Sunday, May 19, 2024

SAP Table AUFK – Order master data

AUFK is a standard SAP table in SAP ERP (or) S/4HANA which stores Order master data data. There are total 131 fields in AUFK table.This blog post provides key technical details of SAP table AUFK, including its availability across SAP S/4HANA versions and the list of CDS views for AUFK table in SAP.

SAP HANA Table Type Column Store
Buffering Permission Buffering not allowed
Buffering Type No buffering
Package Cost Accounting, Orders (KAUF)
Technical Component Overhead Cost Orders (CO-OM-OPA)

SAP AUFK Table Fields

The following is the list of fields that are available in SAP AUFK table. The key fields of the table are highlighted in color.

Field Description Data Element Domain Check Table Data Type
MANDT Client MANDT MANDT T000 CLNT (3)
AUFNR Order Number AUFNR AUFNR CHAR (12)
AUART Order Type AUFART AUFART T003O CHAR (4)
AUTYP Order category AUFTYP AUFTYP NUMC (2)
REFNR Reference Order Number AUFREFNR AUFNR AUFK CHAR (12)
ERNAM Entered By AUFERFNAM USNAM CHAR (12)
ERDAT Created On AUFERFDAT DATUM DATS (8)
AENAM Last Changed By AUFAENAM USNAM CHAR (12)
AEDAT Change Date for Order Master AUFAEDAT DATUM DATS (8)
KTEXT Description AUFTEXT TEXT40 CHAR (40)
LTEXT Long Text Exists AUFLTEXT XFELD CHAR (1)
BUKRS Company Code BUKRS BUKRS T001 CHAR (4)
WERKS Plant WERKS_D WERKS T001W CHAR (4)
GSBER Business Area GSBER GSBER TGSB CHAR (4)
KOKRS Controlling Area KOKRS CACCD TKA01 CHAR (4)
CCKEY Cost Collector Key CCKEY CCKEY CHAR (23)
KOSTV Responsible cost center AUFKOSTV KOSTL CSKS CHAR (10)
STORT Location AUFSTORT AP_STAND T499S CHAR (10)
SOWRK Location Plant AUFSOWRK WERKS T001W CHAR (4)
ASTKZ Identifier for Statistical Order AUFSTKZ XFELD CHAR (1)
WAERS Order Currency AUFWAERS WAERS TCURC CUKY (5)
ASTNR Order Status AUFASTNR AUFSTNR NUMC (2)
STDAT Date of Last Status Change AUFSTDAT DATUM DATS (8)
ESTNR Status Reached so Far AUFESTNR AUFSTNR TKO03 NUMC (2)
PHAS0 Phase “Order Created” AUFPHAS0 XFELD CHAR (1)
PHAS1 Phase “Order Released” AUFPHAS1 XFELD CHAR (1)
PHAS2 Phase “Order Completed” AUFPHAS2 XFELD CHAR (1)
PHAS3 Phase “Order Closed” AUFPHAS3 XFELD CHAR (1)
PDAT1 Planned release date AUFPDAT1 DATUM DATS (8)
PDAT2 Planned completion date AUFPDAT2 DATUM DATS (8)
PDAT3 Planned closing date AUFPDAT3 DATUM DATS (8)
IDAT1 Release Date AUFIDAT1 DATUM DATS (8)
IDAT2 Technical Completion Date AUFIDAT2 DATUM DATS (8)
IDAT3 Close Date AUFIDAT3 DATUM DATS (8)
OBJID Object ID CCOBJID CHAR1 CHAR (1)
VOGRP Group of Disallowed Transactions AUFSPSET VOGRP TKAVG CHAR (4)
LOEKZ Deletion Flag AUFLOEKZ XFELD CHAR (1)
PLGKZ Identifier for Planning with Line Items PLGKZ XFELD CHAR (1)
KVEWE Usage of the condition table KVEWE KVEWE T681V CHAR (1)
KAPPL Application KAPPL KAPPL T681A CHAR (2)
KALSM Costing Sheet AUFKALSM KALSM T683 CHAR (6)
ZSCHL Overhead key AUFZSCHL CHAR6 CHAR (6)
ABKRS Processing group AUFABKRS AKREIS TKO08 NUMC (2)
KSTAR Settlement Cost Element AUFKSTAR KSTAR CSKB CHAR (10)
KOSTL Cost Center for Basic Settlement AUFKOSTL KOSTL CSKS CHAR (10)
SAKNR G/L Account for Basic Settlement AUFSAKNR SAKNR SKB1 CHAR (10)
SETNM Allocation Set AUFSETNM SETNR CHAR (12)
CYCLE Cost center to which costs are actually posted ST_KOSTL KOSTL CSKS CHAR (10)
SDATE Start Date SDATE SDATE DATS (8)
SEQNR Sequence Number AUFSEQNR SQNR NUMC (4)
USER0 Applicant AUFUSER0 AUFUSER0 CHAR (20)
USER1 Applicant’s telephone number AUFUSER1 AUFUSER1 CHAR (20)
USER2 Person Responsible AUFUSER2 AUFUSER2 CHAR (20)
USER3 Telephone number of person in charge AUFUSER3 AUFUSER3 CHAR (20)
USER4 Estimated total costs of order AUFUSER4 AUFUSER4 CURR (11)
USER5 Application date AUFUSER5 AUFUSER5 DATS (8)
USER6 Department AUFUSER6 AUFUSER6 CHAR (15)
USER7 Work Start AUFUSER7 AUFUSER7 DATS (8)
USER8 End of Work AUFUSER8 AUFUSER8 DATS (8)
USER9 Identifier for work permit issued AUFUSER9 AUFUSER9 CHAR (1)
OBJNR Object number J_OBJNR J_OBJNR ONR00 CHAR (22)
PRCTR Profit Center PRCTR PRCTR CEPC CHAR (10)
PSPEL Work breakdown structure element (WBS element) PS_PSP_ELE PS_POSNR PRPS NUMC (8)
AWSLS Variance Key AWSLS AWSLS TKV01 CHAR (6)
ABGSL Results Analysis Key ABGR_SCHL ABGR_SCHL TKKAA CHAR (6)
EB_POST Event-Based Posting FCO_EB_POST KKA_YES_NO CHAR (1)
TXJCD Tax Jurisdiction TXJCD TXJCD TTXJ CHAR (15)
FUNC_AREA Functional Area FKBER FKBER TFKB CHAR (16)
SCOPE Object Class SCOPE_CV SCOPE_CV CHAR (2)
PLINT Indicator for Integrated Planning PLINT XFELD CHAR (1)
KDAUF Sales Order Number KDAUF VBELN CHAR (10)
KDPOS Item number in Sales Order KDPOS NUM06 NUMC (6)
AUFEX External order number AUFEX AUFEX CHAR (20)
IVPRO Investment Measure Profile IM_PROFIL IM_PROFIL TAPRF CHAR (6)
LOGSYSTEM Logical System LOGSYSTEM LOGSYS TBDLS CHAR (10)
FLG_MLTPS Order Has Multiple Items CO_MLTPS KREUZ CHAR (1)
ABUKR Requesting company code IM_ABUKRS BUKRS T001 CHAR (4)
AKSTL Requesting cost center PS_AKSTL KOSTL CSKS CHAR (10)
SIZECL Scale of investment objects IM_SIZECL SIZECL TAIF5 CHAR (2)
IZWEK Reason for Investment IZWEK IZWEK T087I CHAR (2)
UMWKZ Reason for Environmental Investment AM_UMWKZ AM_UMWKZ T087K CHAR (5)
KSTEMPF Indicator: Direct cost collector CO_KSTEMPF CO_KSTEMPF CHAR (1)
ZSCHM Interest Profile for Project/Order Interest Calculation PS_ZSCHM PS_ZSCHM TPI01 CHAR (7)
PKOSA Cost Collector for Production Process PKOSA_D AUFNR CHAR (12)
ANFAUFNR Requesting order AUFANFNR AUFNR AUFK CHAR (12)
PROCNR Production Process CKML_F_PROCNR CK_KALNR NUMC (12)
PROTY Process Category (Procurement/Consumption) CKML_PROZESS_TYP CKML_PROZESS_TYP CHAR (4)
RSORD Refurbishment order indicator (PM) RSORD XFELD CHAR (1)
BEMOT Accounting Indicator BEMOT BEMOT TBMOT CHAR (2)
ADRNRA Address Number AD_ADDRNUM AD_ADDRNUM CHAR (10)
ERFZEIT Time created CO_INS_TIME UZEIT TIMS (6)
AEZEIT Changed At CO_CHG_TIME UZEIT TIMS (6)
CSTG_VRNT Costing Variant CK_KLVAR KLVAR CHAR (4)
COSTESTNR Cost Estimate Number for Cost Est. w/o Qty Structure CK_KALNR CK_KALNR NUMC (12)
VERAA_USER Person Responsible for CO Internal Order VERAA_USER XUBNAME USR02 CHAR (12)
EEW_AUFK_PS_DUMMY Dummy function in length 1 DUMMY DUMMY CHAR (1)
VNAME Joint venture JV_NAME JV_NAME T8JV CHAR (6)
RECID Recovery Indicator JV_RECIND JV_RECIND T8JJ CHAR (2)
ETYPE Equity type JV_ETYPE JV_ETYPE T8JG CHAR (3)
OTYPE Joint Venture Object Type JV_OTYPE JV_OTYPE CHAR (4)
JV_JIBCL JIB/JIBE Class JV_JIBCL JV_JIBCL T8J6A CHAR (3)
JV_JIBSA JIB/JIBE Subclass A JV_JIBSA JV_JIBSA T8J6C CHAR (5)
JV_OCO JV original cost object JV_OR_CO JV_OR_COB CHAR (1)
CPD_UPDAT Time Stamp /CPD/PFP_SC_TSTMP /CPD/PFP_SC_TSTMP DEC (15)
/CUM/INDCU CU: Order is Used for Compatible Units /CUM/INDCU FLAG CHAR (1)
/CUM/CMNUM CU: Construction Measure Number /CUM/CMNUM /CUM/CMNUM CHAR (12)
/CUM/AUEST CU: Automatic Copy of Estimated Costs /CUM/AUEST FLAG CHAR (1)
/CUM/DESNUM CU: Design Number /CUM/DESNUM /CUM/DESNUM * CHAR (12)
AD01PROFNR Dynamic Item Processor Profile AD01PROFNR AD01PROFNR AD01C_PROF CHAR (8)
VAPLZ Main work center for maintenance tasks GEWRK ARBPL CHAR (8)
WAWRK Plant associated with main work center WERGW WERKS * CHAR (4)
FERC_IND Regulatory indicator FE_IND FE_IND FERC_C7 CHAR (4)
AUFK_STATUS Status Combination ACTCMB_DELE ACTCMB_DOM ACTCMB_TAB INT1 (3)
CLAIM_CONTROL Claim creation control indicator WTYSC_CLAIM_CONTROL WTYSC_CLAIM_CONTROL WTYSCC_CLM_CONT CHAR (1)
UPDATE_NEEDED Claim inconsistency with order indicator WTYSC_UPDATE_NEEDED WTYSC_UPDATE_NEEDED CHAR (1)
UPDATE_CONTROL Claim update trigger point from service order WTYSC_UPDATE_CONTROL WTYSC_UPDATE_CONTROL WTYSCC_UPDT_CONT CHAR (1)
CUSTOMERFLD1 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD2 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD3 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD4 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD5 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD6 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD7 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD8 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD9 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD10 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD11 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD12 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD13 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD14 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)
CUSTOMERFLD15 Character Field with Length 10 CHAR10 CHAR10 CHAR (10)

Availability

The SAP table AUFK is available within SAP S/4HANA On-premise and SAP S/4HANA Cloud systems depending on the version and release level.

SAP S/4HANA Version Available?
1909 Yes
2020 Yes
2021 Yes
2022 Yes
2023 Yes

CDS Views for AUFK table

The following is the list of AUFK CDS views, which can also be used instead of AUFK table based on your business requirements.

CDS View CDS View Type Description
A_CNSLDTNINTERNALORDER BASIC Combined Internal Order
A_CNSLDTNINTERNALORDERT BASIC Combined Internal Order Text
A_INTERNALORDER BASIC API Internal Order
I_ACTUALPLANJOURNALENTRYITEM BASIC Actual Plan for Journal Entry Item
I_BR_ORDERTEXT BASIC Order Text
I_CNSLDTNINTERNALORDER BASIC Consolidation – Combined Internal Order
I_CNSLDTNINTERNALORDERENHCD BASIC Consolidation Combined Internal Order
I_CNSLDTNINTERNALORDERT BASIC Consolidation – Combined Internal Order Text
I_CNSLDTNINTERNALORDTEXTENHCD BASIC Consolidation Combined Order Text
I_EVENTBASEDWIPLOGHEADER BASIC Event-Based WIP Order Application Log Header
I_FLDLOGSMAINTENANCEORDER BASIC Get Field Logistics Maintenance Orders
I_FLDLOGSWORKORDERVH BASIC Work Order Value Help Non Teco Orders
I_INTERNALORDER BASIC Internal Order
I_INTERNALORDERSYSTEMSTATUS BASIC Internal Order System Status
I_JOINTVENTUREORDERDATA BASIC Joint Venture Order Data
I_LOGISTICSORDER BASIC Logistics Order
I_MAINTENANCEORDER BASIC Maintenance Order
I_MAINTENANCEORDERCOMPONENT BASIC Maintenance Order Component
I_MAINTENANCEORDEROPERATION BASIC Maintenance Order Operation
I_MAINTORDERQUERYNODE BASIC Cloud Printing – Query Node Maintenance Order
I_MANUFACTURINGORDER BASIC Manufacturing Order
I_MATLDOCLOGISTICSORDITMVH BASIC Invtry Management Logistics Order Items
I_MFGORDER BASIC Manufacturing Order
I_MFGORDERBASIC BASIC Manufacturing Order Basic
I_MFGORDERCONFIRMATION BASIC Manufacturing Order Confirmation
I_MFGORDERHEADERCONFIRMATION BASIC Manufacturing Order Header Confirmation
I_MFGORDERMFGEXECDISTRINFO BASIC Distribution Information on Production Order
I_MFGORDEROPERATIONBASIC BASIC Manufacturing Order Operation Basic
I_MFGORDEROPERATIONBYSEMANKEY BASIC Manufacturing Order Operation By Semantic Key
I_MFGORDEROPERATIONCOMPONENT BASIC Manufacturing Order Operation Component
I_MFGORDEROPERATIONCONF BASIC Manufacturing Order Operation Confirmation
I_MFGORDERSEQUENCEBASIC BASIC Manufacturing Order Sequence Basic View
I_MM_LOGISTICSORDERVH BASIC MM Purchasing Logistics Order Value Help
I_NETWORKACTIVITY BASIC Network Activity Details
I_NETWORKACTIVITYBYINTERNALKEY BASIC Network Activity Information By Internal Key
I_OPERATIONACTIVITYPLNDMATLRET BASIC Operation Activity Planned Material Return
I_ORDER BASIC Order Header
I_ORDERCOMPONENT BASIC Order Component
I_ORDERCONFIRMATION BASIC Order Confirmation
I_ORDERMASTERDATAWITHCRCY BASIC Order Master Data
I_ORDERPRODNRESOURCETOOL BASIC Order Production Resource Tool
I_ORDERSEQUENCE BASIC Order Sequence
I_ORDERSEQUENCEBYSEMKEY BASIC Order Sequence by Semantic Key
I_ORDMSTRDATA BASIC Order Master Data
I_PROCESSORDEROPERATION BASIC Interface View for Process Order Operation
I_PROCORDMGMTOPBASIC BASIC Process order operation afvg
I_PRODUCTCOSTCTRLGORDER BASIC Product Cost Controlling Order
I_PRODUCTIONORDEROPERATION BASIC Interface View for Production Order Operation
I_PROJECTMATERIALCOMPONENT BASIC Project Material Component Details
I_PROJECTNETWORK BASIC Project Network Details
I_PROJECTNETWORKBASICDATA BASIC Project Network Basic Data
I_PROJMATCOMPONENTVERSION BASIC Project Material Component Version
I_REALTIMEMFGORDERLOG BASIC Analyze Event-Based WIP and Variance Exceptions Log
I_REALTMEWRKINPROCCHGDBYUSER BASIC Real-Time WIP Distinct Changed By of WIP relevant PP orders
I_REALTMEWRKINPROCCRTEDBYUSER BASIC Real-Time WIP Distinct Created By of WIP relevant PP orders
I_SRVCDOCFUPINTERNALORDER BASIC Follow-Up Internal Order of Srvc Transac
I_SUPDMNDALLDOCPRODNORDBSC BASIC Basic View for Production Order
I_TRIPORDERNUMBERVH BASIC Order Number Value Help
P_ACTUALPLANJRNLENTRYITM BASIC P_ActualPlanJrnlEntryITm
P_CNSLDTNINTERNALORDER BASIC Consolidation Combined Internal Order
P_CNSLDTNINTERNALORDERT BASIC Consolidation Combined Order Text
P_CNSLDTNORDER BASIC Consolidation Combined Order
P_CNSLDTNORDERT BASIC Consolidation Combined Order Text
P_EBWOBJECTMAXSTATUS BASIC CO PCC Object Max Status
P_EVENTBASEDORDER BASIC Event-based Order
P_MAINTORDERDURATION BASIC used for AMDP method (Table function) for durations
P_MAINTORDERSEARCH BASIC Maintenance Order anchor view for CDS search model
P_MFGORDER BASIC Manufacturing Order Header
P_MFGORDEREWMSYNCHRONOUSPOSTG BASIC Mfg Order EWM Synchronous Posting
P_MFGORDEROPERATION BASIC Manufacturing Order Operation
P_MFGORDEROPRESERVATIONITEM BASIC Manufacturing Order Operation Reservation Item
P_ONROR BASIC View for ONROR
P_PROCORDMGMTOPBASIC BASIC Process order operation basic (afvc)
P_PROJMATCOMPVERSION BASIC View to fetch Purchase Requisition & Purchase Order version
P_PROJMATCOMPVERSION01 BASIC View to fetch PR and PO version uniquely
P_RA_FOLD_LINE_ITEM_POST_RULES BASIC Fold “posting rules applied to RA line items”
P_RA_LINE_ITEMS_POSTING_RULES BASIC Apply posting rules to line items
P_RA_OBJECTS BASIC Objects of results analysis
P_RA_SUM_FOLD_LINEITM_POSTRULE BASIC Sum folded “posting rules applies to RA line items”
P_SCHEDPRODNOPERRELN BASIC Relations between phases and operations
R_ORDERCONTROLLINGOBJECT BASIC Controlling Object for Order
A_EXCISETAXMATLDOCITEM COMPOSITE MatlDocItem for Industry Extensions
A_PROCESSORDER COMPOSITE API Process Order
A_PROCESSORDERCOMPONENT COMPOSITE API for Process Order Components
A_PROCESSORDERCOMPONENT_2 COMPOSITE Process Order Components
A_PROCESSORDEROPERATION COMPOSITE API for Process Order Operations
A_PROCESSORDEROPERATION_2 COMPOSITE Process Order Operations
A_PROCESSORDERPRODNRSCETOOLS_2 COMPOSITE Process Order Production Resources Tools
A_PROCESSORDERSTATUS COMPOSITE API Process Order Status
A_PROCESSORDERSTATUS_2 COMPOSITE Process Order Status
A_PROCESSORDER_2 COMPOSITE Process Order
A_PROCORDCONFIRMATION COMPOSITE API Process Order Confirmations
A_PROCORDCONFIRMATION_2 COMPOSITE Process Order Confirmation
A_PROCORDCONFMATLDOCITEM COMPOSITE Material Movements for Confirmation
A_PRODNORDCONFMATLDOCITEM COMPOSITE Material Movements for Confirmation
A_PRODUCTIONORDER COMPOSITE API Production Order
A_PRODUCTIONORDERCOMPONENT COMPOSITE API Production Order Components
A_PRODUCTIONORDERCOMPONENT_2 COMPOSITE Production Order Components
A_PRODUCTIONORDERCONF COMPOSITE API Production Order Confirmation
A_PRODUCTIONORDERCONF_2 COMPOSITE Production Order Confirmation
A_PRODUCTIONORDEROPERATION COMPOSITE API Production Order Operations
A_PRODUCTIONORDEROPERATION_2 COMPOSITE Production Order Operations
A_PRODUCTIONORDERSTATUS COMPOSITE API Production Order Status
A_PRODUCTIONORDERSTATUS_2 COMPOSITE Production Order Status
A_PRODUCTIONORDER_2 COMPOSITE Production Order
A_PRODUCTIONRSCETOOLS COMPOSITE API Production Resource/Tools
A_PRODUCTIONRSCETOOLS_2 COMPOSITE Production Resources Tools
A_SCHAGRMTACCNT COMPOSITE Account Assignment
A_WORKCENTERCAPDAYOP COMPOSITE Daily Operations Capacity
A_WORKCENTERCAPORDERPERBUCKET COMPOSITE Operation Load Distribution
A_WORKCENTERCAPPERBUCKET COMPOSITE Capacity Evaluation
A_WORKCENTERCAPPPLINEOP COMPOSITE Queued Operations Capacity
A_WORKCENTERDAYOPERATION COMPOSITE Daily Operations
A_WORKCENTERPIPELINEOPERATION COMPOSITE Queued Operations
I_ACTUALPLANJRNLENTRYITEMCUBE COMPOSITE Actual Plan of Journal Entry Item – Cube
I_ALERTOUTSTANDINGCUSTPAYMT COMPOSITE Outstanding Customer Payment
I_ALERTOVERDUECUSTOMERPAYMENT COMPOSITE Overdue Customer Payment
I_ALERTOVERDUEVENDORINVOICE COMPOSITE Overdue Vendor Invoice
I_ALERTOVERDUEVENDORPAYMENT COMPOSITE Overdue Vendor Payment
I_ALERTOVERGOODRCPT COMPOSITE Overdue Goods receipt: Alert
I_ALERTREJECTEDSERVICESHEET COMPOSITE Rejected Service Sheet
I_ARUNANLYTSSUPDMNDOVWCUBE COMPOSITE Overview of Supply and Demand
I_ARUNANLYTSTOTSUPCUBE COMPOSITE Total Supply of all Document Types
I_BR_NFITEMCOSTINFORMATION_C COMPOSITE Costing Nota Fiscal Line Information
I_BR_NFITEM_C COMPOSITE Nota fiscal item data
I_CACHEMRPMFGORDER COMPOSITE Cache MRP Manufacturing Orders
I_CALDUECUSTPYMT COMPOSITE Calculate Duedays for Customer Payment
I_CHANGERECORDMFGORDER COMPOSITE Change Record Production Order
I_CHFIEXPRODNORDCONFIGN COMPOSITE Production Order Config
I_CHGIMPACTMBOMPRODNORD COMPOSITE Mfg BOMs Linked with Prodn order
I_CHGIMPACTORDERDETS COMPOSITE Production Order Details
I_CHGIMPACTORDERSTATUS COMPOSITE Change Impact Order Status
I_CHGIMPACTORDSPCFCRTG COMPOSITE Order Specific Routings for POs
I_CHGIMPACTROUTINGPRODNORD COMPOSITE Production Orders for Routings
I_CNSLDTNMASTERDATA COMPOSITE Consolidation – Combined Master Data
I_CONTROLLINGOBJECTENHANCED COMPOSITE Controlling Object
I_COPCCORDERANDITEMCOSTSCUBE COMPOSITE CO PCC Order and Item Costs Cube
I_COPRODUCTCOSTBYORDER COMPOSITE CO Product Cost By Order
I_COPRODUCTCOSTBYORDERANDITEM COMPOSITE CO Product Cost By Order and Item
I_COSTCENTERBUDGET COMPOSITE Cost Center Budget Report
I_DEPDNTRESVNQUICKVIEW COMPOSITE Dependent Requirement and Order Reservation Details
I_DFS_MAINTENANCEORDERTECHSTS COMPOSITE Interface view for Tech Status of Order
I_DFS_MAINTEQUIPMENTDATA COMPOSITE Equipment Data
I_DFS_MAINTEQUIPNOTIFORDERDATA COMPOSITE Equipment data
I_DFS_MAINTFLGHTFUNCNLLOCSTRUC COMPOSITE Flight Functional Location Data
I_DFS_MAINTFLGHTORDSTRUCTURE COMPOSITE Equipment Structure Flight Order Data
I_DFS_MAINTFUNCNLLOCDATA COMPOSITE Functional Location Data
I_DFS_MAINTNOTIFFUNCNLLOCSTRUC COMPOSITE Notification Functional Location Data
I_DFS_MAINTNOTIFICATIONDATA COMPOSITE Interface view for Notification Data
I_DFS_MAINTNOTIFICATIONSTRUC COMPOSITE Interface view for Notification Struc
I_DFS_MAINTORDANDOPTECHSTS COMPOSITE Interface view for TStat of Ord and Op
I_DFS_MAINTORDERDATA COMPOSITE Interface view for order data
I_DFS_MAINTORDERFUNCNLLOCSTRUC COMPOSITE Order Functional Location data
I_DFS_MAINTORDERSTRUCTURE COMPOSITE Interface view for Order Struc
I_DFS_MAINTSTSBRDFLGHTORDDATA COMPOSITE Interface View of Flight Order
I_DSPDOCFLWANCHORDOCVH COMPOSITE Anchor Document VH for DDF
I_EARMARKEDFUNDSITEM COMPOSITE DEPRECATED -> use I_EarmarkedFundsDocumentItem
I_EARNEDVALUEDATA COMPOSITE Requirement Earned Value Calculations
I_ENTERPRISEPROJECTRANKINGCOST COMPOSITE Costs of projects assigned to Ranking
I_EVENTBASEDORDERKPI COMPOSITE Event-based Order KPI
I_EXCISETAXMATLDOCITEM COMPOSITE MatlDocItem for Industry Extensions
I_FLXMTPLOBJVARIANTNTWKACTYVH COMPOSITE Value help for Network Activities
I_HIERCOSTERP COMPOSITE Hierarchical Cost status: ERP scenario
I_HIERCOSTSTATUSACTUAL COMPOSITE Fetch Actuals for Hierarchical Cost stauts report
I_INTERNALORDERSTDVH COMPOSITE Internal Order
I_INTERNALORDERVH COMPOSITE Internal Order Value Help
I_JITMATLRCPNTDOCUMENTS COMPOSITE Just-In-Time Material Combined Recipient Documents
I_JVAACTLBDGTFOROPLEXPENSESOVW COMPOSITE Actual Cost & JV Budget for Opex Expense
I_JVAACTUALBUDGETLINEITEM COMPOSITE Actual Cost and JV Budget
I_JVAACTUALBUDGETOVERVIEW COMPOSITE Actual Cost and JV Budget Overview
I_JVAACTUALCAPITALEXPNDTROVW COMPOSITE Actual Cost & Capital Expenditure Ovw
I_KPIEARNEDVALUE COMPOSITE KPI: Earned Value
I_LOGISTICSORDERSTDVH COMPOSITE Logistics Order
I_MAINTENANCEJOBANDWORKITEM COMPOSITE Maintenance Job and Work Items
I_MAINTENANCEJOBOVERALLSTATUS COMPOSITE Overall Status of Maintenance Job
I_MAINTENANCEORDERSTDVH COMPOSITE Maintenance Order
I_MAINTJOBANDWORKITEMFORUSER COMPOSITE Current Users Maintenance Jobs and Work Items
I_MAINTNOTIFASSIGNORDERINPUT COMPOSITE Maint Notification Assign Order Input
I_MAINTNOTIFFORSCREENINGC COMPOSITE Maintenance Notifications for Screening
I_MAINTOBJBREAKDOWNCUBE COMPOSITE Maintenance Object Breakdown Cube
I_MAINTORDACTLPLNDCOSTCUBE COMPOSITE Maint. Order Actual Planned Cost Cube
I_MAINTORDCOMPPURORDERC COMPOSITE Purchase Orders for Maintenance Orders
I_MAINTORDCOMPPURREQUISITIONC COMPOSITE Purchase Requisitions for Maintenance Order Components
I_MAINTORDERACTUALCOSTCUBE COMPOSITE Maintenance Order Actual Cost Cube
I_MAINTORDERACTUALCOSTDATACUBE COMPOSITE Maintenance Order Actual Cost Data
I_MAINTORDERHASOPENMAINWORK COMPOSITE I_MaintOrderHasOpenMainWork
I_MAINTORDEROPERATIONDATA COMPOSITE Maintenance Order Operation Data
I_MAINTORDEROPERATION_DEX COMPOSITE Maintenance Order Operation Data
I_MAINTORDEROPERCOMP COMPOSITE Maintenance Order Operation Component
I_MAINTORDEROPERTECHOBJ COMPOSITE MaintOrder Operation w/ Technical Object
I_MAINTORDERSFORPLANNINGC COMPOSITE Maintenance Orders for Planning
I_MAINTORDERSUBOPERTECHOBJ COMPOSITE MaintOrder Sub-Operation w/ Tech. Object
I_MAINTORDERTECHOBJ COMPOSITE Maintenance Order w/ Technical Object
I_MAINTORDERTECHOBJCUBE COMPOSITE Maintenance Order Cube w/ Tech. Object
I_MAINTORDOPSTDVH COMPOSITE Maintenance Order Operation
I_MAINTWORKITEMINTERRUPTION COMPOSITE Maintenance Work Item Interruption
I_MANUFACTURINGORDEROPERATION COMPOSITE Manufacturing Order Operation
I_MASTERPROJECTACTUALSKPI COMPOSITE Get Actuals KPI for master project
I_MASTERPROJECTACTUALTILLMONTH COMPOSITE Get actuals till month
I_MAXDUECUSTPAY COMPOSITE Maximum Overdue Customer Payment
I_MFGCONTROLLINGOBJECTSTATUS COMPOSITE Manufacturing Controlling Object Status
I_MFGEXECEVENTHISTORY COMPOSITE Manufacturing Execution Event History
I_MFGORDASSLDDGTLMOCKUPINSTCE COMPOSITE Digital Mock Up Instance assembled into an Order
I_MFGORDERACTLPLANTGTCOST COMPOSITE Manufacturing Order Plan Actual – Cube
I_MFGORDERCONFMATLDOCITEM COMPOSITE Material Document Items of Mfg Order Confirmation
I_MFGORDERCONFOBJPGQTSUM COMPOSITE Manufacturing order confirmation Quantity Sum
I_MFGORDERCUBE COMPOSITE Manufacturing Order Header Cube
I_MFGORDERDATALIST COMPOSITE Mfg Order Header (Data List)
I_MFGORDERDEFECTFORSITUATIONS COMPOSITE Defect list to trigger situation
I_MFGORDERDOCINFORECDOBJLINK COMPOSITE Mfg Order Document Info Record Object Link
I_MFGORDERDOCINFORECDORIGL COMPOSITE Mfg Order Header Document Info Record Original
I_MFGORDERDOCUMENTDATALIST COMPOSITE Mfg Order Document (Data List)
I_MFGORDERDURATION COMPOSITE Manufacturing Order Duration
I_MFGORDERITEMDURATION COMPOSITE Manufacturing Order Item with Durations
I_MFGORDERMATERIALDOCUMENTITEM COMPOSITE Manufacturing Order Material Document Item
I_MFGORDEROBJPGCONFALL COMPOSITE Manufacturing order confirmations
I_MFGORDEROBJPGOPCONFQTY COMPOSITE Today Operation Confirmed Quantity
I_MFGORDEROBJPGSTATUS COMPOSITE Manufacturing Order Operations Status
I_MFGORDEROPACTYINSPCHARCS COMPOSITE Interface view for Insp. Char. for Oper. Acty. in MfgOrder
I_MFGORDEROPCOMPONENTDATALIST COMPOSITE Mfg Order Component (Data List)
I_MFGORDEROPCOMPONENTPICKLIST COMPOSITE Mfg Order Component (Pick List)
I_MFGORDEROPDOCINFORECDOBJLINK COMPOSITE Mfg Order Operation Document Info Record Object Link
I_MFGORDEROPERATION COMPOSITE Manufacturing Order Operation
I_MFGORDEROPERATIONBASICSTDVH COMPOSITE Manufacturing Order Operation Basic
I_MFGORDEROPERATIONCOMPCUBE COMPOSITE Manufacturing Order Operation Component Cube
I_MFGORDEROPERATIONCOMPWITHSTS COMPOSITE Manufacturing Order Operation Component With Status
I_MFGORDEROPERATIONCONFCUBE COMPOSITE Manufacturing Order Operation Confirmation Cube
I_MFGORDEROPERATIONCONFOPER COMPOSITE Mfg Order Operation Confirmation with Operation Details
I_MFGORDEROPERATIONCUBE COMPOSITE Manufacturing Order Operation Cube
I_MFGORDEROPERATIONDATALIST COMPOSITE Mfg Order Sub-/Operation (Data List)
I_MFGORDEROPERATIONDELAY COMPOSITE Manufacturing Order Operation Delay Information
I_MFGORDEROPERATIONDELAYBASIC COMPOSITE Manufacturing Order Operation Delay Basic Data
I_MFGORDEROPERATIONDURN COMPOSITE Manufacturing Order Operation Duration
I_MFGORDEROPERATIONDURNCUBE COMPOSITE Manufacturing Order Operation Duration Cube
I_MFGORDEROPERATIONFORCONF COMPOSITE Mfg Order Operation for Confirmation
I_MFGORDEROPERATIONPICKLIST COMPOSITE Mfg Order Operation (Pick List)
I_MFGORDEROPERATIONPRT COMPOSITE Mfg Order Operation Production Resource Tool
I_MFGORDEROPERATIONSTATUS COMPOSITE Manufacturing Order Operation Status
I_MFGORDEROPERATIONSTDVH COMPOSITE Manufacturing Order Operation
I_MFGORDEROPERATIONTRGGRPOINT COMPOSITE Mfg Order Operation Trigger Point
I_MFGORDEROPERATIONWITHSTATUS COMPOSITE Manufacturing Order Operation With Status
I_MFGORDEROPPRTDATALIST COMPOSITE MfgOrder ProductionResourceTool DataList
I_MFGORDEROUTPUTCONTROL COMPOSITE Output Control of Manufacturing Order
I_MFGORDERPICKLIST COMPOSITE Mfg Order Header (Pick List)
I_MFGORDERSEQUENCE COMPOSITE Manufacturing Order Sequence
I_MFGORDERSEQUENCEDATALIST COMPOSITE ManufacturingOrderSequence Data List
I_MFGORDERSEQUENCESTDVH COMPOSITE Manufacturing Order Sequence
I_MFGORDERSFILEADTIMECUBE COMPOSITE Mfg Order SFI Lead Time Cube
I_MFGORDERSTATUS COMPOSITE Manufacturing Order Header Status
I_MFGORDERSTDVH COMPOSITE Manufacturing Order
I_MFGORDERSUBOPBYSEMKEYSTDVH COMPOSITE Manufacturing Order SubOperation By Semantic Key
I_MFGORDERSUBOPERATIONBYSEMKEY COMPOSITE Manufacturing Order SubOperation By Semantic Key
I_MFGORDERVH COMPOSITE Manufacturing Order Value Help
I_MFGORDERWIPVARIANCE COMPOSITE WIP and Variance of Manufacturing Order
I_MFGORDERWITHSTATUS COMPOSITE Manufacturing Order Header with Status
I_MFGORDERWORKCENTER COMPOSITE WorkCenters for Manufacturing Orders
I_MFGORDERWRKCNTROPER COMPOSITE Workcenter Manufactoring Order Operations
I_MFGORDOPBYSEMANTICKEYSTDVH COMPOSITE Manufacturing Order Operation By Semantic Key
I_MFGORDOPDATESBYSEMKEYSTDVH COMPOSITE Manufacturing Order Operation Dates By Semantic Key
I_MFGORDOPDOCINFORECDORIGL COMPOSITE Mfg Order Operation Document Info Record Original
I_MFGPROCGEXECORDERMAINSTATUS COMPOSITE Order Main Status in Manufacturing Processing Execution
I_MILESTONEWITHVERSION COMPOSITE Project Milestone with Version
I_MM_INTERNALORDERVH COMPOSITE Purchasing Internal Order Value Help
I_MM_NETWORKACTIVITYVH COMPOSITE Purchasing Network Activity Value Help
I_MM_PROJECTNETWORKVH COMPOSITE Purchasing Project Network Value Help
I_MNTRWRKCTRORDEROPERATIONS COMPOSITE Monitor Work Centers – Order Operations
I_MPFILTERPROCUREMENT COMPOSITE Master Project Filter Fields for Procurement
I_MPMAXODUEGR COMPOSITE Maximum Overdue GoodsReceipt
I_MPMAXODUESS COMPOSITE Maximum days for Unapproved Sheet
I_MPMAXODUEVI COMPOSITE maximum Overdue Vendor Invoice
I_MPMAXODUEVP COMPOSITE Overdue Vendor Payment
I_MPNETWORK COMPOSITE Get Master Project Network
I_MPNETWORKACTIVITY COMPOSITE Get Master Project Network Activity
I_MPPRCHSORDRVH COMPOSITE Master Project Purchase Order Value Help
I_MPPRCHSRQSTNVH COMPOSITE Master Project Purchase Requisition Value Help
I_MPPRMATERIALVH COMPOSITE Master Project Procurement Material Value Help
I_MPPROCUREMENT COMPOSITE Procurement Data
I_MPPROCUREMENTCUBE COMPOSITE Procurement Cube
I_MPPROCUREMENTSTRELMVH COMPOSITE Master Project Structure Element for Procurement
I_MPPROCUREMENTSTRUCTURE COMPOSITE View to get Master Project with Structure Elements
I_MPPRRELEASECODEVH COMPOSITE Master Project Procurement Release Code Value Help
I_MPPRSUPPLIERVH COMPOSITE Master Project Procurement Supplier Value Help
I_MRPMANUFACTURINGCOMPONENT COMPOSITE MRP Manufacturing Components
I_MRPMFGORDER COMPOSITE MRP Manufacturing Order
I_MRPORDERCOMPONENT COMPOSITE Mfg Component and Maint Component
I_MSTRPROJACTIVITYDETAIL COMPOSITE Master Project Activity Detail
I_MSTRPROJACTLCALMNTHCOSTQTY COMPOSITE Commercial Proj Actual Cost Qty by Month
I_MSTRPROJACTLCOSTQTY COMPOSITE Commercial Project Actual Input Cost Qty
I_MSTRPROJACTLSTATISTICKEYFIG COMPOSITE Commercial Project Output SKF Actuals
I_MSTRPROJACTUALS COMPOSITE view for planned cost integration
I_MSTRPROJACTYREFVH COMPOSITE Master Project Activity Reference Value Help
I_MSTRPROJACTYVH COMPOSITE Master Project Activity Value Help
I_MSTRPROJCHKLSTACTY COMPOSITE Master Project Checklist Activity
I_MSTRPROJCOSTQTY COMPOSITE Commercial Project Actual Cost and Qty
I_MSTRPROJCOSTQTYWTHTOTCOST COMPOSITE Commercial Project Actual Cost Status
I_MSTRPROJDEBT COMPOSITE Master Project Debt
I_MSTRPROJHIERARCHY COMPOSITE Master Project Hierarchy List
I_MSTRPROJHIERLIST COMPOSITE Master Project Hierarchy List
I_MSTRPROJISSCHGACTY COMPOSITE Master Project Issue Change Activity
I_MSTRPROJITMPROJSTRUCNODE COMPOSITE Project Structure Node Master Project
I_MSTRPROJKPIERP COMPOSITE KPI for ERP scenario
I_MSTRPROJMYACTIVITIES COMPOSITE Master Project My Activities
I_MSTRPROJNMBROFOVRDPURORDS COMPOSITE Number of Overdue POs for Master Project
I_MSTRPROJNMBROFPURREQNS COMPOSITE Number of PRs Items for Master Project
I_MSTRPROJPOOVERDUE COMPOSITE Master Project Purchase Order Overdue
I_MSTRPROJPROCMTMATLSTDVH COMPOSITE Master Project Procurement Material Value Help
I_MSTRPROJPROCMTSTRUCSTDVH COMPOSITE Master Project Procurement Structure Element
I_MSTRPROJPROCMTSUPLRSTDVH COMPOSITE Master Project Procurement Supplier Value Help
I_MSTRPROJPROCUREMENTSTRELM COMPOSITE Master Project Procurement Structure Element
I_MSTRPROJPURCHASEORDERSTDVH COMPOSITE Master Project Purchase Order Value Help
I_MSTRPROJPURORDITEM COMPOSITE View for Master Project Purchase Order Item
I_MSTRPROJPURORDITEMSIMPLE COMPOSITE Simplified PO Items for Master Project
I_MSTRPROJPURREQITEM COMPOSITE Master Project Purchase Requisition Item
I_MSTRPROJPURREQITEMSIMPLE COMPOSITE Simplified PR Items for Master Project
I_MSTRPROJPURREQNSTDVH COMPOSITE Master Project Purchase Requisition Value Help
I_MSTRPROJRISKACTY COMPOSITE Master Project Risk Activity
I_MSTRPROJSTRUCTURE COMPOSITE Master Project Structure Element
I_MSTRPROJSTRUCTUREELEMENT COMPOSITE Master Project Structure Element
I_NETWORKACTIVITYSIMPLE COMPOSITE Simplified Network Activity for Project
I_NETWORKACTIVITYVALUEHELP COMPOSITE Network Activity Value Help
I_NETWORKACTIVITYWITHVERSION COMPOSITE Network Activity With Version
I_NMBROFOPNMAINTORDERBYTECHOBJ COMPOSITE Number of Open Maintainence Order by Technical Object
I_OPACTYDOCINFORECDOBJLINK COMPOSITE Operation Activity Document Info Record Object Link
I_OPACTYMAINWRKCTRMFGUSER COMPOSITE Mfg user with assgd main work center of an OA
I_OPENMAINTORDERFORTECHOBJECT COMPOSITE Open Maintainance Orders for Technical Object
I_ORDERREALTIMEPRODUCTIONCOST COMPOSITE Order Real Time Production Cost
I_ORDHDRITMREALTIMEPRODNCOST COMPOSITE Order Header and Item Real Time Production Cost
I_OUTSTANDINGCUSTPYMTAMT COMPOSITE Calculate Outstand Customer Payment
I_OVERDUEMAINTENANCEORDERC COMPOSITE Overdue Maintenance Orders
I_PCCORDERGENERALINFORMATION COMPOSITE PCC Order General Information
I_PPM_PROJCOSTBYFISCALPERIOD COMPOSITE Project Costs by Fiscal Period
I_PPM_PROJECTCOSTFORECASTDATA COMPOSITE Project Cost Forecast: ML Training Input
I_PPM_PROJECTCOSTFORECASTTRNG COMPOSITE Project Cost Forecast: ML Training Input
I_PPM_PROJECTCOSTSUMCURRENT COMPOSITE Project Cost To Current Date
I_PPM_PROJECTCOSTSUMOVRL COMPOSITE Project Cost To Date
I_PPM_PROJECTCOSTSUMTODATE COMPOSITE Project Cost To Date
I_PPM_PRSTCMRACTVPROJCOSTCOMP COMPOSITE Active Projects – Projects Cost Chart by Components (OVP)
I_PPM_PRSTCMRPROJBYKEYFIGURES COMPOSITE Projects By Key Figures
I_PROCESSORDERMGMTWORKLIST COMPOSITE Process Order Management Worklist
I_PROCESSORDERMGMTWRKLISTCALC COMPOSITE Process Order Management Worklist Calc
I_PROCESSORDERSTDVH COMPOSITE Process Order
I_PROCGEXECOPACTYINSTCETP COMPOSITE Open Processing Execution Operation Activity Instance
I_PROCGEXECOPERATIONACTIVITY COMPOSITE Operation Activity
I_PROCORDMGMTCOMPAVAILYSTS COMPOSITE Process Order Comp Availability Status
I_PROCORDMGMTCONFIRMATION COMPOSITE Process Order Confirmation
I_PROCORDMGMTDELAYISSUE COMPOSITE Process Order Delay Issue
I_PROCORDMGMTGOODSMOVEMENT COMPOSITE Process Order Goods Movement
I_PROCORDMGMTINSPLOT COMPOSITE Inspection Lot of Process Order
I_PROCORDMGMTISSUES COMPOSITE Process Order Management Issues
I_PROCORDMGMTOPCOMPONENTS COMPOSITE Process Order Operation Components
I_PROCORDMGMTOPERATION COMPOSITE Process Order Operations
I_PROCORDMGMTOPERATIONCALC COMPOSITE Process Order Operation Calculations
I_PROCORDMGMTOPPHASE COMPOSITE Process Order Operation Phase
I_PROCORDMGMTOPSOVW COMPOSITE Process order current and next ops ovw
I_PROCORDMGMTQUALITYISSUE COMPOSITE Process Order Quality Issue
I_PROCORDMGMTQUANTITYISSUE COMPOSITE Process Order Quantity Issue
I_PROCORDMGMTWITHSTATUS COMPOSITE Process order with status
I_PRODNORDERSUBOPBYSEMKEYSTDVH COMPOSITE Production Order SubOperation By Semantic Key
I_PRODNORDOPBYSEMKEYSTDVH COMPOSITE Production Order Operation By Semantic Key
I_PRODUCTCOSTBYORDERCUBE COMPOSITE Production Cost By Order
I_PRODUCTCOSTCTRLGORDERSTDVH COMPOSITE Product Cost Controlling Order
I_PRODUCTIONORDERQUICKVIEW COMPOSITE Quick view data for Production Order
I_PRODUCTIONORDERSTDVH COMPOSITE Production Order
I_PROJECTBDGTITEMSBYPOSTGPERD COMPOSITE Project Budget Items by Posting Period
I_PROJECTBUDGETCONSUMPTION COMPOSITE Project Budget Consumption
I_PROJECTBUDGETITEMS COMPOSITE Project Budget Items
I_PROJECTBUDGETITEMSCUBE COMPOSITE Project Budget Items Cube View
I_PROJECTCOSTDATES COMPOSITE Dates based on Project Plan/Actual Costs
I_PROJECTCOSTLINEITEMS COMPOSITE Project Cost Line Items
I_PROJECTCOSTLINEITEMSBYPERIOD COMPOSITE Project Cost Line Items by Period
I_PROJECTCOSTLINEITEMSCUBE COMPOSITE Project Cost Line Items Cube
I_PROJECTCOSTLINEITEMSOVW COMPOSITE Project Cost Line Items Overview
I_PROJECTCOSTOBJECT COMPOSITE Project Cost Object
I_PROJECTFINANCIALSUMMARY COMPOSITE Monitor Project Financials
I_PROJECTMILESTONEVALUEHELP COMPOSITE Project Milestone Value Help
I_PROJECTNETWORKSTDVH COMPOSITE Project Network Details
I_PROJECTNTWKVALUEHELP COMPOSITE Project Network Value Help
I_PROJECTOVERALLCOST COMPOSITE Project Overall Cost
I_PROJMATCOMPONENTWITHVERSION COMPOSITE Project Material Component with Version
I_PROJNETWORKWITHVERSION COMPOSITE Project Network and Version Details
I_PROJPURDOCITEMS COMPOSITE Basic view for tab PurDoc on WBSElement app
I_PUBSECBDGTACTLITEMBASIC COMPOSITE Budget Cmtmt and Actual Items Basic
I_PUBSECBDGTACTLITEMCUBE COMPOSITE Budget Cmtmt and Actual Items – Cube
I_QUEUINGOPERATIONS COMPOSITE Queuing Operations
I_REACCOUNTINGOBJECT COMPOSITE Real Estate Accounting Object
I_REALTIMEMFGORDERPOSTEDKPI COMPOSITE Posted Event-Based WIP and Variance Exceptions
I_REALTIMEMFGORDERTOBEPOSTDKPI COMPOSITE To be posted Event-Based WIP and Variance Exceptions
I_REALTIMEPRODNCOSTCOMPGROUP COMPOSITE Real Time Production Cost Component Groups
I_REALTIMEWORKINPROCESS COMPOSITE Real Time WIP Reporting
I_RSHMAINTSCHEDEXISTINGOP COMPOSITE Existing Operations not part of Schedule
I_RSHMAINTSCHEDSMLTDOP COMPOSITE Maint Scheduling Simulation Operations
I_RSHMAINTSCHEDSMLTDWRKCTR COMPOSITE List of Workcenters in the Schedule
I_RSHOPERATIONANDSUBOPERATION COMPOSITE Maintenance Order Operation and Suboperation
I_RSHORDER COMPOSITE Maintenance Orders
I_SALESORDERFLFMTISSUEBASIC COMPOSITE SOFM Issue Without Details
I_SALESORDERFULFILLMENTISSUE COMPOSITE SOFM Issue
I_SALESORDERINSUPPLYMFGISSUE COMPOSITE SOFM Manufacturing Issue
I_SCHEDAGRMTACCT COMPOSITE Scheduling Agreement Account Assignment
I_SCHEDPRODNOPERATIONS COMPOSITE All scheduled operations
I_SCHEDPRODNWRKCTRSQNCVH COMPOSITE Work Ctr Filter for dispatch by sequence
I_SCHEDWORKLISTOPERATION COMPOSITE Operations worklist for Sched Prodn
I_SFIDOCINFORECDOBJLINK COMPOSITE Shop Floor Item Document Info Record Object Link
I_SFIOPACTYINSPCHARCSAGGRG COMPOSITE Interface view for Insp. Char. for Oper. Acty. in MfgOrder
I_SLSDOCFLFLLMNTPROCFLOW COMPOSITE SlsDoc Fulfillment Analyzer Process Flow
I_SLSORDFLFMTINSUPMFGCONTACT COMPOSITE SOFM Sales Order Fulfillment In Supply Manufact. Contact
I_SLSORDFLFMTINSUPPLYCONTACT COMPOSITE SOFM Sales Order Fulfillment In Supply Contact
I_SLSORDFLFMTMFGORDER COMPOSITE SOFM Manufacturing Order
I_SLSORDFLFMTPROCESSFLOW COMPOSITE SOFM Process Flow
I_SOFULFILLMENTMONITOR_F2200 COMPOSITE Categorize Sales Orders
I_SRVCCONTRFINANCIALCUBE COMPOSITE Service Contract Financial – Cube
I_SRVCCONTRINTORDERCUBE COMPOSITE Internal Order of Srvc Contract – Cube
I_STATISTICALKEYFIGUREITEM COMPOSITE Statistical Key Figure Items
I_SUMCUSTPYMTAMOUNT COMPOSITE Outstanding Customer Payment
I_SUPDMNDALLDOCOVWCUBE COMPOSITE Cube View for Overview of Supply and Demand
I_SUPDMNDALLDOCPRODNORD COMPOSITE View for Production Order
I_SUPDMNDALLDOCPRODNORDASSGC COMPOSITE Cube View for Production Order Assignment Details
I_SUPDMNDALLDOCPRODNORDC COMPOSITE Cube View for Production Order Details
I_SUPDMNDALLDOCSUPPLY COMPOSITE View for Supply of All Documents
I_SUPDMNDALLDOCTOTSUP COMPOSITE View for Total Supply of All Document Types
I_SUPDMNDALLDOCTOTSUPCUBE COMPOSITE Cube View for Total Supply of All Document Types
I_SUPDMNDOVWPGTOTSUPC COMPOSITE Cube View for Total Supply of all Sources
I_TODAYSOPERATIONS COMPOSITE Todays Operations
I_TRACKTOOLUSAGEOPACTYEQUIP COMPOSITE List of OAs for Equipment
I_USERDEFAULTSETTINGITEMWD COMPOSITE User Defaults BO Item view
I_WBSORDERS COMPOSITE WBS Element Order Details
I_WORKCENTERCAPORDERPERBUCKET COMPOSITE Load Distribution at shift level for operations
I_WORKCENTERCAPPERBUCKET COMPOSITE WorkCenter capacity evaluation
I_WORKCENTERCAPPPLINEOP COMPOSITE Load all opr for manufacturing and planned order for Cap
I_WORKCENTERPRODCOSTCUBE COMPOSITE Production Cost By Work Center
I_WORKCENTERPRODUCTCOST COMPOSITE Interface View for Product Cost by Work Center
I_WORKCTROPLOADDISTRAGGRGD COMPOSITE Load Distribution at shift level for operations
P_ACTUALSCONV COMPOSITE Actuals in Used currency
P_BUDGETPOSTINGSBYCURRENTYEAR COMPOSITE Get Projects which has budget postings for current year
P_BUDGETPOSTINGSBYFISCALYEAR COMPOSITE Budget Postings by Fiscal Year
P_CAPACITYSCHEDOPERSCOUNT COMPOSITE Count of operations on the same capacity
P_CAPEVALCAPACITYDETSINDCMLS COMPOSITE Capacity Details in Decimals in Time Period
P_CAPOPMAXMINDTE COMPOSITE Maximum and Minimum Date for Operations of Workcenter
P_CHGIMPACTNTWKORDERSTATUS COMPOSITE Network Order Status
P_CHGIMPACTORDERSTATUS COMPOSITE Production Order Status
P_CHGIMPACTSTATUSCODES COMPOSITE Change Impact Order ID for Status
P_COACTLPLNTGTVARCRAUNION COMPOSITE Private view for CO Costs Union
P_COEVTBSDORDERACTUALCOSTGRP1 COMPOSITE Event Based Order Actual Cost Groups
P_COEVTBSDORDERACTUALCOSTGRP2 COMPOSITE Event Based Order Actual Cost Groups
P_COEVTBSDORDERACTUALCOSTGRP3 COMPOSITE Event Based Order Actual Cost Groups
P_COEVTBSDORDERACTUALCOSTGRP4 COMPOSITE Event Based Order Actual Cost Groups
P_COEVTBSDORDERACTUALCOSTSUM COMPOSITE Event Based Order Actual Costs Sum
P_COEVTBSDORDERTARGETCOST2 COMPOSITE Event Based Order Target Costs by Crcy Role
P_COEVTBSDORDERTARGETCOST3 COMPOSITE Event Based Order Target Costs by PlnCat
P_COMFGORDERTARGETBYOBJECT COMPOSITE Target Costs by Object for Manufacturing Orders
P_COMFGORDERTARGETCUBE COMPOSITE Target Costs Cube for Manufacturing Orders
P_COMFGORDERTARGETCUBE1 COMPOSITE Target Costs Cube for Manufacturing Orders
P_COMFGORDERTGTCOSTBYOBJECT COMPOSITE Target Costs Cube for Manufacturing Orders
P_CONTROLLINGOBJECTENHANCED COMPOSITE P_ControllingObjectEnhanced
P_COORDEROUTPUTQUANTITIES COMPOSITE CO Order Output Quantities
P_COORDEROUTPUTQUANTITIES2 COMPOSITE CO Order Output Quantities 2
P_COORDERPLANTARGETBYOBJECT COMPOSITE Plan and Target Costs by Object
P_COORDERPLANTARGETCUBE COMPOSITE Order Plan Target Cube
P_COOUTPUTQUANTITIESBYOBJECT2 COMPOSITE CO Output Quantity By Object 2
P_COPCCORDERACTUALBALANCE COMPOSITE CO PCC ORDER ACTUAL BALANCE
P_COPCCORDERANDITEMACTUALCUBE COMPOSITE CO PCC Order And Item Actual Cube
P_COPCCORDERANDITEMCOSTS1 COMPOSITE CO PCC Order and Item Costs Layer 1
P_COPCCORDERANDITEMCOSTS2 COMPOSITE CO PCC Order and Item Costs Layer 2
P_COPCCORDERANDITEMCOSTS3 COMPOSITE CO PCC Order and Item Costs Layer 3
P_COPCCORDERANDITEMCOSTS4 COMPOSITE CO PCC Order and Item Costs Layer 4
P_COPCCORDERANDITEMCOSTSCUBE COMPOSITE CO PCC Order Costs Cube
P_COPCCORDPLNTGTWIPBYOBJECT COMPOSITE Plan and Target Costs and WIP by Object for PCC Orders
P_COPRODUCTCOSTBYORDER COMPOSITE CO Production Costs By Object
P_COPRODUCTCOSTBYORDERANDITEM COMPOSITE CO Production Costs By Object
P_COSTCENTERBUDGET COMPOSITE Cost Center Budget Report
P_COSTCENTERBUDGETBAL COMPOSITE Cost Center Budget Report Balances
P_CTRLGSETTLEMENTOBJECT COMPOSITE Controlling Settlement Object
P_DEMANDDRIVENORDERS COMPOSITE Demand Driven Relevant Orders
P_ENTERPRISEPROJECTRANKINGCOST COMPOSITE Costs of projects assigned to Ranking
P_ENTPROJCOSTDATES COMPOSITE Project Cost Start and End Dates
P_ENTPROJCOSTDATESAGG COMPOSITE Enterprise Project Cost Dates Aggregated
P_ENTPROJCOSTLINEITEMS COMPOSITE Enterprise Project Cost Line Items
P_ERPACTUALWIP COMPOSITE ERP acenario Actuals and WIP
P_EVENTBASEDORDERKPI COMPOSITE Event-based Order KPI
P_GR_DUEDAYS COMPOSITE Calculate GoodsReceipt OverDueDays
P_JITMATLRCPNTDOCUMENTS COMPOSITE Just-In-Time Material Combined Recipient Documents
P_JVAACTLBDGTFOROPLEXPENSESOVW COMPOSITE Actual Cost & JV Budget for Opex Expense
P_JVAACTUALBUDGETOVERVIEW COMPOSITE Actual Cost and JV Budget
P_JVAACTUALCAPITALEXPNDTROVW COMPOSITE Actual Cost & Capital Expenditure Ovw
P_MAINTENANCEJOBANDWORKITEM COMPOSITE Maintenance Job and Work Item
P_MAINTENANCEJOBOVERALLSTATUS COMPOSITE EAM Object Phase for Leading Job Document
P_MAINTNOTIFFORSCREENINGC COMPOSITE Maintenance Notifications for Screening Cube
P_MAINTOBJBREAKDOWNCUBE COMPOSITE Maintenance Object Breakdown Private Cube
P_MAINTORDDIRECTPROCMTVIAPO COMPOSITE Purchase Orders for Direct Procurement
P_MAINTORDDIRECTPROCMTVIAPR COMPOSITE Purchase Requisitions for Direct Procurement
P_MAINTORDERBASICDATA COMPOSITE Maintenance order basic data
P_MAINTORDERSFORPLANNINGC COMPOSITE Maintenance Orders for Planning
P_MAINTORDRESPONSIBLEPARTNER COMPOSITE Responsible Partner for Maintenance Order Header
P_MASTERPROJECTACTUALS COMPOSITE Union of total actuals and actuals till month
P_MASTERPROJECTACTUALSCALC1 COMPOSITE Get Actulas time stamp
P_MASTERPROJECTACTUALSCALC2 COMPOSITE Get Actulas Cur month
P_MASTERPROJECTACTUALTILLMONTH COMPOSITE Get master Project actuals Till month
P_MFGEXECEVENTHISTORDER COMPOSITE Order Execution Event History
P_MFGORDACTLPLNSTDTGTUNION COMPOSITE Manufacturing Orders Actual/Plan/Standard/Target Costs Union
P_MFGORDACTLPLNTGTUNION COMPOSITE Private view for actual/plan/target union
P_MFGORDCOMPNOINSTCEASSYBYDGTL COMPOSITE DMU Instance whose component is assembled into an Order
P_MFGORDERACTLPLANTGTCOST COMPOSITE Private view for actual/plan/target cost
P_MFGORDERACTLPLANTGTCOSTCUBE COMPOSITE Private view actual/pln/target cost cube
P_MFGORDERACTLPLANTGTCOSTDET COMPOSITE Private view for actual/plan/target cost details
P_MFGORDERDOCINFORECDOBJLINK COMPOSITE Mfg Order Document Info Record Object Link
P_MFGORDEROPERATIONAGGR COMPOSITE Manufacturing Order Operation
P_MFGORDEROPERATIONDELAY COMPOSITE Manufacturing Order Operation Delay
P_MFGORDEROPERATIONDELAYBASIC COMPOSITE Manufacturing Order Operation Delay Basic Data
P_MFGORDEROPERATIONSTATUS COMPOSITE Manufacturing Order Operation Status
P_MFGORDERPICKABLECOMPCOUNT COMPOSITE Manufacturing Order Pickable Component Count
P_MFGORDERSTATUS COMPOSITE Manufacturing Order Status
P_MFGORDERWIPVARCCUBE COMPOSITE Private view for Manufacturing Order WIP / Variance Cube
P_MFGORDERWIPVARIANCE COMPOSITE Private view for Manufacturing Order WIP / Variance
P_MFGORDLINKEDSAPOBJKEYRNGE COMPOSITE Range for selection of Order Linked SAP Object Key
P_MFGORDTARGETCOST1 COMPOSITE Private view for target cost product costing
P_MFGPROCGEXECORDMAINSTATUS COMPOSITE Manufacturing Order Main Execution Status
P_MFGPROCGEXECORDMAINSTATUS2 COMPOSITE Manufacturing Order Main Execution Status
P_MILESTONEWITHVERSION COMPOSITE Private basic view for Milestone app
P_MNTRWRKCTRORDEROPERATIONS COMPOSITE Work Center Order Operations
P_MPACTIVITIES COMPOSITE Master Project Activities
P_MPACTIVITYDETAIL COMPOSITE Master Project Activity Detail
P_MPACTUALREVCOST COMPOSITE Master Project Actual and Revenue cost sum
P_MPAPPSERVSHEET COMPOSITE Get Approved ServiceSheets
P_MPEKBETYPE2 COMPOSITE Get all Vendor Invoice
P_MPEKBETYPE5 COMPOSITE Get all Vendor Payment
P_MPEKBETYPE9 COMPOSITE Get all unapprovedServiceSheet
P_MPNWE COMPOSITE NetworkElement Details for Master Project List
P_MPNWEPURDOC COMPOSITE PurchaseDocuments in NetworkActivity Level
P_MPODUEVENINV COMPOSITE Calculate Overdue Vendor Invoice Days
P_MPODUEVENPAY COMPOSITE Calculate Overdue Vendor Payment
P_MPPROCUREMENT COMPOSITE Master Project Procurement
P_MPPROCUREMENTSTRUCTURE COMPOSITE Union to get Master Project Elements
P_MPPURREQPURORD COMPOSITE Procurement Data
P_MPSCHEDULE COMPOSITE ScheduleAgreements for MP
P_MPSERVSHEETDETAILS COMPOSITE Master Project Service Sheet Details
P_MSTRPROJACTLCOSTQTY COMPOSITE Actuals for Master Project
P_MSTRPROJACTUALREVCOST COMPOSITE Master Project Actual
P_MSTRPROJACTUALSHCS COMPOSITE Actual Cost revenue for HCS
P_MSTRPROJACTUALSINPROJCRCY COMPOSITE Master Project Actual cost & revenue in project currency
P_MSTRPROJACTUALWIP COMPOSITE Master Project Actuals with WIP
P_MSTRPROJACTUALWIPCOST COMPOSITE Actual cost with work in progress
P_MSTRPROJAGGRGDACTLCOST COMPOSITE Aggregated Actual Cost for Master Project Structure Elements
P_MSTRPROJCHKLSTREFERENCEDOC COMPOSITE Master Project Checklist Reference Document
P_MSTRPROJCTRLGOBJACTLREVCOST COMPOSITE Actuals for all the controlling objects
P_MSTRPROJDEBT COMPOSITE Master Project Debt
P_MSTRPROJEXCLDSTSTCLKEYFIG COMPOSITE Master Project Excluded SKF List
P_MSTRPROJFINPLANSTSTCLKEYFIG COMPOSITE Master Project Financial Plan with SKF
P_MSTRPROJHIERACTLCOSTREV COMPOSITE Master Project Actual Cost and revenue
P_MSTRPROJHIERARCHY COMPOSITE Master Project Hierarchy
P_MSTRPROJHIERCOMMITMENT COMPOSITE Master Project Hierarchy Commitment
P_MSTRPROJHIERSALES COMPOSITE Master Project
P_MSTRPROJHIERWITHSTSTCLKEYFIG COMPOSITE Master Project Hierarchy with SKF
P_MSTRPROJKPIERP COMPOSITE Plan and actual cost: ERP scenario
P_MSTRPROJPLANACTUAL COMPOSITE Master Project Plan Actual
P_MSTRPROJPLANCOST COMPOSITE Plan Cost
P_MSTRPROJSALESORDACTUALS COMPOSITE Provides Master Project Sales Order only actuals
P_MSTRPROJSTRUCTELMNTACTUALS COMPOSITE Master Project actuals for no SKF posting
P_MSTRPROJSTRUCTURE COMPOSITE Master Project Structure Elements
P_MSTRPROJWTHFINPLAN COMPOSITE Master Project Hierarchy With Financial Plan
P_MSTRPROJWTHSTSTCLKEYFIG COMPOSITE Master Project Structure Elements with SKF
P_NETWORKACTIVITYWITHVERSION COMPOSITE View for Union Network Activity(OperVer)
P_NMBROFINSPLOTWTHRJCTDCHAR COMPOSITE Process Order Inspection Lots with rejected characteristics
P_NMBROFPROCORDOPPHASES COMPOSITE Number of Phases of a Process Order Operation
P_NMBROFPROCORDOPSWITHDELAY COMPOSITE Number of Process order operations with delay
P_NMBROFPROCORDOPSWITHQLTYISS COMPOSITE Nmbr of Proc Ord Ops with quality issues
P_NMBROFPROCORDOPSWITHQTYISS COMPOSITE Number of Process order ops with qty issue
P_ODUE_GRECPT COMPOSITE Calculate Overdue Goods
P_OPACTYASSYBYORIGLCOMPUNION COMPOSITE SFI@OA Assembly by original component (manual & backflushed)
P_OPACTYCOMPONENTASSIGNMENTDMU COMPOSITE Operation Activity Instance Component Assignment for DMU
P_OPACTYMAINWRKCTRMFGUSER COMPOSITE Mfg user with assgd main work center of an OA
P_OPACTYNUMBEROFINSPCHARCS COMPOSITE To determine if IC are present for OA
P_OPERATIONACTIVITYWORKLIST COMPOSITE Operation Activity Worklist
P_ORDERCATEGORYOBJECT COMPOSITE Project Cost Object Order Category
P_ORDERDURATIONCALCFIELDS COMPOSITE Calculation of order duration
P_ORDERITEMCATEGORYOBJ COMPOSITE Project Cost Object Order Item Category
P_ORDERREALTIMEPRODUCTIONCOST1 COMPOSITE Event Based Order Real Time Production Costs Details
P_ORDERREALTIMEPRODUCTIONCOST2 COMPOSITE Order Real Time Production Cost
P_ORDHDRITMREALTIMEPRODNCOST1 COMPOSITE Event Based Order Header and Items RT Prodn Costs Details
P_ORDHDRITMREALTIMEPRODNCOST2 COMPOSITE Order Header and Items Real Time Production Cost
P_OVERDUEMAINTENANCEORDERC COMPOSITE Overdue Maintenance Orders
P_PCCORDERGENERALINFORMATION COMPOSITE PCC Order General Information
P_PLANCOSTTILLMONTH COMPOSITE Plan Cost till month from ERP
P_PPM_PROJCOSTSUMPERD COMPOSITE Project Cost – Sum by Period
P_PPM_PROJECTCOSTLINEITEM COMPOSITE togetCostLineItems
P_PPM_PROJECTCOSTLINEITEMS COMPOSITE PPM Project Cost Line Items
P_PPM_PRSTCMRPROJBYKEYFIGURES COMPOSITE Projects By Key Figures
P_PROCESSORDERMGMTWRKLISTCALC COMPOSITE Process Order calculations
P_PROCGEXECOPERATIONACTIVITY COMPOSITE Operation Activity
P_PROCORDCUROP COMPOSITE Process order current operation details
P_PROCORDCUROPPHSEAGGRGN COMPOSITE Process Order Operation Phases Aggregation
P_PROCORDEROPERATIONDURN COMPOSITE Process Order Operation Durations
P_PROCORDFIRSTOP COMPOSITE Process order first operation details
P_PROCORDFIRSTOPAGGR COMPOSITE Process order first operation
P_PROCORDFIRSTOPERATION COMPOSITE Process Order First Operation
P_PROCORDINSPLOTUSGEDCSNCODER COMPOSITE Process Order Inspection Lots with Usage Decision Code R
P_PROCORDINSPLOTWTHRJCTDCHAR COMPOSITE process order inspection lot with rejected characteristics
P_PROCORDINSPRJCTDCHAR COMPOSITE process order inspection lot characteristics
P_PROCORDLATESTOP COMPOSITE Process order latest operation details
P_PROCORDLATESTOPAGGR COMPOSITE Process order latest operation aggregation
P_PROCORDMGMTBASIC COMPOSITE Process order
P_PROCORDMGMTBATCHAGGR COMPOSITE Calculate Batch from GR
P_PROCORDMGMTBATCHCALC COMPOSITE Calculate Batch from GR
P_PROCORDMGMTCOMPAVAILYSTS COMPOSITE Process Order Comp Availability Status
P_PROCORDMGMTCOMPLTSTAGGR COMPOSITE Process Order Component Latest Aggregation
P_PROCORDMGMTCOMPLTSTBATCH COMPOSITE Process Order Component Latest Batch
P_PROCORDMGMTDELAYISSUE COMPOSITE Process Order Delay Issue
P_PROCORDMGMTOPCOMPONENTS COMPOSITE Process Order Operation Components
P_PROCORDMGMTOPCOMPWITHSTS COMPOSITE Process Order Op Components with status
P_PROCORDMGMTOPERATION COMPOSITE Process order operation basic view
P_PROCORDMGMTOPERATIONBASIC COMPOSITE Process Order operations basic view
P_PROCORDMGMTOPERATIONCALC COMPOSITE Process Order Operation Calculations
P_PROCORDMGMTQUALITYISSUE COMPOSITE Process Order Quality Issue
P_PROCORDMGMTQUANTITYISSUE COMPOSITE Process Order Quantity Issue
P_PROCORDMISGCOMPAGGRGN COMPOSITE Process Order Missing Components Aggregation
P_PROCORDNEXTOP COMPOSITE Process order next operation details
P_PROCORDNXTOPAGGR COMPOSITE Process order next operation
P_PROCORDNXTOPCALC COMPOSITE Process Order Next Operation Calc
P_PROCORDOPDELAYAGGRGN COMPOSITE Process order operation delay aggregation
P_PROCORDOPERATIONQTYISSUE COMPOSITE Process order operations quantity issue
P_PROCORDOPERATIONWITHSTATUS COMPOSITE Process Order operations with status
P_PROCORDOPINCONFDSTSAGGRGN COMPOSITE Process order operations in confirmed status
P_PROCORDOPQUALITYISSAGGRGN COMPOSITE Process order quality issue aggregation
P_PROCORDOPSTATUS COMPOSITE Process Order operations with status basic
P_PROCORDOPSUCCSSRPHASECALC COMPOSITE Process order operation successor phase calculcation
P_PRODUCTCOSTCTRLGORDERANDITEM COMPOSITE Production Order
P_PROJACTLPLNJRNLENTRITM COMPOSITE Project Actual Plan Journal Entry Items
P_PROJACTUALCOSTLINEITEMS COMPOSITE Project Cost Line Items with Actual Costs
P_PROJCMTMTCOSTLINEITMS COMPOSITE Project Cost Line Items with Commitment Costs
P_PROJCOSTACCTGLINEITMS COMPOSITE Projects with Accounting Cost Line Items
P_PROJCOSTITEMS_OVW COMPOSITE Project Cost Line Items
P_PROJCOSTLINEITEMUNION COMPOSITE Project Cost Line Items Union
P_PROJCOSTSPCLPERDTMERNGE COMPOSITE Project Cost Line Items Cube
P_PROJECTACTUALCOSTDATES COMPOSITE Dates based on Project Actual Costs
P_PROJECTBUDGETCONSUMPTION COMPOSITE Project Budget Consumption
P_PROJECTBUDGETITEMS COMPOSITE Project Budget Items
P_PROJECTCOSTLINEITEMS COMPOSITE Project Cost Line Items
P_PROJECTCOSTOBJECT COMPOSITE Project Cost Object
P_PROJECTCOSTSUM COMPOSITE Project Total Actual Costs
P_PROJECTFINANCIALSUMMARY COMPOSITE Project Financial Summary
P_PROJECTFINBDGTSUMMARY COMPOSITE Project Financial Budget Summary
P_PROJECTFINBUDGETSMMRY COMPOSITE Project Financial Budget Summary
P_PROJECTOVERALLCOST COMPOSITE Project Overall Cost
P_PROJECTPLANCOSTDATES COMPOSITE Dates based on Project Actual Costs
P_PROJECTPREDICTIONSUMMARY COMPOSITE Project Costs with predictions and missing months
P_PROJFINSMMRYLNITEMS COMPOSITE Project Financial Summary Line Items
P_PROJMATCOMPONENTWITHVERS COMPOSITE Mat Component Union (Operative + Ver.)
P_PROJNETWORKWITHVERSION COMPOSITE Network Union View (Operative + Ver.)
P_PROJPLNCOSTLINEITMS COMPOSITE Project Cost Line Items with Planning Category Costs
P_PROJPMOCOSTLINEITMS COMPOSITE Project Cost Line Items with PMO Costs
P_PROJPREDTWTHMISGMNTHSMMRY COMPOSITE Project Prediction With Missing Month
P_PROJSUMOFOVRLCOSTS COMPOSITE Project Sum Of Overall Costs
P_PURDOCMP COMPOSITE PurchaseDoc for MasterProject
P_REALTIMEMFGORDER COMPOSITE Event-based Order
P_REALTIMEMFGORDERPOSTEDKPI COMPOSITE Event-based Order KPI
P_REALTIMEMFGORDERTOBEPOSTDKPI COMPOSITE Event-based Order KPI
P_REALTIMEORDERCOST COMPOSITE Real-Time Order Cost
P_REALTIMEORDERCOSTINFO COMPOSITE Order Cost Info
P_REALTIMEORDERCOSTINFO1 COMPOSITE Order Cost Info Layer 1
P_REALTIMEWORKINPROCESS4 COMPOSITE Real Time WIP Reporting – Order Data with Costing
P_REALTIMEWORKINPROCESS5 COMPOSITE Real Time WIP Reporting – Order Data calculations
P_REALTMEWRKINPROCORDHDANDITEM COMPOSITE Real Time Work in Process Order Header and Items
P_RTOCD_ACTWIPPLNTGTVARCUNION COMPOSITE Real-Time Order Cost Details – Actl/WIP/Plan/Tgt/Varc Union
P_RTOCD_EXCEPTIONSTATUS COMPOSITE Real-Time Order Cost Exception Status
P_RTOCD_EXCEPTIONSTATUS1 COMPOSITE Real-Time Order Cost Exception Status
P_RTOCD_EXCEPTIONSTATUS2 COMPOSITE Real-Time Order Cost Exception Status
P_RTOCD_ORDERANDITEMCOSTS COMPOSITE Real-Time Order Cost Details – Order And Item Costs
P_RTOCD_ORDERANDITEMCOSTS1 COMPOSITE Real-Time Order Cost Details – Order And Item Costs
P_RTOCD_ORDERANDITEMCOSTS2 COMPOSITE Real-Time Order Cost Details – Order And Item Costs
P_RTOCD_ORDERANDITEMCOSTS3 COMPOSITE Real-Time Order Cost Details – Order And Item Costs
P_RTOCD_ORDERANDITEMCOSTS4 COMPOSITE Real-Time Order Cost Details – Order And Item Costs
P_RTOCD_ORDERANDITEMCOSTS5 COMPOSITE Real-Time Order Cost Details – Order And Item Costs
P_RTOCD_ORDERITEMACTUAL COMPOSITE Order and Item Actual Costs
P_RTOCD_ORDERITEMACTUAL1 COMPOSITE Order and Item Actual Costs Layer 1
P_RTOCD_ORDEROUTPUTQTY COMPOSITE Real-Time Order Output Quantity
P_RTOCD_ORDEROUTPUTQTY1 COMPOSITE Real-Time Order Output Quantity
P_RTOCD_ORDERTARGET COMPOSITE Real-Time Order Cost Details – Target Costs
P_RTOCD_PLANTARGET COMPOSITE Real-Time Order Cost Details – Plan Target
P_RTWIP_FINALPRODUCTCOST1 COMPOSITE Real-Time Work In Process Final Product Cost
P_RTWIP_FINALPRODUCTCOST2 COMPOSITE Real-Time Work In Process Final Product Cost
P_RTWIP_FINALPRODUCTCOST3 COMPOSITE Real-Time Work In Process Final Product Cost
P_RTWIP_FINALPRODUCTCOST4 COMPOSITE Real-Time Work In Process – Final Product Cost
P_RTWIP_ORDERHEADERANDITEM COMPOSITE Real-Time Work in Process Order Header and Item
P_RTWIP_PRODUCTIONORDER COMPOSITE WIP: Production Order
P_SALESORDERFLFMTISSUEUNION COMPOSITE SOFM Issue Union
P_SALESORDERINSUPPLYMFGISSUE1 COMPOSITE SOFM Manufacturing Issue 1
P_SALESORDERINSUPPLYMFGISSUE2 COMPOSITE SOFM Manufacturing Issue 2
P_SCHEDCHNGOPERSLIVECACHEMAP COMPOSITE Map changed operation detail to LC format
P_SCHEDOPERATIONS COMPOSITE Scheduled Operation details
P_SCHEDOPERATIONS_VERSION_2 COMPOSITE Schedule Production Operations
P_SCHEDOPERSLIVECACHEMAP COMPOSITE Map operations to liveCache form
P_SCHEDORDEXTDDETS COMPOSITE Schedule Production Orders Extended Details
P_SCHEDPRODNDISPATCHORDERDETS COMPOSITE Schedule Production Orders Extended Details
P_SCHEDPRODNOPERATIONBASIC COMPOSITE Operation Basic Data
P_SCHEDPRODNOPERATIONDURN COMPOSITE Operation Duration
P_SCHORDERDETS COMPOSITE Schedule production order details
P_SFICONFIRMATION COMPOSITE SFI Confirmations in Detail
P_SFICONFTIMETOTALS COMPOSITE SFI Confirmation Time Totals
P_SFILEADTIMEPERSTATUSAGG COMPOSITE SFI Lead Time per Status – aggregated
P_SLSORDFLFMTPROCESSFLOW11 COMPOSITE SOFM Process Flow 1.1
P_SOFAPROCFLOW11 COMPOSITE SOFA Process Flow:: Level +1 Manufacturing Order
P_SRVCCONTRGLACCTSUMCARD COMPOSITE Service Contract Finance Cube
P_SRVCDOCINTORDFINCNVRSNDATA COMPOSITE Service Document Internal Order Finance Conversion Data
P_SRVCDOCINTORDFINDATA COMPOSITE Service Document Internal Order Finance Data
P_SS_DUEDAYS COMPOSITE ServiceSheet Overdue for Approval
P_STATISTICALKEYFIGUREITEM COMPOSITE Statistical Key Figure Items
P_STSTCLKEYFIGVALUEACTIVEITEM COMPOSITE P View for SKFV Active Item
P_SUPDMNDALLDOCOVW COMPOSITE Overview of Demand and Supply
P_TOTRQDCAPACITYBKWDWRKCTR COMPOSITE Total Required Capacity for Work Center
P_TOTRQDCAPACITYFORWRKCTR COMPOSITE Total Required Capacity for Work Center
P_TRACKTOOLUSAGEOAPRT COMPOSITE PRT NAMES ASSIGNED TO OA
P_TRACKTOOLUSAGEOAPRTASSIGNED COMPOSITE PRT IDs Assigned To OA
P_TRACKTOOLUSAGEOATTUCLAIMED COMPOSITE GET CLAIMED OA EQUIPENTS
P_VI_DUEDAYS COMPOSITE Vendor Invoice DueDays
P_VP_DUEDAYS COMPOSITE Vendor Payment Duedays
P_WBSORDERS COMPOSITE Private basic view for tabNetwork\Orders in WBSElement app
P_WORKCENTERCAPACITYEVAL COMPOSITE WorkCenter – Capacity Evaluation
P_WORKCENTERCAPEVALSHIFT COMPOSITE WorkCenter Capacity Evaluation
P_WORKCENTERCAPMAXMINDTE COMPOSITE Get the Minimum and Maximum date for orders of a capacity
P_WORKCENTERCAPPPLINEOP COMPOSITE Load day opr for manufacturing and planned order for Cap
P_WORKCENTERCAPREQS COMPOSITE Load day opr for manufacturing and planned order for Cap
P_WORKCENTERCAPSHIFTOP COMPOSITE Loaded Orders per shift for capacity
P_WORKCENTEROPDISTRPCT COMPOSITE WorkCenter- Operation Total capactiy
P_WORKCENTERPRODUCTCOST COMPOSITE Private View for Product Cost By Work Center
P_WORKCENTERTARGETCOSTS COMPOSITE Target Costs by Work Center
P_WORKREQUESTORDERUNION COMPOSITE Private view for Order and Notification
P_WPMO_PROJCOSTLINEITEMS COMPOSITE PPM Project Cost Line Items
P_WRKCTRCAPCITYEVALAGGRGD COMPOSITE WorkCenter Capacity Evaluation
P_WRKCTRCAPEVALWRKDAYS COMPOSITE Capacity Load Distribution with working days
P_WRKCTRCAPNIGHTSAGGRGD COMPOSITE WorkCenter Capacity Evaluation
P_WRKCTRCAPOPDATERANGE COMPOSITE Work Center operations in given date range
P_WRKCTRCAPOPWITHNIGHTS COMPOSITE Load all opr for manuf and planned order for Cap with shifts
P_WRKCTRCAPOPWRKDAYS COMPOSITE Capacity Load Distribution with working days
P_WRKCTRCAPREQSINSECS COMPOSITE Work Center operations in given date range
P_WRKCTRMNTRMINORDEROPERATION COMPOSITE P View For Min Order Operation
P_WRKCTRMNTRORDERCALCFIELDS COMPOSITE Calculate Order Operation Days and Seconds Fields
P_WRKCTRMNTRPACEMAKERORDERS COMPOSITE Pacemaker Orders
P_WRKCTROPSHIFTLOADAGGRGD COMPOSITE Load Distribution at shift level for operations
P_WRKCTROPSHIFTLOADDISTR COMPOSITE Load Distribution at shift level for operations
P_WRKCTRSHIFTWITHREQ COMPOSITE WorkCenter available Capacity with operations
R_MAINTENANCEORDEROPERATIONTP COMPOSITE Maintenance Order Operation TP
R_MAINTENANCEORDERTP COMPOSITE Maintenance Order TP
C_ACCRSUBOBJITMWTHACCTASGT CONSUMPTION Accrual Subobject Item with Account Assignment
C_ACCRSUBOBJITMWTHPERDCAMOUNTS CONSUMPTION Accrual Subobject Item with Periodic Amounts
C_ACTIVEPROJECTCOSTSBYMONTHOVW CONSUMPTION Active Project Costs By Months
C_ACTYTYPERCVGORDITM CONSUMPTION Receiving Orders Line Items
C_APPROCESSFLOWJOURNALENTRYITM CONSUMPTION Journal Entry Document Item details for AP process flow
C_ARPROCESSFLOWJOURNALENTRYDOC CONSUMPTION Journal Entry Document details for AR process flow
C_ARUNANLYTSSUPDMNDOVWQRY CONSUMPTION Overview of Supply and Demand Query
C_ARUNANLYTSTOTSUPQRY CONSUMPTION Total Supply of all Document Types Query
C_ASSETASSIGNMENTTP CONSUMPTION Asset Assignment
C_CACHEMRPMFGORDER CONSUMPTION MRP Manufacturing Orders
C_CAPEVALPOOLEDCAPACITYOPS CONSUMPTION Workcenter Pooled Capacity Operations
C_CAPEVALPPLINEOP CONSUMPTION Load all order operations for a capacity
C_CHANGERECORDOBJPGPRODNORD CONSUMPTION Change Record Reference Object Page Prodn Ord
C_CHFIEXPRODNORDCONFIGN CONSUMPTION Production Order Config
C_CHGIMPACTNTWKDETS CONSUMPTION Network Order Details
C_CHGIMPACTPRODNORDDETS CONSUMPTION Mfg BOM linked with Production orders
C_CNSLDTNACCTGMASTERDATA CONSUMPTION Consolidation – Accounting Master Data
C_CNSLDTNMASTERDATA CONSUMPTION Consolidation – Combined Master Data
C_CNSLDTNORDERVH CONSUMPTION Order Value Help
C_CONTRACTITEMACCTMNTR CONSUMPTION Purchase Contract Items by Account Assignment
C_CONTROLLINGSETTLEMENTRULE CONSUMPTION Controlling Settlement Rule
C_COPCCORDERANDITEMCOSTSCUBE CONSUMPTION CO PCC Order and Item Costs Cube
C_COPRODUCTCOSTBYORDER1 CONSUMPTION CO Product Cost By Order
C_COPRODUCTCOSTBYORDER2 CONSUMPTION CO Product Cost By Order
C_COPRODUCTCOSTBYORDERANDITEM CONSUMPTION CO Product Cost By Orders and Items
C_COSTATUSOBJECTACTIVESTATUS CONSUMPTION Status Object Active Status
C_COSTCENTERBUDGET CONSUMPTION Cost Center Budget Report
C_COSTCENTERPLANACTQ2001 CONSUMPTION Cost Center – Plan/Actual
C_CTRLGSETTLEMENTDOCUMENT CONSUMPTION Display Settlement Documents
C_CUSTOMER360_ISSUES CONSUMPTION Customer 360 Issues
C_DEFECTRECORD CONSUMPTION Record Defect
C_DEFECTRECORDAFFECTEDOBJECT CONSUMPTION Object Affected by Defect
C_DSPDOCFLWANCHORDOCVH CONSUMPTION Anchor Document VH for DDF
C_DSPDOCFLWMFGORDERVH CONSUMPTION Manufacturing Order VH for DDF
C_DSPDOCFLWPRODNCONFATTRIB CONSUMPTION Prodn/Proc Ord Conf Attributes for DDF
C_DSPDOCFLWPRODUCTIONATTRIB CONSUMPTION Production/Proc Order Attributes for DDF
C_EARMARKEDFUNDSDOCITEMAPPRVL CONSUMPTION Earmarked Funds Approval, Line Items
C_EARMARKEDFUNDSITEMA_APPRVL CONSUMPTION Earmarked Funds Item Approval, Account Assignments
C_EARMARKEDFUNDSITEMD_APPRVL CONSUMPTION Earmarked Funds Item Approval, other items
C_EARMARKEDFUNDSITEM_APPROVAL CONSUMPTION Earmarked Funds Item Approval, to be approved
C_EARMARKEDFUNDS_OBJP CONSUMPTION Additional Selection – Earmarked Funds
C_EMRKDFNDSITMFOROBJPWST CONSUMPTION Auxiliary Cosumption view for EF with Session Languate texts
C_EVENTBASEDORDERKPI CONSUMPTION Consumption view of Event Bsed WIP Inspector
C_EVENTBASEDWIPLOGHEADER CONSUMPTION Event-Based WIP Order Application Log Header
C_FIXEDASSETASSGMTMAINTAIN CONSUMPTION Consumption View of Fixed Asset Maintain – Assignment Data
C_FLDLOGSWORKORDERVH CONSUMPTION Work Order Value Help Non-Teco Orders
C_FLXMTPLOBJVARPROJNTWKACTYTP CONSUMPTION Network Activity for Variant
C_FUNCTIONALAREAPLANACTQ2801 CONSUMPTION Functional Area – Plan/Actual
C_FXDASTASSGMTCURRENTMNTN CONSUMPTION Cons. View of Fixed Asset Edit – Assignment by Current Date
C_GENERICPLANQ3001 CONSUMPTION Financial Plan Data
C_INSPCHARCMLTPLRSLTREC CONSUMPTION Insp Charac for Mltpl Rslt Recording
C_INSPLOTMLTPLRSLTREC CONSUMPTION Inspection Lots for Mltpl Rslt Recording
C_INSPRESULTMLTPLRSLTREC CONSUMPTION Recorded Results for Mltpl Rslt Rec
C_INSPRSLTVALUEMLTPLRSLTREC CONSUMPTION Single Results for Mltpl Rslt Recording
C_INTERNALORDERPLANACTQ2101 CONSUMPTION Internal Order – Plan/Actual
C_INTERNALORDERQ0001 CONSUMPTION Internal Order
C_JOINTVENTUREORDERDATA CONSUMPTION Joint Venture Order Data
C_JVAACTLBDGTFOROPLEXPENSESOVW CONSUMPTION Actual Cost & JV Budget for Opex Expense
C_JVAACTUALBUDGETOVERVIEW CONSUMPTION Actual Cost and JV Budget Overview
C_JVAACTUALCAPITALEXPNDTROVW CONSUMPTION Actual Cost & Capital Expenditure Ovw
C_MAINTENANCEORDERWRKFLWINBOX CONSUMPTION Maintenance Order Workflow for My Inbox
C_MAINTNOTIFFORSCREENINGQ CONSUMPTION Maintenance Notifications for Screening
C_MAINTOBJBREAKDOWNQUERY CONSUMPTION Maintenance Object Breakdown Query
C_MAINTOBJBREAKDOWNSIMPLQ CONSUMPTION Technical Object Breakdown (Simple)
C_MAINTORDACTLPLNDCOSTQUERY CONSUMPTION Maint. Order Actual Planned Cost Query
C_MAINTORDACTUALCOSTDATAQ CONSUMPTION Maintenance Order Actual Cost Data Query
C_MAINTORDCOMPPURORDERITEM CONSUMPTION Purchase Orders for Plant Maintenance
C_MAINTORDCOMPPURORDERQ CONSUMPTION Purchase Orders for Maintenance Orders
C_MAINTORDCOMPPURREQITEM CONSUMPTION Purchase Requisitions for Plant Maintenance
C_MAINTORDCOMPPURREQUISITIONQ CONSUMPTION Purchase Requisitions for Maintenance Orders
C_MAINTORDCONFFORCREATETP CONSUMPTION Consumption View for Maintenance Order Confirmation Create
C_MAINTORDCONFMESSAGETP CONSUMPTION Consumption View for Maintenance Order Confirmation Messages
C_MAINTORDERACTLPLNDCOSTITEM CONSUMPTION Detailed Cost Analysis in Maint. Order
C_MAINTORDERACTUALCOSTQ CONSUMPTION Maintenance Order Actual Cost Query
C_MAINTORDERCOMPONENTTP CONSUMPTION Maintenance Order Component with Draft
C_MAINTORDERCONFIRMATIONTP CONSUMPTION Maintenance Order Confirmation
C_MAINTORDERFORACTION CONSUMPTION Maintenance Order Operation for Action
C_MAINTORDERFORCOMPLETIONQ CONSUMPTION Orders for Completion
C_MAINTORDERFORSAFETYINSIGHTS CONSUMPTION Maintenance Orders for Safety Insights
C_MAINTORDEROPERATIONTP CONSUMPTION Maintenance Order Operation with Draft
C_MAINTORDEROPFORACTION CONSUMPTION Maintenance Order Operation for Action
C_MAINTORDEROUTPUTPARAMDETN CONSUMPTION Maintenance Order Output Management Parameter Determination
C_MAINTORDERQUICKVW CONSUMPTION Maintenance Order Operation Quick View
C_MAINTORDERSFORPLANNINGQ CONSUMPTION Maintenance Orders for Planning
C_MAINTORDERSUBOPFORACTION CONSUMPTION Maintenance Order Operation for Action
C_MAINTORDERTECHOBJQUERY CONSUMPTION Maint. Order Analysis Query w. Techn.Obj
C_MAINTORDERTP CONSUMPTION Maintenance Order with Draft
C_MAINTORDFORTECHOBJQUICKVW CONSUMPTION Maintenance Order based on Technical Object
C_MAINTPLANOBJPGCALLOBJECT CONSUMPTION Call Objects in Maintenance Plan Object Page
C_MALFUNCTIONREPORT CONSUMPTION Repair Malfunction Job List
C_MALFUNCTIONREPORTINVLMNTS CONSUMPTION Malfunction Report User Involvements
C_MALFUNCTIONREPORTWORKITEM CONSUMPTION Malfunction Report Work Items
C_MANAGEOPERATIONS CONSUMPTION Production Operations
C_MANAGEPRODUCTIONORDER CONSUMPTION Production Orders
C_MARKETSEGMENTPLANACTQ2501 CONSUMPTION Market Segment – Plan/Actual
C_MASTERPROJECTACTIVITY CONSUMPTION Commercial Project Activity Detail
C_MASTERPROJECTBASICDATA CONSUMPTION Basic Data – Single Project Overview Screen
C_MFGBUYOFFLIST CONSUMPTION Buy Off Cycle Inbox
C_MFGBUYOFFMATERIALVH CONSUMPTION Buy Off Material Value Help
C_MFGBUYOFFMATLSRLNMBRVH CONSUMPTION BuyOff Material Serial Number Value Help
C_MFGBUYOFFVH CONSUMPTION Buyoff Value Help
C_MFGEXECDEFECTRECORD CONSUMPTION View with UI attributes for defect
C_MFGEXECEVENTHISTORY CONSUMPTION Manufacturing Execution Event History
C_MFGORDACTLPLANTGTCOSTQRY CONSUMPTION Query view for MfgOrder PlanActTgt cost
C_MFGORDCOMPEXCSCONSMPTQRY CONSUMPTION Mfg Order Operation Component Excess Consumption Query
C_MFGORDERCONFIRMATION CONSUMPTION Manufacturing Order Confirmation
C_MFGORDERDEFECTRECORD CONSUMPTION Consumption view for defect
C_MFGORDEROBJPG CONSUMPTION Manufacturing Order Object Page
C_MFGORDEROBJPGCOMP CONSUMPTION Manufacturing Order Object Page Com
C_MFGORDEROBJPGCONTACTS CONSUMPTION Mfg Order Object Page Contacts
C_MFGORDEROBJPGOPR CONSUMPTION Manufacturing Order Opr : Object Page
C_MFGORDEROBJPGPRT CONSUMPTION PRT for Orders
C_MFGORDEROBJPGSTATUS CONSUMPTION Manufacturing Order Operations Status
C_MFGORDEROPERATIONFORCONF CONSUMPTION Mfg Order Operation for Confirmation
C_MFGORDEROPERATIONHOLD CONSUMPTION Active Production Holds of a Production Order Operation
C_MFGORDEROPERATIONMISSINGCOMP CONSUMPTION Mfg Order Operation Missing Component
C_MFGORDEROPEXECDURNQRY CONSUMPTION Mfg Order Operation Execution Duration Query
C_MFGORDEROPROBJPG CONSUMPTION Production Order Operations Object Page
C_MFGORDEROPROBJPGCNF CONSUMPTION Mfg Order Operations Confirmation
C_MFGORDERSFILEADTIMEQRY CONSUMPTION Mfg Order SFI Lead Time Query
C_MFGORDERSHOPFLOORITEM CONSUMPTION Manufacturing Order Shop Floor Item
C_MFGORDERWIPVARIANCEQUERY CONSUMPTION Query view for manufacturing order WIP / Variance
C_MFGORDINSPCHARRESULTREC CONSUMPTION Order Result Record Details
C_MFGORDOPCONFSCRAPREASONQ CONSUMPTION Mfg Order Operation Confirmation Scrap Reason Query
C_MFGORDOPDETSFOROPACTYEXEC CONSUMPTION Manufacturing order operation details for OA execution
C_MFGORDOPERATIONSCRAPQRY CONSUMPTION Manufacturing Order Operation Scrap Query
C_MFGORDOPFORREWORKINSERTION CONSUMPTION Order operation for rework insertion
C_MFGORDPLANINSPCHARINFO CONSUMPTION Order PIC Info
C_MFGPROCGEXECOPERATION CONSUMPTION Manufacturing Order Operation
C_MFGQUALIFNOPACTYASSGMT CONSUMPTION Qualification Assignment to OA
C_MFGWORKINSTRUCTIONVERSION CONSUMPTION Work Instruction Consumption View
C_MILESTONEBASICINFO CONSUMPTION Project Milestone Basic Information
C_MILESTONEWITHVERSION CONSUMPTION Additional Selection – Milestone
C_MNGPRODNORDERMFGORDER CONSUMPTION Manufacturing Order
C_MNTRWRKCTROPERATIONPHASES CONSUMPTION CDS for phases in Process/Planned Orders
C_MPEPRODNORDEROPERATIONPOVER CONSUMPTION Production Order Operations Popover
C_MPEPRODNORDERPOVER CONSUMPTION Production Order Popover
C_MPEWORKCENTERPOVER CONSUMPTION Work Center Popover
C_MRPMAINTENANCEORDERCOMPONENT CONSUMPTION MRP Maintenance Order Component
C_MRPMANUFACTURINGCOMPONENT CONSUMPTION MRP Manufacturing Component
C_MRPMFGORDER CONSUMPTION MRP Manufacturing Order
C_MRPORDERCOMPONENT CONSUMPTION Mfg Component and Maint Component
C_MSTRPROJACTLCALMNTHCOSTQTY CONSUMPTION Commercial Proj Actual Cost Qty by Month
C_MSTRPROJMYACTIVITIES CONSUMPTION Master Project My Activities
C_MSTRPROJPRCOUNT CONSUMPTION Count of PRs or Master Project
C_MSTRPROJPURORDITEM CONSUMPTION Consumption View for Master Project Purchase Order Item
C_MSTRPROJPURREQITEM CONSUMPTION Master Project Purchase Requisition Item
C_NETWORKACTIVITYBASICINFO CONSUMPTION Network Activity Basic Information
C_NETWORKACTIVITYVALUEHELP CONSUMPTION Network Activity Value help
C_NETWORKACTIVITYWITHVERSION CONSUMPTION Additional Selection – Network Activity
C_NONREALTIMEPRODNCOSTORDERVH CONSUMPTION Non Real Time PCC Order Value Help
C_NTWKACTIVITYGRAPHBASICDATA CONSUMPTION Basic Data of Network Activity for Graph
C_NTWKACTIVITYGRAPHOVERVIEW CONSUMPTION Network Activity Graph Overview
C_OBJPGMAINTNOTIFICATION CONSUMPTION Maintenance Notification
C_OBJPGMAINTORDER CONSUMPTION Maintenance Order
C_OBJPGMAINTORDERANDOPERATION CONSUMPTION Maintenance Order and Operation
C_OBJPGMAINTORDERCONFIRMATION CONSUMPTION Maintenance Order Confirmation
C_OBJPGMAINTORDEROPAGGRGDATA CONSUMPTION Maintenance Order Operation Aggregate Data
C_OBJPGMAINTORDEROPERATION CONSUMPTION Maintenance Order Operation
C_OBJPGMAINTORDEROPMATERIAL CONSUMPTION Maintenance Order Operation Material
C_OBJPGMAINTORDERWTHDESC CONSUMPTION Maintenance Order with Description
C_OBJPGMAINTORDOPPRODNRSCETOOL CONSUMPTION Maintenance Order Operation Production Resources/Tools
C_OBJPGTECHNICALOBJECT CONSUMPTION Technical Object
C_OPERATIONACTIVITYCOMPONENT CONSUMPTION Operation Activity Component
C_OPERATIONACTIVITYPLNDMATLRET CONSUMPTION Operation Activity Component
C_OPERATIONACTIVITYWORKLISTTP CONSUMPTION Personal Work Queue
C_OPERATIONACTYCOMPONENTLIST CONSUMPTION Component assigned to Operation Activity
C_OPERATIONACTYPRTASSIGNMENT CONSUMPTION Shop Floor Item At Operation Activity
C_OPERATIONCOMPONENTS CONSUMPTION Components
C_OPERATIONCONFIRMATIONS CONSUMPTION Operation Confirmations
C_ORDERMASTERVH CONSUMPTION Order Master Value Help
C_ORDEROPERATIONSCHEDULE CONSUMPTION Order Operation Schedule
C_ORDERREALTIMEPRODUCTIONCOST CONSUMPTION Event-Based Production Costs
C_ORDERWORKCENTERSCHEDULE CONSUMPTION Order Operation Work Center Schedule
C_ORDHDRITMREALTIMEPRODNCOST CONSUMPTION Order Header and Item Real Time Production Cost
C_OVERDUEMAINTENANCEORDERQ CONSUMPTION Overdue Maintenance Orders
C_PCCORDERGENERALINFORMATION CONSUMPTION PCC Order General Information
C_PPM_PRSTCMRPROJBYKEYFIGURES CONSUMPTION Projects By Key Figures
C_PROCESSORDEROBJPG CONSUMPTION Process Order Object Page
C_PROCESSORDEROBJPGOPR CONSUMPTION Manufacturing Order Opr : Object Page
C_PROCGEXECOPACTYINSTCETP CONSUMPTION Processing Execution Operation Activity Instance
C_PROCGEXECOPERATIONACTIVITY CONSUMPTION Operation Activity
C_PROCGEXECOPERATIONACTYLIST CONSUMPTION Operation Activity List
C_PROCORDERCONFOBJPG CONSUMPTION Process Order Confirmation Object Page
C_PRODNORDERFORSAFETYINSIGHTS CONSUMPTION Production Orders for Safety Insights
C_PRODNORDOPFORSAFETYINSIGHTS CONSUMPTION Production Order Operations for Safety Insights
C_PRODNPLNGDEPDNTRESVNQUICKVW CONSUMPTION Dependent Requirement and Order Reservation Details
C_PRODNPLNGPRODNORDQUICKVIEW CONSUMPTION Quick view data for Production Order
C_PRODORDCONFOBJPG CONSUMPTION Production Order Confirmation Object Page
C_PRODUCTCOSTBYORDERQUERY CONSUMPTION Production Cost By Order
C_PRODUCTIONORDERHOLD CONSUMPTION Active Production Holds of Production Orders
C_PROFITANDLOSSPLANACTQ2903 CONSUMPTION P&L – Plan/Actual
C_PROFITCENTERPLANACTQ2701 CONSUMPTION Profit Center – Plan/Actual
C_PROJBDGTCNSMPNDETSCOPILOT CONSUMPTION Project Cost Details
C_PROJCOSTBYCOSTCOMP CONSUMPTION Project cost by Cost Component
C_PROJCOSTBYCOSTCOMPCHART CONSUMPTION Project Costs by Cost Component
C_PROJECTBUDGETCONSUMPTION CONSUMPTION Project Budget Consumption
C_PROJECTBUDGETREPORT CONSUMPTION Project Budget Report
C_PROJECTBUDGETREPORTLINEITEMS CONSUMPTION Project Budget Report – Line Items
C_PROJECTCOSTLINEITEMS CONSUMPTION Project Cost Line Items
C_PROJECTCOSTPREDICTION CONSUMPTION Project cost prediction
C_PROJECTCOSTSTODATE CONSUMPTION Project Costs to Date
C_PROJECTFINANCIALREPORT CONSUMPTION Actual/Planned LineItems for Project
C_PROJECTFINANCIALSUMMARY CONSUMPTION Monitor Projects
C_PROJECTNETWORKBASICINFO CONSUMPTION Project Network Basic Information
C_PROJECTNETWORKGRAPHOVERVIEW CONSUMPTION Project Network Graph Overview
C_PROJECTNETWORKRELATIONSHIP CONSUMPTION Project Network Relationship
C_PROJECTNTWKVALUEHELP CONSUMPTION Value Help for Project Network
C_PROJECTPLANACTQ2201 CONSUMPTION Project – Plan/Actual
C_PROJECTPLANACTQ2203 CONSUMPTION Projects – Baseline/EAC/Ongoing
C_PROJMATCOMPONENTWITHVERSION CONSUMPTION Additional SelectionΓÇôMaterial Component
C_PROJMATLCOMPBASICINFO CONSUMPTION Project Material Component Basic Information
C_PROJNETWORKWITHVERSION CONSUMPTION Additional Selection – Network
C_PROJOVRLBUDGETCONSUMPTION CONSUMPTION Projects with Overall Budget Costs
C_PROJPURDOCITEMS CONSUMPTION Purchasing Document Item Details
C_PURCHASEORDERITEMACCTMNTR CONSUMPTION Purchase Order Items by Account Assignment
C_PURREQITEMACCTMNTR CONSUMPTION PR Items by Account Assignment
C_QM_INSPCHARINFO CONSUMPTION Characteristic details- More information
C_QM_INSP_CHARACTERISTIC CONSUMPTION Inspection Characteristic
C_REACCTGOBJECTPLANACTUALQ CONSUMPTION Real Estate Objects Plan and Actuals Q
C_REALTIMEMFGORDERLOG CONSUMPTION Analyze Event-Based WIP and Variance Exceptions Log
C_REALTIMEMFGORDERPOSTEDKPI CONSUMPTION Consumption view of Event-Based WIP and Variance Exceptions
C_REALTIMEMFGORDERTOBEPOSTDKPI CONSUMPTION Consumption view of Event-Based WIP and Variance Exceptions
C_REALTIMEORDCOSTCOMPGRPDETAIL CONSUMPTION Real-Time Order Costs Details – Cost Component Groups
C_REALTIMEORDERACTIVESTATUS CONSUMPTION Event Based Order Active Status
C_REALTIMEORDERCOST CONSUMPTION Event-Based Order Costs
C_REALTIMEORDERCOSTDETAIL CONSUMPTION Real-Time Order Costs Detail
C_REALTIMEORDERCOSTINFORMATION CONSUMPTION Order Cost Information
C_REALTIMEORDERCOUNT CONSUMPTION Event Based Order Real Time KPI Count
C_REALTIMEORDEREXCEPTIONSTATUS CONSUMPTION Real-Time Order Cost Exception Status
C_REALTIMEORDEROUTPUTQUANTITY CONSUMPTION Real-Time Order Output Quantity
C_REALTIMEPRODNCOSTCOMPGROUP CONSUMPTION Real Time Production Cost Component Groups
C_REALTIMEWORKINPROCESS CONSUMPTION Event-Based Work in Process
C_REALTMEWRKINPROCCHGDBYVH CONSUMPTION Real Time Work in Process Changed By Value Help
C_REALTMEWRKINPROCCRTEDBYVH CONSUMPTION Real Time Work in Process Created By Value Help
C_REALTMEWRKINPROCDAYHISTORY CONSUMPTION Real-Time Work In Process Last Days History
C_REALTMEWRKINPROCMNTHHISTORY CONSUMPTION Real-Time Work In Process Last Months History
C_REALTMEWRKINPROCPRODNORDVH CONSUMPTION Production Order Value Help
C_REALTMEWRKINPROCRLTVDAYHIST CONSUMPTION Real-Time Work In Process Relative History in Last Days
C_REEXASSIGNINTERNALORDER CONSUMPTION Internal Order
C_RESOURCEOBJPGQUEUEOP CONSUMPTION Queuing operations for Resources
C_RESOURCEOBJPGTODAYOP CONSUMPTION Todays Operations for Resources
C_RSHDUEORDERBYPRIORITYKPI CONSUMPTION Due maintenance orders by priority
C_RSHEAMUSERVARIANT CONSUMPTION Work Centers Assigned to Me
C_RSHEDITWORKCENTERVH CONSUMPTION Value help for Work center change
C_RSHMAINTASSETBOARD CONSUMPTION Maintenance Asset Board
C_RSHMAINTASSETBOARDSHAPES CONSUMPTION Maintenance Asset Board shapes
C_RSHMAINTOPERATIONASSIGNMENT CONSUMPTION Maintenance Order Operations
C_RSHMAINTSCHEDFROZENOP CONSUMPTION Operations to be displayed in frozen schedule
C_RSHMAINTSCHEDMISSINGWRKCTR CONSUMPTION Unassigned Work Centers in Schedule
C_RSHMAINTSCHEDSMLTDOP CONSUMPTION Maint Scheduling Simulation Operations
C_RSHMAINTSCHEDSMLTDOPRELSHP CONSUMPTION Operation Relationships for display on the Gantt Chart
C_RSHMAINTSCHEDSMLTDORDANDOP CONSUMPTION Maint Scheduling Simulation Operations
C_RSHOPERATIONACTIVEUSERSTATUS CONSUMPTION Maintenance order active status
C_RSHOPERATIONDETAILS CONSUMPTION maintenance order operation long text
C_RSHOPERATIONRELATIONSHIPS CONSUMPTION Operation Relationships for display on the Gantt Chart
C_RSHOPERATIONS CONSUMPTION Maintenance Operations
C_RSHOPERATIONVALIDATION CONSUMPTION Message for operation list
C_RSHOPINMAINTSCHEDSIMULATION CONSUMPTION Operations in Maintenance Scheduling Simulation
C_RSHOPUNASSIGNEDWORK CONSUMPTION Unassigned Work Overview
C_RSHOPUNASSIGNEDWORKKPI CONSUMPTION Operations unassigned work KPI
C_RSHORDERACTIVEUSERSTATUS CONSUMPTION Maintenance order active status
C_RSHORDERDETAILS CONSUMPTION Maintenance order long text details
C_RSHORDERPRIORITYVH CONSUMPTION Value Help for Order Priorities
C_RSHORDERS CONSUMPTION Maintenance Orders
C_RSHORDERSANDOPERATIONS CONSUMPTION Maintenance Orders and Operations
C_RSHORDERSKPI CONSUMPTION Maintenance Orders KPIs
C_RSHPASTORDERSKPI CONSUMPTION Past Maintenance orders
C_RSHSMLTDWRKCTRUTILPERWEEK CONSUMPTION Utilization of Work Center per week basis
C_RSHSMLTDWRKCTRUTILZNPERDAY CONSUMPTION Work Center Utilization Per Day
C_RSHWCUTILIZATIONOVERVIEW CONSUMPTION Work Center Utilization
C_RSHWRKCTRUTILIZATIONKPI CONSUMPTION Work Center Utilization Overview
C_RUNOVERHEADMAINTENANCEORDER CONSUMPTION Overhead Calculation Maintenance Order
C_RUNSETTLEMENTACTUALPROJECT CONSUMPTION Project list for actual settlement
C_RUNSETTLMTACTLMAINTORDER CONSUMPTION Actual Settlement Maintenance Order
C_RUNSETTLMTACTUALSTATISTIC CONSUMPTION Run Settlement – Actual
C_SALESORDERFULFILLMENTISSUEQ CONSUMPTION SOFM Issue Query
C_SCHAGRACCOUNT CONSUMPTION Scheduling Agreement Account Assignment
C_SCHEDAGRMTACCT CONSUMPTION Account Assignment Consumption view
C_SCHEDPRODNDSPTCHDOPS CONSUMPTION Dispatched operations
C_SCHEDPRODNOPERATIONPHASES CONSUMPTION CDS for phases in Process/Planned orders
C_SCHEDPRODNPEGGINGORDERDETS CONSUMPTION Schedule production pegging order details
C_SCHEDPRODNPRODVERSDAY CONSUMPTION Production Versions In Day Bucket
C_SCHEDPRODNPRODVERSSHIFT CONSUMPTION Production versions in shift bucket
C_SCHEDPRODNPRODVERSWEEK CONSUMPTION Production Versions In Week Bucket
C_SCHEDPRODNWORKLIST CONSUMPTION Worklist for Scheduling Productions
C_SCHEDPRODNWRKCTRMNTROPS CONSUMPTION ERP and Live Cache Operations
C_SCHEDPRODNWRKCTRSQNCVH CONSUMPTION Work Ctr Filter for dispatch by sequence
C_SETTLEMENTACTUALSETTLEDVALUE CONSUMPTION Project list for actual settlement
C_SETTLMTACTLSETLDVALPUBSEC CONSUMPTION Settled values with public sector fields
C_SFIATOPACTYPLNDMATLRET CONSUMPTION Shop Floor Item At OA Planned Material Return
C_SFIOPACTYINSPCHARCSAGGRG CONSUMPTION Inspection Characteristics for SFI OA
C_SFIOPACTYINSTCEEQUIPACTVREGN CONSUMPTION Active Equipment Registration at OA Instance
C_SFIOPACTYPRTASSIGNMENT CONSUMPTION Shop Floor Item At Operation Activity
C_SFIPLANINSPCHARINFO CONSUMPTION SFI Plan Insp Char Information
C_SFIPLANINSPCHARRESULTREC CONSUMPTION Result recording details of Inspection Characteristics
C_SHOPFLOORITEM CONSUMPTION Serial Number
C_SHOPFLOORITEMATOPACTY CONSUMPTION Shop Floor Item At Operation Activity
C_SHOPFLOORITEMATOPACTYCOMP CONSUMPTION Shop Floor Item At OA Component
C_SHOPFLOORITEMHOLD CONSUMPTION Serial Number Hold
C_SHOPFLOORITEMOPERATION CONSUMPTION Shop Floor Item Operation
C_SHOPFLOORITEMWHEREUSEDLIST CONSUMPTION Shop Floor Item Assembly Parent
C_SHOPFLOORITMOPACTYRESULTRECG CONSUMPTION SFI Operation Activity Data Collection
C_SLSDOCFLFLLMNTANALYZER CONSUMPTION Track Sales Orders
C_SLSDOCFLFMTISSUE CONSUMPTION Sales Order Fulfillment Issues
C_SLSDOCFLFMTMFGORDER CONSUMPTION Sales Doc Fulfillment: Mfg Order
C_SLSDOCFLFMTMFGORDERCONTACTS CONSUMPTION Sales Doc Fulfillment: MFG Order Contacts
C_SLSDOCFLFMTPROCHIERARCHY CONSUMPTION Sales Doc Fulfillment: Hierarchy
C_SLSORDFLFMTINSUPMFGCONTACTQ CONSUMPTION SOFM Sales Order Fulfillment InSupply Manufact.Contact Query
C_SLSORDFLFMTINSUPPLYCONTACTQ CONSUMPTION SOFM Sales Order Fulfillment In Supply Contact Query
C_SLSORDFLFMTMFGORDERQ CONSUMPTION SOFM Manufacturing Order Query
C_SLSORDFLFMTPROCESSFLOWQ CONSUMPTION SOFM Process Flow Query
C_SLSORDPROCFLOW CONSUMPTION Sales Order Process Flow Query
C_SOFULFILLMENTMONITOR_F2200 CONSUMPTION Categorize Sales Orders
C_SRVCCONTRFINANCECARD CONSUMPTION Srvc. Contrct Card -TCV & Profit margin
C_SRVCCONTRFINQUERY_2 CONSUMPTION Finance Data in Service Contract ΓÇô Query
C_SRVCCONTRINTORDERQUERY CONSUMPTION Internal Order of Srvc Contract ΓÇô Query
C_SSPLOGISTICSORDERVH CONSUMPTION Logistics Order Value Help for SSP PR
C_SSPNETWORKACTIVITYVH CONSUMPTION Purchasing Network Activity Value Help
C_SSPPROJECTNETWORKVH CONSUMPTION Network Value Help for local and hub scenario
C_STATISTICALKEYFIGUREITEM CONSUMPTION Statistical Key Figure Items
C_STATKEYFIGALLOBJECT CONSUMPTION Assignments to All Objects
C_STATKEYFIGCOSTCENTER CONSUMPTION Cost Centers
C_STATKEYFIGVALUEASSIGNMENT CONSUMPTION Value Assignments
C_STSTCLKEYFIGUREVALUEITEM CONSUMPTION Statistical Key Figure Value Item
C_STSTCLKEYFIGVALUEACTIVEITEM CONSUMPTION Statistical Key Figure Value Item
C_SUPDMNDALLDOCFILTER CONSUMPTION Filter View for Supply Demand Overview for All Documents
C_SUPDMNDALLDOCOVWQRY CONSUMPTION Query View for Overview of Supply and Demand
C_SUPDMNDALLDOCPRODNORDASSGQ CONSUMPTION Query View for Production Order Assignment Details
C_SUPDMNDALLDOCPRODNORDQ CONSUMPTION Query View for Production Order Details
C_SUPDMNDALLDOCTOTSUPQRY CONSUMPTION Query View for Total Supply of All Document Types
C_SUPDMNDOVWPGFLTR CONSUMPTION Supply and Demand Cockpit Filter
C_SUPDMNDOVWPGTOTSUPQ CONSUMPTION Consumption View for Total Supply of all Sources
C_TECHOBJFLATVH CONSUMPTION Value help for Technical Object details
C_TECHOBJHIERVH CONSUMPTION Value Help for Hierarchical value help
C_TECHOBJMAINTENANCEITEM CONSUMPTION Maintenance Items for Technical Object
C_TECHOBJMAINTENANCEORDER CONSUMPTION Maintenance Orders for Technical Object
C_TECHOBJMAINTNOTIFICATION CONSUMPTION Maintenance Notifications for Technical Object
C_TRACKTOOLUSAGEOPACTYEQUIP CONSUMPTION List of OAs for Equipment
C_TRACKTOOLUSAGETP CONSUMPTION Track Tool Usage
C_USERDEFAULTSELECTIONPARAM CONSUMPTION User Default Selection Paramts for Excel
C_USERDEFAULTSETTINGITEM CONSUMPTION Consumption view for item
C_WBSORDERS CONSUMPTION WBS Element Order Details
C_WHEREUSDPRFTCTRORDER CONSUMPTION Where-Used List – Profit Centers – Order
C_WORKCENTERCAPORDERPERBUCKET CONSUMPTION Load Distribution at shift level for operations
C_WORKCENTERCAPPERBUCKET CONSUMPTION Capacity Evaluation for Workcenter at Shift Level
C_WORKCENTEROBJPGOPRSTATUS CONSUMPTION Work Center Object Page Queueing Operations Count
C_WORKCENTEROBJPGTDYNPRNO CONSUMPTION Work Center Object Todays Page Operation Count
C_WORKCENTERPLANACTLTGTCOST CONSUMPTION Production Cost By Work Center/Operation.
C_WORKCENTERPRODCOSTQUERY CONSUMPTION Production Cost By Work Center
C_WRKCNTROBJPGQUEUEOP CONSUMPTION Work Center Queuing Operation
C_WRKCNTROBJPGTODAYOP CONSUMPTION Work Center Object Page Todays Operation
C_WRKCTRMNTROPERATIONRELATION CONSUMPTION Relationship between Operations
C_WRKCTRMNTROPERATIONSEQUENCE CONSUMPTION Sequence of Order Operations
C_WRKCTRMNTRORDERDETAILS CONSUMPTION Work Center Monitor Order Details
C_WRKCTRMNTRORDEROPERATIONS CONSUMPTION Work Center Monitor Order Operations
C_WRKCTRMNTRRESCHEDULE CONSUMPTION Monitor Work Center Reschedule
C_WRKCTRMNTRRESCHEDULEOPS CONSUMPTION Work Center Reschedule Operations
P_ACTYTYPERCVGORDITM CONSUMPTION Receiving Orderds Line Items – without DCL
P_ARPROCESSFLOWJOURNALENTRYDOC CONSUMPTION Journal Entry Document details for AR process flow
P_CALENDARDATEFORPROJECT CONSUMPTION Private View For Calendar Date
P_CTRLGSETTLEMENTDOCUMENT CONSUMPTION Controlling Settlement Document
P_CTRLGSETTLMTDOCPROJMAXDATE CONSUMPTION Possible senders for settled object
P_CTRLGSETTLMTLASTDOCPROJ CONSUMPTION Last settlement document for Project
P_CTRLGSETTLMTPROJLASTDOCNUMBR CONSUMPTION Possible senders for settled object
P_DEMANDDRIVENOPAGGR CONSUMPTION Latest Operation in Expedite
P_DSPDOCFLWPRODNCONFCOUNT CONSUMPTION Prodn Ord/Proc Conf Attributes for DDF
P_HISTMATERIALMALFUNCMANAGE CONSUMPTION Historic Materials
P_MAINTBACKLOGNONSTKCOMPUNION CONSUMPTION Maintenance Backlog Non Stock Component Union
P_MAINTORDCONFORDERSTATUS CONSUMPTION Order Status for Maintenance Order Confirmation
P_MAINTORDERCOMPLETIONSTATUS CONSUMPTION Maintenance Order Status
P_MAINTORDNMBROFOPENSERVICES CONSUMPTION Maintenance Order Number of Open Services
P_MAINTORDNONSTKCOMPFRMPURREQN CONSUMPTION MaintOrder Component Direct Procurement From Purch. Req.
P_MAINTORDNONSTKCOMPFROMPURORD CONSUMPTION PMaintOrder Component Direct Procurement From Purch. Order
P_MAINTPLNGBCKTORDER CONSUMPTION Auxiliary View for Orders in Planning Bucket
P_MAINTPLNGBCKTORDERCOMPONENT CONSUMPTION Auxiliary View for Order Components in Planning Bucket
P_MAINTPLNGBCKTRESOURCE CONSUMPTION Auxiliary View for Resources in Planning Bucket
P_MANAGEOPERATIONS CONSUMPTION Production Operations
P_MFGCOMPSMISSAGGR CONSUMPTION Group the ComponentIsMissing flags for all components
P_MFGEXECEVENTHISTORYCNSMPN CONSUMPTION Manufacturing Execution Event History
P_MFGORDCOMPMISSAGGR CONSUMPTION Group the ComponentsIsMissing flags for all comps for Order
P_MFGORDERCUSTOM CONSUMPTION Manufacturing Order
P_MFGORDERFIRSTOPERATION CONSUMPTION Manufacturing Order First Operation
P_MFGORDERHEADERHOLD CONSUMPTION Material and order holds of a Manufacturing Order
P_MFGORDERHEADERHOLDUNIONBASIC CONSUMPTION All holds of a Manufacturing Order (that apply to any node)
P_MFGORDEROPDLYBSCMAINSTSINFO CONSUMPTION Mfg Order Operation Delay Basic Data with Main Status
P_MFGORDEROPERATIONCOMPMATL CONSUMPTION Manufacturing Order Operation Component Material
P_MFGORDEROPERATIONFORCONF CONSUMPTION Mfg Order Operation for Confirmation
P_MFGORDEROPERATIONISONHOLD CONSUMPTION Production Order Operation is on hold
P_MFGORDEROPERHOLDUNIONBASIC CONSUMPTION Holds of a Mfg Order that apply on header or operation
P_MFGORDEROPERNUMBEROFHOLDS CONSUMPTION Number of active Prodn Holds of a Production Order Operation
P_MFGORDOPACTYPLANINSPCHAR CONSUMPTION Planned Inspection Characteristics for OA of Order
P_MFGPROCGEXECOPERATION CONSUMPTION PEO Manufacturing Order Operation
P_MPEPRODNORDEROPERATIONPOVER CONSUMPTION Production Order Operation popover
P_MPEPRODNORDERPOVER CONSUMPTION Production Order Popover
P_MPEPRODNORDITMDVTNDURN CONSUMPTION Production Order Item Deviation Duration
P_MPEPRODNORDMATLISMISSING CONSUMPTION Production Order Missing Material
P_MPEPRODNORDMISSINGMATL CONSUMPTION Production Order Missing Material
P_MPEPRODNORDOPERMISSINGMATL CONSUMPTION Production Order Operation Missing Material, private View
P_MPEPRODNORDOPERMISSMATCOUNT CONSUMPTION Production Order Operation Missing Mat Count, private View
P_MPEPRODNORDOPERSTATUSTEXT CONSUMPTION Production Order Operation Status Text, private view
P_MPEPRODNORDOPMATLISMISSING CONSUMPTION Production Order Operation Missing Material
P_MPE_WORKCENTERMATERIAL CONSUMPTION Material for work center
P_MPE_WORKCENTEROPERSTATUS CONSUMPTION Status of operations in a work center
P_OBJPGMAINTORDERANDOPERATION CONSUMPTION Union of Operation and Sub Operation
P_OPACTYCOMPONENTASSIGNMENT CONSUMPTION Operation Activity Instance Component Assignment
P_OPERATIONACTIVITYCOMPONENT CONSUMPTION OA Planned Component, Incl. Unplanned Assemblies
P_OPERATIONACTIVITYCOMPUNION CONSUMPTION OA Planned Component, Incl. Unplanned Assemblies
P_OPERATIONACTIVITYPLNDMATLRET CONSUMPTION Operation Activity Planned Material Return
P_OPERATIONACTYPLNDMATLRETQTS CONSUMPTION Operation Activity Planned Material Return with Quantities
P_OPERATIONACTYPRTASSIGNMENT CONSUMPTION Shop Floor Item At Operation Activity
P_OPERATIONSEQUENCE CONSUMPTION View to retrieve the sequence category branch to and from
P_OPERCOMPMISSINGQTY CONSUMPTION Operation Component Missing Quantity
P_ORDERQTYISSUE CONSUMPTION Order Quantity Issue Calculation
P_ORDFIRSTOPER CONSUMPTION Order First Operation Details
P_ORDLATESTOPER CONSUMPTION Order Latest Operation Details
P_PRODNHOLDAFFCDSFIATOPACTY CONSUMPTION SFI at an OA affected when a production hold was applied
P_PRODUCTIONORDERHOLD CONSUMPTION Manufacturing Execution Event History
P_PROJBDGTCNSMPNDETSCOPILOT CONSUMPTION Project Cost Details
P_PROJCOSTBYCOSTCOMP CONSUMPTION Project Costs By Cost Components
P_PROJCOSTSWITHCALCDMNTH CONSUMPTION Project Costs With Calculated Months
P_PROJECTCOSTSBYFISCALYEAR CONSUMPTION Project Costs by Fiscal Year
P_PROJECTCOSTSBYFISCALYEARPERD CONSUMPTION Project Costs by Fiscal Year Period
P_PROJECTCOSTSINGLOBALCURRENCY CONSUMPTION Project Costs in Global Currency
P_PROJECTCOSTSTODATE CONSUMPTION Project Costs to Date
P_PROJECTPREDICTSUMMRYMAIN CONSUMPTION Project Prediction Summary Main
P_PROJECTPRIORITYCODEVISLFLTR CONSUMPTION Project Priority Code Visual Filter
P_PURREQITEMACCTMNTR CONSUMPTION PR Items by Account Assignment
P_RSHCAPACITYINOPTIMEFRAME CONSUMPTION Capacity of work center in the operation time frame
P_RSHCAPINEXOPSPERIODFORSCHED CONSUMPTION Capacity of work center in the operation time frame
P_RSHEXMUDAYOPSFORSCHED CONSUMPTION Private view for opeartion time in seconds
P_RSHEXMUDAYOPSFORSCHEDCAPPRDY CONSUMPTION Operation Consumption View
P_RSHEXMUDAYOPSFORSCHEDCAPPRWD CONSUMPTION Operation Capacity Per Work Day
P_RSHEXMUDAYOPSFORSCHEDTTLCAP CONSUMPTION Operation Total Capacity
P_RSHEXOPSFORSCHEDULING CONSUMPTION In process and Dispatched operations for scheduling
P_RSHEXOPSINSECSFORSCHED CONSUMPTION Operation work details for consumption calculation
P_RSHEXOPSPERIOD2FORSCHED CONSUMPTION Return time interval spanned by operations of maint orders
P_RSHEXOPSPERIOD3FORSCHED CONSUMPTION Return date range spanned by operations of maint orders
P_RSHEXOPSPERIODFORSCHED CONSUMPTION Return time interval spanned by operations
P_RSHMAINTASSETBOARD CONSUMPTION Maintenance Asset Board
P_RSHMAINTASSETBOARDSHAPES CONSUMPTION Maintenance asset board shapes
P_RSHMAINTORDOP1STSCHEDCREATED CONSUMPTION First Schedule created for Maint.Op.
P_RSHMAINTORDOP1STSCHEDSTARTED CONSUMPTION First Schedule started for the Maintenance Order Operation
P_RSHMAINTORDOPFIRSTMAINTSCHED CONSUMPTION Maintenance Operations with First Maintenance Schedule
P_RSHMAINTSCHEDOPERATIONS CONSUMPTION Operations from frozen schedule
P_RSHMNTSCHDORDOPWOEXPLREL CONSUMPTION Schedule Operations w/o explicit rel
P_RSHOPERATIONCAPACITYPERDAY CONSUMPTION Operation Consumption View
P_RSHOPERATIONCAPACITYPRWRKDAY CONSUMPTION Operation Capacity Per Work Day
P_RSHOPERATIONDURATIONINSECOND CONSUMPTION Maintenance Operations with Durations in Seconds
P_RSHOPERATIONEXPLICITRELATION CONSUMPTION Operations with explicit Relations
P_RSHOPERATIONIMPLICITRELATION CONSUMPTION Operations with implicit Relations
P_RSHOPERATIONRELATIONSHIPS CONSUMPTION Operations with Relationships
P_RSHOPERATIONS CONSUMPTION Maintenance Operations
P_RSHOPERATIONSBASE CONSUMPTION Maintenance Operations Base Details
P_RSHOPERATIONSFORKPI CONSUMPTION Operations and Sub Operations for overview page
P_RSHOPERATIONSFORUTILIZATION CONSUMPTION Operations and Sub Operations for utilization
P_RSHOPERATIONSWOEXPLICITRELAT CONSUMPTION Operations without explicit Relations
P_RSHOPERATIONTIMEFRAME CONSUMPTION Return time interval spanned by operations
P_RSHOPERATIONTIMEINSECONDS CONSUMPTION Private view for opeartion time in seconds
P_RSHOPERATIONTOTALCAPACITY CONSUMPTION Operation Total Capacity
P_RSHOPERATIONWITHCAPACITY CONSUMPTION Operation and Capacity View
P_RSHOPERATIONWORKDETAILS CONSUMPTION Operation work details for consumption calculation
P_RSHOPERATIONWORKPERDAY CONSUMPTION Operation Work per Day
P_RSHOPERWORKFORSCHEDULING CONSUMPTION Operation work for scheduling
P_RSHOPINMAINTSCHEDSIMULATION CONSUMPTION Operations in Maintenance Schedule
P_RSHORDEROPERATIONDATERANGE CONSUMPTION Return date range spanned by operations of maint orders
P_RSHORDEROPERATIONTIMEFRAME CONSUMPTION Return time interval spanned by operations of maint orders
P_RSHORDERPROCESSINGSTATUS CONSUMPTION Processing Status for Orders
P_RSHSMLTDOPCAPACITY CONSUMPTION Simulated Operation Capacity
P_RSHSMLTDOPCAPACITYPERWEEK CONSUMPTION Work distributed per day
P_RSHSMLTDOPCONSUMPTION CONSUMPTION Simulated Operation Duration based on Work Center Capacity
P_RSHSMLTDOPINSECONDS CONSUMPTION Consumption considering simulated operation
P_RSHSMLTDWRKCTRUTILPERWEEK CONSUMPTION Utilization Per Week
P_RSHSMLTDWRKCTRUTILZNPERDAY CONSUMPTION Utilization per day
P_RSHWCCONSUMPTIONPERWEEK CONSUMPTION Utilization percentage values for next 4 weeks
P_RSHWCUTILIZATION CONSUMPTION Operations
P_RSHWCUTILIZATIONPERWEEK CONSUMPTION Operations
P_RSHWRKCTRUSEDINPLNGSCHEDULE CONSUMPTION Work Centers used in Schedules
P_SCHEDPRODNWRKCTRMNTROPS CONSUMPTION Schedule Overview Operations
P_SETTLEMENTACTUALSETTLEDVALUE CONSUMPTION Possible senders for settled object
P_SETTLEMENTSENDER CONSUMPTION Possible senders for settled object
P_SETTLMTSNDRDOC CONSUMPTION Possible senders for settled object
P_SFIATOPACTYPLNDMATLRET CONSUMPTION Shop Floor Item At OA Planned Material Return
P_SFIATOPACTYPLNDMATLRETQTS CONSUMPTION SFI at OA Planned Material Return with Quantities
P_SFIOPACTYPLANINSPCHAR CONSUMPTION Operation Activity Based PlannedInspChar
P_SHOPFLOORITEMATOPACTYCOMP CONSUMPTION SFI Planned Component at OA, Incl. Unplanned Assemblies
P_SHOPFLOORITEMATOPACTYCOMP2 CONSUMPTION SFI Planned Component at OA, Incl. Unplanned Assemblies
P_SLSDOCFLFLLMNTANALYZER1 CONSUMPTION SOFA Main List Step 1
P_SLSDOCFLFLLMNTANALYZER2 CONSUMPTION SOFA Main List Step 2
P_SLSDOCFLFLLMNTANALYZER3 CONSUMPTION SOFA Main List Step 3
P_SLSDOCFLFLLMNTANALYZER4 CONSUMPTION SOFA Main List Step 4
P_SLSDOCFLFLLMNTANALYZERISS1 CONSUMPTION SOFA Main List: Issues Step 1
P_SLSDOCFLFLLMNTANALYZERISS2 CONSUMPTION SOFA Main List: Issues Step 2
P_SLSORDFLFMTPROCHIERNODE1 CONSUMPTION Sales Order Fulfillment Process Hierarchy Node 1
P_SLSORDFLFMTPROCHIERNODE2 CONSUMPTION Sales Order Fulfillment Process Hierarchy Node 2
P_SLSORDFLFMTSUPPROCSQNC CONSUMPTION Sales Order Fulfillment Supply Process Sequence
P_SLSORDPROCFLOW11 CONSUMPTION Sales Order Process Flow: Level +1 Manufacturing Orders
P_STATKEYFIGALLOBJECT CONSUMPTION SKF Where Used All Objects
P_STATKEYFIGCOSTCENTER CONSUMPTION SKF Where Used Cost Centers
P_WHEREUSDPRFTCTRORDER CONSUMPTION Where-Used List – Profit Centers – Order
P_WRKCTRMNTRCALCFIELDS CONSUMPTION WorkCenter Monitor Calculations
P_WRKCTRMNTRPACEMAKEROPS CONSUMPTION Pacemaker Operations
E_LOGISTICSORDER EXTENSION Logistics Order – Extension Include View
E_PRODUCTCOSTCTRLGORDER EXTENSION Include View for PCC Order