSUMPTION | Operation Activity |
C_PROCGEXECOPERATIONACTYLIST | CONSUMPTION | Operation Activity List |
C_PROCORDERCONFOBJPG | CONSUMPTION | Process Order Confirmation Object Page |
C_PRODNORDERFORSAFETYINSIGHTS | CONSUMPTION | Production Orders for Safety Insights |
C_PRODNORDOPFORSAFETYINSIGHTS | CONSUMPTION | Production Order Operations for Safety Insights |
C_PRODNPLNGDEPDNTRESVNQUICKVW | CONSUMPTION | Dependent Requirement and Order Reservation Details |
C_PRODNPLNGPRODNORDQUICKVIEW | CONSUMPTION | Quick view data for Production Order |
C_PRODORDCONFOBJPG | CONSUMPTION | Production Order Confirmation Object Page |
C_PRODUCTCOSTBYORDERQUERY | CONSUMPTION | Production Cost By Order |
C_PRODUCTIONORDERHOLD | CONSUMPTION | Active Production Holds of Production Orders |
C_PROFITANDLOSSPLANACTQ2903 | CONSUMPTION | P&L – Plan/Actual |
C_PROFITCENTERPLANACTQ2701 | CONSUMPTION | Profit Center – Plan/Actual |
C_PROJBDGTCNSMPNDETSCOPILOT | CONSUMPTION | Project Cost Details |
C_PROJCOSTBYCOSTCOMP | CONSUMPTION | Project cost by Cost Component |
C_PROJCOSTBYCOSTCOMPCHART | CONSUMPTION | Project Costs by Cost Component |
C_PROJECTBUDGETCONSUMPTION | CONSUMPTION | Project Budget Consumption |
C_PROJECTBUDGETREPORT | CONSUMPTION | Project Budget Report |
C_PROJECTBUDGETREPORTLINEITEMS | CONSUMPTION | Project Budget Report – Line Items |
C_PROJECTCOSTLINEITEMS | CONSUMPTION | Project Cost Line Items |
C_PROJECTCOSTPREDICTION | CONSUMPTION | Project cost prediction |
C_PROJECTCOSTSTODATE | CONSUMPTION | Project Costs to Date |
C_PROJECTFINANCIALREPORT | CONSUMPTION | Actual/Planned LineItems for Project |
C_PROJECTFINANCIALSUMMARY | CONSUMPTION | Monitor Projects |
C_PROJECTNETWORKBASICINFO | CONSUMPTION | Project Network Basic Information |
C_PROJECTNETWORKGRAPHOVERVIEW | CONSUMPTION | Project Network Graph Overview |
C_PROJECTNETWORKRELATIONSHIP | CONSUMPTION | Project Network Relationship |
C_PROJECTNTWKVALUEHELP | CONSUMPTION | Value Help for Project Network |
C_PROJECTPLANACTQ2201 | CONSUMPTION | Project – Plan/Actual |
C_PROJECTPLANACTQ2203 | CONSUMPTION | Projects – Baseline/EAC/Ongoing |
C_PROJMATCOMPONENTWITHVERSION | CONSUMPTION | Additional SelectionΓÇôMaterial Component |
C_PROJMATLCOMPBASICINFO | CONSUMPTION | Project Material Component Basic Information |
C_PROJNETWORKWITHVERSION | CONSUMPTION | Additional Selection – Network |
C_PROJOVRLBUDGETCONSUMPTION | CONSUMPTION | Projects with Overall Budget Costs |
C_PROJPURDOCITEMS | CONSUMPTION | Purchasing Document Item Details |
C_PURCHASEORDERITEMACCTMNTR | CONSUMPTION | Purchase Order Items by Account Assignment |
C_PURREQITEMACCTMNTR | CONSUMPTION | PR Items by Account Assignment |
C_QM_INSPCHARINFO | CONSUMPTION | Characteristic details- More information |
C_QM_INSP_CHARACTERISTIC | CONSUMPTION | Inspection Characteristic |
C_REACCTGOBJECTPLANACTUALQ | CONSUMPTION | Real Estate Objects Plan and Actuals Q |
C_REALTIMEMFGORDERLOG | CONSUMPTION | Analyze Event-Based WIP and Variance Exceptions Log |
C_REALTIMEMFGORDERPOSTEDKPI | CONSUMPTION | Consumption view of Event-Based WIP and Variance Exceptions |
C_REALTIMEMFGORDERTOBEPOSTDKPI | CONSUMPTION | Consumption view of Event-Based WIP and Variance Exceptions |
C_REALTIMEORDCOSTCOMPGRPDETAIL | CONSUMPTION | Real-Time Order Costs Details – Cost Component Groups |
C_REALTIMEORDERACTIVESTATUS | CONSUMPTION | Event Based Order Active Status |
C_REALTIMEORDERCOST | CONSUMPTION | Event-Based Order Costs |
C_REALTIMEORDERCOSTDETAIL | CONSUMPTION | Real-Time Order Costs Detail |
C_REALTIMEORDERCOSTINFORMATION | CONSUMPTION | Order Cost Information |
C_REALTIMEORDERCOUNT | CONSUMPTION | Event Based Order Real Time KPI Count |
C_REALTIMEORDEREXCEPTIONSTATUS | CONSUMPTION | Real-Time Order Cost Exception Status |
C_REALTIMEORDEROUTPUTQUANTITY | CONSUMPTION | Real-Time Order Output Quantity |
C_REALTIMEPRODNCOSTCOMPGROUP | CONSUMPTION | Real Time Production Cost Component Groups |
C_REALTIMEWORKINPROCESS | CONSUMPTION | Event-Based Work in Process |
C_REALTMEWRKINPROCCHGDBYVH | CONSUMPTION | Real Time Work in Process Changed By Value Help |
C_REALTMEWRKINPROCCRTEDBYVH | CONSUMPTION | Real Time Work in Process Created By Value Help |
C_REALTMEWRKINPROCDAYHISTORY | CONSUMPTION | Real-Time Work In Process Last Days History |
C_REALTMEWRKINPROCMNTHHISTORY | CONSUMPTION | Real-Time Work In Process Last Months History |
C_REALTMEWRKINPROCPRODNORDVH | CONSUMPTION | Production Order Value Help |
C_REALTMEWRKINPROCRLTVDAYHIST | CONSUMPTION | Real-Time Work In Process Relative History in Last Days |
C_REEXASSIGNINTERNALORDER | CONSUMPTION | Internal Order |
C_RESOURCEOBJPGQUEUEOP | CONSUMPTION | Queuing operations for Resources |
C_RESOURCEOBJPGTODAYOP | CONSUMPTION | Todays Operations for Resources |
C_RSHDUEORDERBYPRIORITYKPI | CONSUMPTION | Due maintenance orders by priority |
C_RSHEAMUSERVARIANT | CONSUMPTION | Work Centers Assigned to Me |
C_RSHEDITWORKCENTERVH | CONSUMPTION | Value help for Work center change |
C_RSHMAINTASSETBOARD | CONSUMPTION | Maintenance Asset Board |
C_RSHMAINTASSETBOARDSHAPES | CONSUMPTION | Maintenance Asset Board shapes |
C_RSHMAINTOPERATIONASSIGNMENT | CONSUMPTION | Maintenance Order Operations |
C_RSHMAINTSCHEDFROZENOP | CONSUMPTION | Operations to be displayed in frozen schedule |
C_RSHMAINTSCHEDMISSINGWRKCTR | CONSUMPTION | Unassigned Work Centers in Schedule |
C_RSHMAINTSCHEDSMLTDOP | CONSUMPTION | Maint Scheduling Simulation Operations |
C_RSHMAINTSCHEDSMLTDOPRELSHP | CONSUMPTION | Operation Relationships for display on the Gantt Chart |
C_RSHMAINTSCHEDSMLTDORDANDOP | CONSUMPTION | Maint Scheduling Simulation Operations |
C_RSHOPERATIONACTIVEUSERSTATUS | CONSUMPTION | Maintenance order active status |
C_RSHOPERATIONDETAILS | CONSUMPTION | maintenance order operation long text |
C_RSHOPERATIONRELATIONSHIPS | CONSUMPTION | Operation Relationships for display on the Gantt Chart |
C_RSHOPERATIONS | CONSUMPTION | Maintenance Operations |
C_RSHOPERATIONVALIDATION | CONSUMPTION | Message for operation list |
C_RSHOPINMAINTSCHEDSIMULATION | CONSUMPTION | Operations in Maintenance Scheduling Simulation |
C_RSHOPUNASSIGNEDWORK | CONSUMPTION | Unassigned Work Overview |
C_RSHOPUNASSIGNEDWORKKPI | CONSUMPTION | Operations unassigned work KPI |
C_RSHORDERACTIVEUSERSTATUS | CONSUMPTION | Maintenance order active status |
C_RSHORDERDETAILS | CONSUMPTION | Maintenance order long text details |
C_RSHORDERPRIORITYVH | CONSUMPTION | Value Help for Order Priorities |
C_RSHORDERS | CONSUMPTION | Maintenance Orders |
C_RSHORDERSANDOPERATIONS | CONSUMPTION | Maintenance Orders and Operations |
C_RSHORDERSKPI | CONSUMPTION | Maintenance Orders KPIs |
C_RSHPASTORDERSKPI | CONSUMPTION | Past Maintenance orders |
C_RSHSMLTDWRKCTRUTILPERWEEK | CONSUMPTION | Utilization of Work Center per week basis |
C_RSHSMLTDWRKCTRUTILZNPERDAY | CONSUMPTION | Work Center Utilization Per Day |
C_RSHWCUTILIZATIONOVERVIEW | CONSUMPTION | Work Center Utilization |
C_RSHWRKCTRUTILIZATIONKPI | CONSUMPTION | Work Center Utilization Overview |
C_RUNOVERHEADMAINTENANCEORDER | CONSUMPTION | Overhead Calculation Maintenance Order |
C_RUNSETTLEMENTACTUALPROJECT | CONSUMPTION | Project list for actual settlement |
C_RUNSETTLMTACTLMAINTORDER | CONSUMPTION | Actual Settlement Maintenance Order |
C_RUNSETTLMTACTUALSTATISTIC | CONSUMPTION | Run Settlement – Actual |
C_SALESORDERFULFILLMENTISSUEQ | CONSUMPTION | SOFM Issue Query |
C_SCHAGRACCOUNT | CONSUMPTION | Scheduling Agreement Account Assignment |
C_SCHEDAGRMTACCT | CONSUMPTION | Account Assignment Consumption view |
C_SCHEDPRODNDSPTCHDOPS | CONSUMPTION | Dispatched operations |
C_SCHEDPRODNOPERATIONPHASES | CONSUMPTION | CDS for phases in Process/Planned orders |
C_SCHEDPRODNPEGGINGORDERDETS | CONSUMPTION | Schedule production pegging order details |
C_SCHEDPRODNPRODVERSDAY | CONSUMPTION | Production Versions In Day Bucket |
C_SCHEDPRODNPRODVERSSHIFT | CONSUMPTION | Production versions in shift bucket |
C_SCHEDPRODNPRODVERSWEEK | CONSUMPTION | Production Versions In Week Bucket |
C_SCHEDPRODNWORKLIST | CONSUMPTION | Worklist for Scheduling Productions |
C_SCHEDPRODNWRKCTRMNTROPS | CONSUMPTION | ERP and Live Cache Operations |
C_SCHEDPRODNWRKCTRSQNCVH | CONSUMPTION | Work Ctr Filter for dispatch by sequence |
C_SETTLEMENTACTUALSETTLEDVALUE | CONSUMPTION | Project list for actual settlement |
C_SETTLMTACTLSETLDVALPUBSEC | CONSUMPTION | Settled values with public sector fields |
C_SFIATOPACTYPLNDMATLRET | CONSUMPTION | Shop Floor Item At OA Planned Material Return |
C_SFIOPACTYINSPCHARCSAGGRG | CONSUMPTION | Inspection Characteristics for SFI OA |
C_SFIOPACTYINSTCEEQUIPACTVREGN | CONSUMPTION | Active Equipment Registration at OA Instance |
C_SFIOPACTYPRTASSIGNMENT | CONSUMPTION | Shop Floor Item At Operation Activity |
C_SFIPLANINSPCHARINFO | CONSUMPTION | SFI Plan Insp Char Information |
C_SFIPLANINSPCHARRESULTREC | CONSUMPTION | Result recording details of Inspection Characteristics |
C_SHOPFLOORITEM | CONSUMPTION | Serial Number |
C_SHOPFLOORITEMATOPACTY | CONSUMPTION | Shop Floor Item At Operation Activity |
C_SHOPFLOORITEMATOPACTYCOMP | CONSUMPTION | Shop Floor Item At OA Component |
C_SHOPFLOORITEMHOLD | CONSUMPTION | Serial Number Hold |
C_SHOPFLOORITEMOPERATION | CONSUMPTION | Shop Floor Item Operation |
C_SHOPFLOORITEMWHEREUSEDLIST | CONSUMPTION | Shop Floor Item Assembly Parent |
C_SHOPFLOORITMOPACTYRESULTRECG | CONSUMPTION | SFI Operation Activity Data Collection |
C_SLSDOCFLFLLMNTANALYZER | CONSUMPTION | Track Sales Orders |
C_SLSDOCFLFMTISSUE | CONSUMPTION | Sales Order Fulfillment Issues |
C_SLSDOCFLFMTMFGORDER | CONSUMPTION | Sales Doc Fulfillment: Mfg Order |
C_SLSDOCFLFMTMFGORDERCONTACTS | CONSUMPTION | Sales Doc Fulfillment: MFG Order Contacts |
C_SLSDOCFLFMTPROCHIERARCHY | CONSUMPTION | Sales Doc Fulfillment: Hierarchy |
C_SLSORDFLFMTINSUPMFGCONTACTQ | CONSUMPTION | SOFM Sales Order Fulfillment InSupply Manufact.Contact Query |
C_SLSORDFLFMTINSUPPLYCONTACTQ | CONSUMPTION | SOFM Sales Order Fulfillment In Supply Contact Query |
C_SLSORDFLFMTMFGORDERQ | CONSUMPTION | SOFM Manufacturing Order Query |
C_SLSORDFLFMTPROCESSFLOWQ | CONSUMPTION | SOFM Process Flow Query |
C_SLSORDPROCFLOW | CONSUMPTION | Sales Order Process Flow Query |
C_SOFULFILLMENTMONITOR_F2200 | CONSUMPTION | Categorize Sales Orders |
C_SRVCCONTRFINANCECARD | CONSUMPTION | Srvc. Contrct Card -TCV & Profit margin |
C_SRVCCONTRFINQUERY_2 | CONSUMPTION | Finance Data in Service Contract ΓÇô Query |
C_SRVCCONTRINTORDERQUERY | CONSUMPTION | Internal Order of Srvc Contract ΓÇô Query |
C_SSPLOGISTICSORDERVH | CONSUMPTION | Logistics Order Value Help for SSP PR |
C_SSPNETWORKACTIVITYVH | CONSUMPTION | Purchasing Network Activity Value Help |
C_SSPPROJECTNETWORKVH | CONSUMPTION | Network Value Help for local and hub scenario |
C_STATISTICALKEYFIGUREITEM | CONSUMPTION | Statistical Key Figure Items |
C_STATKEYFIGALLOBJECT | CONSUMPTION | Assignments to All Objects |
C_STATKEYFIGCOSTCENTER | CONSUMPTION | Cost Centers |
C_STATKEYFIGVALUEASSIGNMENT | CONSUMPTION | Value Assignments |
C_STSTCLKEYFIGUREVALUEITEM | CONSUMPTION | Statistical Key Figure Value Item |
C_STSTCLKEYFIGVALUEACTIVEITEM | CONSUMPTION | Statistical Key Figure Value Item |
C_SUPDMNDALLDOCFILTER | CONSUMPTION | Filter View for Supply Demand Overview for All Documents |
C_SUPDMNDALLDOCOVWQRY | CONSUMPTION | Query View for Overview of Supply and Demand |
C_SUPDMNDALLDOCPRODNORDASSGQ | CONSUMPTION | Query View for Production Order Assignment Details |
C_SUPDMNDALLDOCPRODNORDQ | CONSUMPTION | Query View for Production Order Details |
C_SUPDMNDALLDOCTOTSUPQRY | CONSUMPTION | Query View for Total Supply of All Document Types |
C_SUPDMNDOVWPGFLTR | CONSUMPTION | Supply and Demand Cockpit Filter |
C_SUPDMNDOVWPGTOTSUPQ | CONSUMPTION | Consumption View for Total Supply of all Sources |
C_TECHOBJFLATVH | CONSUMPTION | Value help for Technical Object details |
C_TECHOBJHIERVH | CONSUMPTION | Value Help for Hierarchical value help |
C_TECHOBJMAINTENANCEITEM | CONSUMPTION | Maintenance Items for Technical Object |
C_TECHOBJMAINTENANCEORDER | CONSUMPTION | Maintenance Orders for Technical Object |
C_TECHOBJMAINTNOTIFICATION | CONSUMPTION | Maintenance Notifications for Technical Object |
C_TRACKTOOLUSAGEOPACTYEQUIP | CONSUMPTION | List of OAs for Equipment |
C_TRACKTOOLUSAGETP | CONSUMPTION | Track Tool Usage |
C_USERDEFAULTSELECTIONPARAM | CONSUMPTION | User Default Selection Paramts for Excel |
C_USERDEFAULTSETTINGITEM | CONSUMPTION | Consumption view for item |
C_WBSORDERS | CONSUMPTION | WBS Element Order Details |
C_WHEREUSDPRFTCTRORDER | CONSUMPTION | Where-Used List – Profit Centers – Order |
C_WORKCENTERCAPORDERPERBUCKET | CONSUMPTION | Load Distribution at shift level for operations |
C_WORKCENTERCAPPERBUCKET | CONSUMPTION | Capacity Evaluation for Workcenter at Shift Level |
C_WORKCENTEROBJPGOPRSTATUS | CONSUMPTION | Work Center Object Page Queueing Operations Count |
C_WORKCENTEROBJPGTDYNPRNO | CONSUMPTION | Work Center Object Todays Page Operation Count |
C_WORKCENTERPLANACTLTGTCOST | CONSUMPTION | Production Cost By Work Center/Operation. |
C_WORKCENTERPRODCOSTQUERY | CONSUMPTION | Production Cost By Work Center |
C_WRKCNTROBJPGQUEUEOP | CONSUMPTION | Work Center Queuing Operation |
C_WRKCNTROBJPGTODAYOP | CONSUMPTION | Work Center Object Page Todays Operation |
C_WRKCTRMNTROPERATIONRELATION | CONSUMPTION | Relationship between Operations |
C_WRKCTRMNTROPERATIONSEQUENCE | CONSUMPTION | Sequence of Order Operations |
C_WRKCTRMNTRORDERDETAILS | CONSUMPTION | Work Center Monitor Order Details |
C_WRKCTRMNTRORDEROPERATIONS | CONSUMPTION | Work Center Monitor Order Operations |
C_WRKCTRMNTRRESCHEDULE | CONSUMPTION | Monitor Work Center Reschedule |
C_WRKCTRMNTRRESCHEDULEOPS | CONSUMPTION | Work Center Reschedule Operations |
P_ACTYTYPERCVGORDITM | CONSUMPTION | Receiving Orderds Line Items – without DCL |
P_ARPROCESSFLOWJOURNALENTRYDOC | CONSUMPTION | Journal Entry Document details for AR process flow |
P_CALENDARDATEFORPROJECT | CONSUMPTION | Private View For Calendar Date |
P_CTRLGSETTLEMENTDOCUMENT | CONSUMPTION | Controlling Settlement Document |
P_CTRLGSETTLMTDOCPROJMAXDATE | CONSUMPTION | Possible senders for settled object |
P_CTRLGSETTLMTLASTDOCPROJ | CONSUMPTION | Last settlement document for Project |
P_CTRLGSETTLMTPROJLASTDOCNUMBR | CONSUMPTION | Possible senders for settled object |
P_DEMANDDRIVENOPAGGR | CONSUMPTION | Latest Operation in Expedite |
P_DSPDOCFLWPRODNCONFCOUNT | CONSUMPTION | Prodn Ord/Proc Conf Attributes for DDF |
P_HISTMATERIALMALFUNCMANAGE | CONSUMPTION | Historic Materials |
P_MAINTBACKLOGNONSTKCOMPUNION | CONSUMPTION | Maintenance Backlog Non Stock Component Union |
P_MAINTORDCONFORDERSTATUS | CONSUMPTION | Order Status for Maintenance Order Confirmation |
P_MAINTORDERCOMPLETIONSTATUS | CONSUMPTION | Maintenance Order Status |
P_MAINTORDNMBROFOPENSERVICES | CONSUMPTION | Maintenance Order Number of Open Services |
P_MAINTORDNONSTKCOMPFRMPURREQN | CONSUMPTION | MaintOrder Component Direct Procurement From Purch. Req. |
P_MAINTORDNONSTKCOMPFROMPURORD | CONSUMPTION | PMaintOrder Component Direct Procurement From Purch. Order |
P_MAINTPLNGBCKTORDER | CONSUMPTION | Auxiliary View for Orders in Planning Bucket |
P_MAINTPLNGBCKTORDERCOMPONENT | CONSUMPTION | Auxiliary View for Order Components in Planning Bucket |
P_MAINTPLNGBCKTRESOURCE | CONSUMPTION | Auxiliary View for Resources in Planning Bucket |
P_MANAGEOPERATIONS | CONSUMPTION | Production Operations |
P_MFGCOMPSMISSAGGR | CONSUMPTION | Group the ComponentIsMissing flags for all components |
P_MFGEXECEVENTHISTORYCNSMPN | CONSUMPTION | Manufacturing Execution Event History |
P_MFGORDCOMPMISSAGGR | CONSUMPTION | Group the ComponentsIsMissing flags for all comps for Order |
P_MFGORDERCUSTOM | CONSUMPTION | Manufacturing Order |
P_MFGORDERFIRSTOPERATION | CONSUMPTION | Manufacturing Order First Operation |
P_MFGORDERHEADERHOLD | CONSUMPTION | Material and order holds of a Manufacturing Order |
P_MFGORDERHEADERHOLDUNIONBASIC | CONSUMPTION | All holds of a Manufacturing Order (that apply to any node) |
P_MFGORDEROPDLYBSCMAINSTSINFO | CONSUMPTION | Mfg Order Operation Delay Basic Data with Main Status |
P_MFGORDEROPERATIONCOMPMATL | CONSUMPTION | Manufacturing Order Operation Component Material |
P_MFGORDEROPERATIONFORCONF | CONSUMPTION | Mfg Order Operation for Confirmation |
P_MFGORDEROPERATIONISONHOLD | CONSUMPTION | Production Order Operation is on hold |
P_MFGORDEROPERHOLDUNIONBASIC | CONSUMPTION | Holds of a Mfg Order that apply on header or operation |
P_MFGORDEROPERNUMBEROFHOLDS | CONSUMPTION | Number of active Prodn Holds of a Production Order Operation |
P_MFGORDOPACTYPLANINSPCHAR | CONSUMPTION | Planned Inspection Characteristics for OA of Order |
P_MFGPROCGEXECOPERATION | CONSUMPTION | PEO Manufacturing Order Operation |
P_MPEPRODNORDEROPERATIONPOVER | CONSUMPTION | Production Order Operation popover |
P_MPEPRODNORDERPOVER | CONSUMPTION | Production Order Popover |
P_MPEPRODNORDITMDVTNDURN | CONSUMPTION | Production Order Item Deviation Duration |
P_MPEPRODNORDMATLISMISSING | CONSUMPTION | Production Order Missing Material |
P_MPEPRODNORDMISSINGMATL | CONSUMPTION | Production Order Missing Material |
P_MPEPRODNORDOPERMISSINGMATL | CONSUMPTION | Production Order Operation Missing Material, private View |
P_MPEPRODNORDOPERMISSMATCOUNT | CONSUMPTION | Production Order Operation Missing Mat Count, private View |
P_MPEPRODNORDOPERSTATUSTEXT | CONSUMPTION | Production Order Operation Status Text, private view |
P_MPEPRODNORDOPMATLISMISSING | CONSUMPTION | Production Order Operation Missing Material |
P_MPE_WORKCENTERMATERIAL | CONSUMPTION | Material for work center |
P_MPE_WORKCENTEROPERSTATUS | CONSUMPTION | Status of operations in a work center |
P_OBJPGMAINTORDERANDOPERATION | CONSUMPTION | Union of Operation and Sub Operation |
P_OPACTYCOMPONENTASSIGNMENT | CONSUMPTION | Operation Activity Instance Component Assignment |
P_OPERATIONACTIVITYCOMPONENT | CONSUMPTION | OA Planned Component, Incl. Unplanned Assemblies |
P_OPERATIONACTIVITYCOMPUNION | CONSUMPTION | OA Planned Component, Incl. Unplanned Assemblies |
P_OPERATIONACTIVITYPLNDMATLRET | CONSUMPTION | Operation Activity Planned Material Return |
P_OPERATIONACTYPLNDMATLRETQTS | CONSUMPTION | Operation Activity Planned Material Return with Quantities |
P_OPERATIONACTYPRTASSIGNMENT | CONSUMPTION | Shop Floor Item At Operation Activity |
P_OPERATIONSEQUENCE | CONSUMPTION | View to retrieve the sequence category branch to and from |
P_OPERCOMPMISSINGQTY | CONSUMPTION | Operation Component Missing Quantity |
P_ORDERQTYISSUE | CONSUMPTION | Order Quantity Issue Calculation |
P_ORDFIRSTOPER | CONSUMPTION | Order First Operation Details |
P_ORDLATESTOPER | CONSUMPTION | Order Latest Operation Details |
P_PRODNHOLDAFFCDSFIATOPACTY | CONSUMPTION | SFI at an OA affected when a production hold was applied |
P_PRODUCTIONORDERHOLD | CONSUMPTION | Manufacturing Execution Event History |
P_PROJBDGTCNSMPNDETSCOPILOT | CONSUMPTION | Project Cost Details |
P_PROJCOSTBYCOSTCOMP | CONSUMPTION | Project Costs By Cost Components |
P_PROJCOSTSWITHCALCDMNTH | CONSUMPTION | Project Costs With Calculated Months |
P_PROJECTCOSTSBYFISCALYEAR | CONSUMPTION | Project Costs by Fiscal Year |
P_PROJECTCOSTSBYFISCALYEARPERD | CONSUMPTION | Project Costs by Fiscal Year Period |
P_PROJECTCOSTSINGLOBALCURRENCY | CONSUMPTION | Project Costs in Global Currency |
P_PROJECTCOSTSTODATE | CONSUMPTION | Project Costs to Date |
P_PROJECTPREDICTSUMMRYMAIN | CONSUMPTION | Project Prediction Summary Main |
P_PROJECTPRIORITYCODEVISLFLTR | CONSUMPTION | Project Priority Code Visual Filter |
P_PURREQITEMACCTMNTR | CONSUMPTION | PR Items by Account Assignment |
P_RSHCAPACITYINOPTIMEFRAME | CONSUMPTION | Capacity of work center in the operation time frame |
P_RSHCAPINEXOPSPERIODFORSCHED | CONSUMPTION | Capacity of work center in the operation time frame |
P_RSHEXMUDAYOPSFORSCHED | CONSUMPTION | Private view for opeartion time in seconds |
P_RSHEXMUDAYOPSFORSCHEDCAPPRDY | CONSUMPTION | Operation Consumption View |
P_RSHEXMUDAYOPSFORSCHEDCAPPRWD | CONSUMPTION | Operation Capacity Per Work Day |
P_RSHEXMUDAYOPSFORSCHEDTTLCAP | CONSUMPTION | Operation Total Capacity |
P_RSHEXOPSFORSCHEDULING | CONSUMPTION | In process and Dispatched operations for scheduling |
P_RSHEXOPSINSECSFORSCHED | CONSUMPTION | Operation work details for consumption calculation |
P_RSHEXOPSPERIOD2FORSCHED | CONSUMPTION | Return time interval spanned by operations of maint orders |
P_RSHEXOPSPERIOD3FORSCHED | CONSUMPTION | Return date range spanned by operations of maint orders |
P_RSHEXOPSPERIODFORSCHED | CONSUMPTION | Return time interval spanned by operations |
P_RSHMAINTASSETBOARD | CONSUMPTION | Maintenance Asset Board |
P_RSHMAINTASSETBOARDSHAPES | CONSUMPTION | Maintenance asset board shapes |
P_RSHMAINTORDOP1STSCHEDCREATED | CONSUMPTION | First Schedule created for Maint.Op. |
P_RSHMAINTORDOP1STSCHEDSTARTED | CONSUMPTION | First Schedule started for the Maintenance Order Operation |
P_RSHMAINTORDOPFIRSTMAINTSCHED | CONSUMPTION | Maintenance Operations with First Maintenance Schedule |
P_RSHMAINTSCHEDOPERATIONS | CONSUMPTION | Operations from frozen schedule |
P_RSHMNTSCHDORDOPWOEXPLREL | CONSUMPTION | Schedule Operations w/o explicit rel |
P_RSHOPERATIONCAPACITYPERDAY | CONSUMPTION | Operation Consumption View |
P_RSHOPERATIONCAPACITYPRWRKDAY | CONSUMPTION | Operation Capacity Per Work Day |
P_RSHOPERATIONDURATIONINSECOND | CONSUMPTION | Maintenance Operations with Durations in Seconds |
P_RSHOPERATIONEXPLICITRELATION | CONSUMPTION | Operations with explicit Relations |
P_RSHOPERATIONIMPLICITRELATION | CONSUMPTION | Operations with implicit Relations |
P_RSHOPERATIONRELATIONSHIPS | CONSUMPTION | Operations with Relationships |
P_RSHOPERATIONS | CONSUMPTION | Maintenance Operations |
P_RSHOPERATIONSBASE | CONSUMPTION | Maintenance Operations Base Details |
P_RSHOPERATIONSFORKPI | CONSUMPTION | Operations and Sub Operations for overview page |
P_RSHOPERATIONSFORUTILIZATION | CONSUMPTION | Operations and Sub Operations for utilization |
P_RSHOPERATIONSWOEXPLICITRELAT | CONSUMPTION | Operations without explicit Relations |
P_RSHOPERATIONTIMEFRAME | CONSUMPTION | Return time interval spanned by operations |
P_RSHOPERATIONTIMEINSECONDS | CONSUMPTION | Private view for opeartion time in seconds |
P_RSHOPERATIONTOTALCAPACITY | CONSUMPTION | Operation Total Capacity |
P_RSHOPERATIONWITHCAPACITY | CONSUMPTION | Operation and Capacity View |
P_RSHOPERATIONWORKDETAILS | CONSUMPTION | Operation work details for consumption calculation |
P_RSHOPERATIONWORKPERDAY | CONSUMPTION | Operation Work per Day |
P_RSHOPERWORKFORSCHEDULING | CONSUMPTION | Operation work for scheduling |
P_RSHOPINMAINTSCHEDSIMULATION | CONSUMPTION | Operations in Maintenance Schedule |
P_RSHORDEROPERATIONDATERANGE | CONSUMPTION | Return date range spanned by operations of maint orders |
P_RSHORDEROPERATIONTIMEFRAME | CONSUMPTION | Return time interval spanned by operations of maint orders |
P_RSHORDERPROCESSINGSTATUS | CONSUMPTION | Processing Status for Orders |
P_RSHSMLTDOPCAPACITY | CONSUMPTION | Simulated Operation Capacity |
P_RSHSMLTDOPCAPACITYPERWEEK | CONSUMPTION | Work distributed per day |
P_RSHSMLTDOPCONSUMPTION | CONSUMPTION | Simulated Operation Duration based on Work Center Capacity |
P_RSHSMLTDOPINSECONDS | CONSUMPTION | Consumption considering simulated operation |
P_RSHSMLTDWRKCTRUTILPERWEEK | CONSUMPTION | Utilization Per Week |
P_RSHSMLTDWRKCTRUTILZNPERDAY | CONSUMPTION | Utilization per day |
P_RSHWCCONSUMPTIONPERWEEK | CONSUMPTION | Utilization percentage values for next 4 weeks |
P_RSHWCUTILIZATION | CONSUMPTION | Operations |
P_RSHWCUTILIZATIONPERWEEK | CONSUMPTION | Operations |
P_RSHWRKCTRUSEDINPLNGSCHEDULE | CONSUMPTION | Work Centers used in Schedules |
P_SCHEDPRODNWRKCTRMNTROPS | CONSUMPTION | Schedule Overview Operations |
P_SETTLEMENTACTUALSETTLEDVALUE | CONSUMPTION | Possible senders for settled object |
P_SETTLEMENTSENDER | CONSUMPTION | Possible senders for settled object |
P_SETTLMTSNDRDOC | CONSUMPTION | Possible senders for settled object |
P_SFIATOPACTYPLNDMATLRET | CONSUMPTION | Shop Floor Item At OA Planned Material Return |
P_SFIATOPACTYPLNDMATLRETQTS | CONSUMPTION | SFI at OA Planned Material Return with Quantities |
P_SFIOPACTYPLANINSPCHAR | CONSUMPTION | Operation Activity Based PlannedInspChar |
P_SHOPFLOORITEMATOPACTYCOMP | CONSUMPTION | SFI Planned Component at OA, Incl. Unplanned Assemblies |
P_SHOPFLOORITEMATOPACTYCOMP2 | CONSUMPTION | SFI Planned Component at OA, Incl. Unplanned Assemblies |
P_SLSDOCFLFLLMNTANALYZER1 | CONSUMPTION | SOFA Main List Step 1 |
P_SLSDOCFLFLLMNTANALYZER2 | CONSUMPTION | SOFA Main List Step 2 |
P_SLSDOCFLFLLMNTANALYZER3 | CONSUMPTION | SOFA Main List Step 3 |
P_SLSDOCFLFLLMNTANALYZER4 | CONSUMPTION | SOFA Main List Step 4 |
P_SLSDOCFLFLLMNTANALYZERISS1 | CONSUMPTION | SOFA Main List: Issues Step 1 |
P_SLSDOCFLFLLMNTANALYZERISS2 | CONSUMPTION | SOFA Main List: Issues Step 2 |
P_SLSORDFLFMTPROCHIERNODE1 | CONSUMPTION | Sales Order Fulfillment Process Hierarchy Node 1 |
P_SLSORDFLFMTPROCHIERNODE2 | CONSUMPTION | Sales Order Fulfillment Process Hierarchy Node 2 |
P_SLSORDFLFMTSUPPROCSQNC | CONSUMPTION | Sales Order Fulfillment Supply Process Sequence |
P_SLSORDPROCFLOW11 | CONSUMPTION | Sales Order Process Flow: Level +1 Manufacturing Orders |
P_STATKEYFIGALLOBJECT | CONSUMPTION | SKF Where Used All Objects |
P_STATKEYFIGCOSTCENTER | CONSUMPTION | SKF Where Used Cost Centers |
P_WHEREUSDPRFTCTRORDER | CONSUMPTION | Where-Used List – Profit Centers – Order |
P_WRKCTRMNTRCALCFIELDS | CONSUMPTION | WorkCenter Monitor Calculations |
P_WRKCTRMNTRPACEMAKEROPS | CONSUMPTION | Pacemaker Operations |
E_LOGISTICSORDER | EXTENSION | Logistics Order – Extension Include View |
E_PRODUCTCOSTCTRLGORDER | EXTENSION | Include View for PCC Order |